If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0424243203020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.673512,"lon":-113.434107,"icon":""}]} |
Location: 02/03-32-042-24W4/0 | |
Location Alias: 02/03-32-42-24 W4M | |
Location Alias 2: 02/03-32-042-24 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 042 | |
Meridian: 4 | |
Range: 24 | |
Section: 32 | |
County/Municipality: Ponoka County | |
Well Name: TRAVERSE 102 CHIGWELL 3-32-42-24 | |
Operator Name: Traverse Energy Ltd. | |
License Number: 0485641 | |
License Date: 2017-10-02 | |
License Status: Issued | |
Spud Date: 2017-10-17 | |
Final Drill Date: 2017-10-28 | |
Well Total Depth: 4410.00 m | |
Surface Hole Latitude: 52.673512 | |
Surface Hole Longitude: -113.434107 |
Date | Event |
---|---|
2017-10-02 | Obtained License |
2017-10-18 | Surface Casing Operation Performed |
2017-10-21 | Direction Drilling Operation Performed - Deviate |
2017-10-23 | Direction Drilling Operation Performed - Horizontal |
2017-10-28 | Finished Drilling |
2017-10-28 | Well Log Performed |
2017-10-28 | Well Mode changed to Drilled and Cased |
2017-10-30 | Production Casing Operation Performed |
2017-10-31 | Rig Released |
2017-11-05 | Perforation Treatment Performed - Jet Perforation |
2017-11-21 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-11-22 | Perforation Treatment Performed - Jet Perforation |
2017-11-22 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-11-25 | Perforation Treatment Performed - Jet Perforation |
2017-11-25 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-11-26 | Perforation Treatment Performed - Jet Perforation |
2017-11-26 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-11-27 | Perforation Treatment Performed - Jet Perforation |
2017-11-27 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-11-28 | Perforation Treatment Performed - Jet Perforation |
2017-11-28 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-11-29 | Perforation Treatment Performed - Jet Perforation |
2017-11-29 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-11-30 | Perforation Treatment Performed - Jet Perforation |
2017-11-30 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-12-01 | Perforation Treatment Performed - Jet Perforation |
2017-12-01 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-01-03 | Well Began Production |
2018-01-03 | Well Fluid changed to Crude Oil |
2018-01-03 | Well Mode changed to Pumping |
2020-03-01 | Well Fluid changed to Crude Oil |
2020-03-01 | Well Mode changed to Suspended |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2017-10-17 | Trinidad Drilling Ltd. | 420 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2017-10-21 | 1754.60 | Deviate (5 - 79 degrees) |
2017-10-23 | 2140.50 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2017-11-05 | Perforation | 4393.20 | 4394.20 | 8 |
2017-11-25 | Multi-Stage Fracture | 4186.00 | 4224.00 | 0 |
2017-11-25 | Perforation | 4136.50 | 4174.50 | 12 |
2017-11-25 | Multi-Stage Fracture | 4136.50 | 4174.50 | 0 |
2017-11-26 | Perforation | 4087.00 | 4125.00 | 12 |
2017-11-26 | Multi-Stage Fracture | 4087.00 | 4125.00 | 0 |
2017-11-26 | Perforation | 4037.50 | 4075.50 | 12 |
2017-11-26 | Multi-Stage Fracture | 4037.50 | 4075.50 | 0 |
2017-11-26 | Perforation | 3988.00 | 4026.00 | 12 |
2017-11-26 | Multi-Stage Fracture | 3988.00 | 4026.00 | 0 |
2017-11-26 | Perforation | 3938.50 | 3976.50 | 12 |
2017-11-21 | Multi-Stage Fracture | 4393.20 | 4394.20 | 0 |
2017-11-26 | Multi-Stage Fracture | 3938.50 | 3976.50 | 0 |
2017-11-26 | Perforation | 3889.00 | 3927.00 | 12 |
2017-11-26 | Multi-Stage Fracture | 3889.00 | 3927.00 | 0 |
2017-11-27 | Perforation | 3839.50 | 3877.50 | 12 |
2017-11-27 | Multi-Stage Fracture | 3839.50 | 3877.50 | 0 |
2017-11-27 | Perforation | 3790.00 | 3828.00 | 12 |
2017-11-27 | Multi-Stage Fracture | 3790.00 | 3828.00 | 0 |
