X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0425030916000

Well Details

Well ID: 0425030916000
Loading map...
Location: 00/16-09-042-03W5/0
Location Alias: 00/16-09-42-03 W5M
Location Alias 2: 00/16-09-042-03 W5/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 5
Range: 03
Section: 09
County/Municipality: Ponoka County
Well Name: BONAVISTA GILBY 16-9-42-3
Operator Name: Bonavista Energy Corporation
License Number: 0288340
License Date: 2003-06-12
License Status: Amended
Spud Date: 2003-07-09
Final Drill Date: 2003-07-19
Well Total Depth: 2229.00 m
Surface Hole Latitude: 52.604148
Surface Hole Longitude: -114.366123

For data sources see[1][2]

Well History

Date Event
2003-06-12 Obtained License
2003-07-11 Surface Casing Operation Performed
2003-07-13 Direction Drilling Operation Performed - Deviate
2003-07-19 Finished Drilling
2003-07-19 Well Log Performed
2003-07-19 Well Mode changed to Drilled and Cased
2003-07-20 Well Log Performed
2003-07-21 Production Casing Operation Performed
2003-07-21 Rig Released
2003-07-23 Perforation Treatment Performed - Jet Perforation
2003-07-24 Well Log Performed
2003-07-29 Perforation Treatment Performed - Fractured
2003-07-29 Well Fluid changed to Gas
2003-07-29 Well Mode changed to Testing
2003-08-19 Perforation Treatment Performed - Jet Perforation
2003-08-19 Well Log Performed
2003-08-20 Well Log Performed
2003-08-28 Perforation Treatment Performed - Fractured
2003-09-19 Perforation Treatment Performed - Chemical Squeeze
2004-01-09 Well Began Production
2004-01-09 Well Fluid changed to Gas
2004-01-09 Well Mode changed to Flowing
2004-01-10 Well Fluid changed to Gas
2004-01-10 Well Mode changed to Flowing
2014-11-01 Well Fluid changed to Gas
2014-11-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2003-07-13 1085.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-07-23 Perforation 2119.00 2124.00 17
2003-07-29 Fracture 2119.00 2124.00 0
2003-08-19 Perforation 2001.00 2006.00 17
2003-08-28 Fracture 2001.00 2006.00 0
2003-09-19 Chemical Squeeze 2001.00 2006.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 147 0.0 0.0 0.0
2004 8119 0.0 0.0 0.0
2005 8734 0.0 0.0 0.0
2006 8374 0.0 0.0 0.0
2007 6537 0.0 0.0 0.0
2008 5741 0.0 0.0 0.0
2009 6956 0.0 0.0 0.0
2010 8687 0.0 0.0 0.0
2011 8471 0.0 0.0 0.0
2012 8060 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8216 0.0 0.0 0.0
2015 8293 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8337 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References