X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0425023204000

Well Details

Well ID: 0425023204000
Loading map...
Location: 00/04-32-042-02W5/0
Location Alias: 00/04-32-42-02 W5M
Location Alias 2: 00/04-32-042-02 W5/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 5
Range: 02
Section: 32
County/Municipality: Ponoka County
Well Name: NAL HOMRIM 4-32-42-2
Operator Name: NAL Resources Limited
License Number: 0349963
License Date: 2006-01-24
License Status: RecCertified
Spud Date: 2006-02-20
Final Drill Date: 2006-02-21
Well Total Depth: 1117.00 m
Surface Hole Latitude: 52.661935
Surface Hole Longitude: -114.255106

For data sources see[1][2]

Well History

Date Event
2006-01-24 Obtained License
2006-01-29 Surface Casing Operation Performed
2006-02-09 Well Log Performed
2006-02-20 Direction Drilling Operation Performed - Deviate
2006-02-21 Finished Drilling
2006-02-21 Production Casing Operation Performed
2006-02-21 Rig Released
2006-02-21 Well Mode changed to Drilled and Cased
2006-03-05 Well Log Performed
2006-03-12 Perforation Treatment Performed - Jet Perforation
2006-03-12 Well Log Performed
2006-03-24 Perforation Treatment Performed - Jet Perforation
2006-03-24 Well Log Performed
2006-05-25 Perforation Treatment Performed - Fractured
2017-06-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-06-06 Plug Back Performed
2017-06-06 Well Mode changed to Abandoned Zone
2017-06-16 Well Abandoned
2017-06-16 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2006-02-20 117.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-03-12 Perforation 858.50 859.50 20
2006-03-24 Perforation 818.00 819.00 17
2006-03-24 Perforation 770.00 771.00 17
2006-03-24 Perforation 702.00 703.00 17
2006-03-24 Perforation 672.00 673.00 17
2006-03-24 Perforation 650.00 651.00 17
2006-03-24 Perforation 642.00 673.00 17
2006-03-24 Perforation 621.00 622.00 17
2006-05-25 Fracture 621.00 859.50 0
2017-06-06 Packing Device Capped w/Cement 602.00 615.00 0
2006-03-12 Perforation 818.00 819.00 20
2006-03-12 Perforation 770.00 771.00 20
2006-03-12 Perforation 702.00 703.00 20
2006-03-12 Perforation 672.00 673.00 20
2006-03-12 Perforation 650.00 651.00 20
2006-03-12 Perforation 642.30 643.30 20
2006-03-12 Perforation 621.00 622.00 20
2006-03-24 Perforation 858.50 859.50 17

For data sources see[5]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-06-16 No Incident Encountered 0.00 0.00

For data sources see[6]

References