2017-11-27 | Perforation | 3740.50 | 3778.50 | 12 |
2017-11-27 | Multi-Stage Fracture | 3740.50 | 3778.50 | 0 |
2017-11-27 | Perforation | 3691.00 | 3729.00 | 12 |
2017-11-22 | Perforation | 4334.50 | 4372.50 | 12 |
2017-11-27 | Multi-Stage Fracture | 3691.00 | 3729.00 | 0 |
2017-11-27 | Perforation | 3641.50 | 3679.50 | 12 |
2017-11-27 | Multi-Stage Fracture | 3641.50 | 3679.50 | 0 |
2017-11-27 | Perforation | 3592.00 | 3630.00 | 12 |
2017-11-27 | Multi-Stage Fracture | 3592.00 | 3630.00 | 0 |
2017-11-27 | Perforation | 3542.50 | 3580.50 | 12 |
2017-11-27 | Multi-Stage Fracture | 3542.50 | 3580.50 | 0 |
2017-11-28 | Perforation | 3493.00 | 3531.00 | 12 |
2017-11-28 | Multi-Stage Fracture | 3493.00 | 3531.00 | 0 |
2017-11-28 | Perforation | 3443.50 | 3481.50 | 12 |
2017-11-22 | Multi-Stage Fracture | 4334.50 | 4372.50 | 0 |
2017-11-28 | Multi-Stage Fracture | 3443.50 | 3481.50 | 0 |
2017-11-28 | Perforation | 3394.00 | 3432.00 | 12 |
2017-11-28 | Multi-Stage Fracture | 3394.00 | 3432.00 | 0 |
2017-11-28 | Perforation | 3344.50 | 3382.50 | 12 |
2017-11-28 | Multi-Stage Fracture | 3344.50 | 3382.50 | 0 |
2017-11-28 | Perforation | 3295.00 | 3333.00 | 12 |
2017-11-28 | Multi-Stage Fracture | 3295.00 | 3333.00 | 0 |
2017-11-28 | Perforation | 3245.50 | 3283.50 | 12 |
2017-11-28 | Multi-Stage Fracture | 3245.50 | 3283.50 | 0 |
2017-11-28 | Perforation | 3196.00 | 3234.00 | 12 |
2017-11-25 | Perforation | 4285.00 | 4323.00 | 12 |
2017-11-28 | Multi-Stage Fracture | 3196.00 | 3234.00 | 0 |
2017-11-29 | Perforation | 3146.50 | 3184.50 | 12 |
2017-11-29 | Multi-Stage Fracture | 3146.50 | 3184.50 | 0 |
2017-11-29 | Perforation | 3097.00 | 3135.00 | 12 |
2017-11-29 | Multi-Stage Fracture | 3097.00 | 3135.00 | 0 |
2017-11-29 | Perforation | 3047.50 | 3085.50 | 12 |
2017-11-29 | Multi-Stage Fracture | 3047.50 | 3085.50 | 0 |
2017-11-29 | Perforation | 2998.00 | 3036.00 | 12 |
2017-11-29 | Multi-Stage Fracture | 2998.00 | 3036.00 | 0 |
2017-11-29 | Perforation | 2948.50 | 2986.50 | 12 |
2017-11-25 | Multi-Stage Fracture | 4285.00 | 4323.00 | 0 |
2017-11-29 | Multi-Stage Fracture | 2948.50 | 2986.50 | 0 |
2017-11-29 | Perforation | 2899.00 | 2937.00 | 12 |
2017-11-29 | Multi-Stage Fracture | 2899.00 | 2937.00 | 0 |
2017-11-29 | Perforation | 2849.50 | 2887.50 | 12 |
2017-11-29 | Multi-Stage Fracture | 2849.50 | 2887.50 | 0 |
2017-11-30 | Perforation | 2800.00 | 2838.00 | 12 |
2017-11-30 | Multi-Stage Fracture | 2800.00 | 2838.00 | 0 |
2017-11-30 | Perforation | 2750.50 | 2788.50 | 12 |
2017-11-30 | Multi-Stage Fracture | 2750.50 | 2788.50 | 0 |
2017-11-30 | Perforation | 2701.00 | 2739.00 | 12 |
2017-11-25 | Perforation | 4235.50 | 4273.50 | 12 |
2017-11-30 | Multi-Stage Fracture | 2701.00 | 2739.00 | 0 |
2017-11-30 | Perforation | 2651.50 | 2689.50 | 12 |
2017-11-30 | Multi-Stage Fracture | 2651.50 | 2689.50 | 0 |
2017-11-30 | Perforation | 2602.00 | 2640.00 | 12 |
2017-11-30 | Multi-Stage Fracture | 2602.00 | 2640.00 | 0 |
2017-11-30 | Perforation | 2552.50 | 2590.50 | 12 |
2017-11-30 | Multi-Stage Fracture | 2552.50 | 2590.50 | 0 |
2017-11-30 | Perforation | 2503.00 | 2541.00 | 12 |
2017-11-30 | Multi-Stage Fracture | 2503.00 | 2541.00 | 0 |
2017-11-30 | Perforation | 2453.50 | 2491.50 | 12 |
2017-11-25 | Multi-Stage Fracture | 4235.50 | 4273.50 | 0 |
2017-11-30 | Multi-Stage Fracture | 2453.50 | 2491.50 | 0 |
2017-12-01 | Perforation | 2404.00 | 2442.00 | 12 |
2017-12-01 | Multi-Stage Fracture | 2404.00 | 2442.00 | 0 |
2017-12-01 | Perforation | 2354.50 | 2392.50 | 12 |
2017-12-01 | Multi-Stage Fracture | 2354.50 | 2392.50 | 0 |
2017-12-01 | Perforation | 2305.00 | 2343.00 | 12 |
2017-12-01 | Multi-Stage Fracture | 2305.00 | 2343.00 | 0 |
2017-12-01 | Perforation | 2255.50 | 2293.50 | 12 |
2017-12-01 | Multi-Stage Fracture | 2255.50 | 2293.50 | 0 |
