If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0425020403000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.584638,"lon":-114.232238,"icon":""}]} |
Location: 00/03-04-042-02W5/0 | |
Location Alias: 00/03-04-42-02 W5M | |
Location Alias 2: 00/03-04-042-02 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 042 | |
Meridian: 5 | |
Range: 02 | |
Section: 04 | |
County/Municipality: Ponoka County | |
Well Name: JOURNEY GILBY 3-4-42-2 | |
Operator Name: Journey Energy Inc. | |
License Number: 0175937 | |
License Date: 1995-02-09 | |
License Status: Amended | |
Spud Date: 1995-03-06 | |
Final Drill Date: 1995-03-14 | |
Well Total Depth: 1960.00 m | |
Surface Hole Latitude: 52.584638 | |
Surface Hole Longitude: -114.232238 |
Date | Event |
---|---|
1995-02-09 | Obtained License |
1995-03-08 | Surface Casing Operation Performed |
1995-03-14 | Finished Drilling |
1995-03-14 | Well Log Performed |
1995-03-14 | Well Mode changed to Drilled and Cased |
1995-03-15 | Drill Stem Test Performed |
1995-03-17 | Production Casing Operation Performed |
1995-03-17 | Rig Released |
1995-04-12 | Well Log Performed |
1995-04-15 | Well Log Performed |
1995-04-17 | Perforation Treatment Performed - Jet Perforation |
1995-04-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1995-12-20 | Well Began Production |
1995-12-20 | Well Fluid changed to Gas |
1995-12-20 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1995-04-17 | Perforation | 1911.50 | 1914.50 | 13 |
1995-04-17 | Perforation | 1916.50 | 1922.50 | 13 |
1995-04-19 | Acid Treatment | 1911.50 | 1922.50 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1995 | 289 | 0.0 | 0.0 | 0.0 |
1996 | 8617 | 0.0 | 0.0 | 0.0 |
1997 | 2357 | 0.0 | 0.0 | 0.0 |
1998 | 7999 | 0.0 | 0.0 | 0.0 |
1999 | 8585 | 0.0 | 0.0 | 0.0 |
2000 | 8661 | 0.0 | 0.0 | 0.0 |
2001 | 8417 | 0.0 | 0.0 | 0.0 |
2002 | 7579 | 0.0 | 0.0 | 0.0 |
2003 | 8486 | 0.0 | 0.0 | 0.0 |
2004 | 8758 | 0.0 | 0.0 | 0.0 |
2005 | 8625 | 0.0 | 0.0 | 0.0 |
2006 | 8708 | 0.0 | 0.0 | 0.0 |
2007 | 8700 | 0.0 | 0.0 | 0.0 |
2008 | 8771 | 0.0 | 0.0 | 0.0 |
2009 | 8597 | 0.0 | 0.0 | 0.0 |
2010 | 8563 | 0.0 | 0.0 | 0.0 |
2011 | 8657 | 0.0 | 0.0 | 0.0 |
2012 | 8715 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8759 | 0.0 | 0.0 | 0.0 |
2015 | 8759 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 3860 | 0.0 | 0.0 | 0.0 |
For data sources see[5]