2017-12-01 | Perforation | 2206.00 | 2244.00 | 12 |
2017-11-25 | Perforation | 4186.00 | 4224.00 | 12 |
2017-12-01 | Multi-Stage Fracture | 2206.00 | 2244.00 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-11-21 | 2017-12-01 | 2,032 | 36,305 | N/A |
2 | 2017-11-22 | 2017-12-01 | 2,032 | 0 | N/A |
3 | 2017-11-22 | 2017-11-22 | 2,032 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 90.4144 | N/A | |||
HCL 15% | Trican Well Service | Acid | Hydrogen Chloride | 7647-01-0 | 100 | 0.941 | N/A | |
Water | 7732-18-5 | 100 | 0.941 | N/A | ||||
MS-8 (Mutual Solvent) | Trican Well Service | Acid | diethylene glycol monobutyl ether | 112-34-5 | 100 | 0.0025 | N/A | |
AQUCAR DB20 Biocide | Trican Well Service | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0123 | N/A | |
2-mercaptoethanol | 60-24-2 | 100 | 0.0123 | N/A | ||||
dibromoacetonitrile | 3252-43-5 | 100 | 0.0123 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0123 | N/A | ||||
sodium bromide | 7647-15-6 | 100 | 0.0123 | N/A | ||||
CC-8 Clay Stabilizer | Trican Well Service | Clay Control | choline chloride | 67-48-1 | 100 | 0.1017 | N/A | |
non-hazardous ingredients | Not Available | 100 | 0.1017 | N/A | ||||
ASA-61 Antisludge | Trican Well Service | Demulsifier | alkylbenzenesulfonic acid | 68584-22-5 | 100 | 0.0088 | N/A | |
benzenesulfonic acid. decyl(sulfophenoxy)-. disodium salt | 36445-71-3 | 100 | 0.0088 | N/A | ||||
dipropylene glycol | 25265-71-8 | 100 | 0.0088 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0088 | N/A | ||||
FR-23 Friction Reducer | Trican Well Service | Gelling Agent | No hazardous ingredients | Not Available | 100 | 0.1392 | N/A | |
AI-11 Corrosion Inhibitor | Trican Well Service | Iron Control | non-hazardous ingredients | Not Available | 100 | 0.0072 | N/A | |
potassium iodide | 7681-11-0 | 100 | 0.0072 | N/A | ||||
propargyl alcohol | 107-19-7 | 100 | 0.0071 | N/A | ||||
propargyl alcohol derivative | Not Available | 100 | 0.0072 | N/A | ||||
IC-11 Iron Control | Trican Well Service | Iron Control | 2-mercaptoethanol | 60-24-2 | 100 | 0.0033 | N/A | |
aqua ammonia | 7664-41-7 | 100 | 0.0033 | N/A | ||||
cupric chloride dihydrate | 10125-13-0 | 100 | 0.0033 | N/A | ||||
Non hazardous ingredients | Not Available | 100 | 0.0033 | N/A | ||||
potassium iodide | 7681-11-0 | 100 | 0.0033 | N/A | ||||
S-17X (Surfactant) | Trican Well Service | Surfactant | 1-hexanol. 2-ethyl-. manuf. of. by-products from. distn. residues |
68609-68-7 | 100 | 0.0883 | N/A | |
benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol | 26836-07-7 | 100 | 0.0883 | N/A | ||||
methanol | 67-56-1 | 100 | 0.0883 | N/A | ||||
methyloxirane polymer with oxirane | 11/6/9003 | 100 | 0.0883 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0883 | N/A | ||||
2 | Sand - Tier 2 (40/70) | Trican Well Service | Aluminum Oxide | 1344-28-1 | 100 | 6.4739 | N/A | |
Crystalline silica. quartz | 14808-60-7 | 100 | 6.4739 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 6.4739 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 6.4739 | N/A | ||||
Sand - Tier 2 (50/140) | Trican Well Service | Aluminum Oxide | 1344-28-1 | 100 | 2.1335 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 2.1334 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 2.1334 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 2.1334 | N/A | ||||
3 | HCL 28% | Trican Well Service | Acid | Hydrogen Chloride | 7647-01-0 | 100 | 0.3816 | N/A |
Water | 7732-18-5 | 100 | 0.3816 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2017-11-17 | 2017-11-30 | Surface Water - Lake | 41000 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2018 | 7377 | 0.0 | 0.0 | 0.0 |
2019 | 4470 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-10-23 | No Incident Encountered | 0.00 | 0.00 |
2017-11-18 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]