If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0425042904000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.63858,"lon":-114.535992,"icon":""}]} |
Location: 00/04-29-042-04W5/0 | |
Location Alias: 00/04-29-42-04 W5M | |
Location Alias 2: 00/04-29-042-04 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 042 | |
Meridian: 5 | |
Range: 04 | |
Section: 29 | |
County/Municipality: Ponoka County | |
Well Name: BEC HZ WILSONCK 4-29-42-4 | |
Operator Name: Bonavista Energy Corporation | |
License Number: 0479180 | |
License Date: 2016-03-22 | |
License Status: Issued | |
Spud Date: 2016-04-10 | |
Final Drill Date: 2016-04-19 | |
Well Total Depth: 3374.00 m | |
Surface Hole Latitude: 52.638580 | |
Surface Hole Longitude: -114.535992 |
Date | Event |
---|---|
2016-03-22 | Obtained License |
2016-04-11 | Surface Casing Operation Performed |
2016-04-12 | Direction Drilling Operation Performed - Deviate |
2016-04-16 | Direction Drilling Operation Performed - Horizontal |
2016-04-17 | Intermediate Casing Operation Performed |
2016-04-19 | Finished Drilling |
2016-04-19 | Well Log Performed |
2016-04-19 | Well Mode changed to Drilled and Cased |
2016-04-21 | Liner Casing Operation Performed |
2016-04-21 | Perforation Treatment Performed - Open-Hole Completion |
2016-04-21 | Rig Released |
2016-07-21 | Well Log Performed |
2016-07-23 | Perforation Treatment Performed - Multi-Stage Fracture |
2016-07-25 | Well Fluid changed to Gas |
2016-07-25 | Well Mode changed to Testing |
2016-08-02 | Well Began Production |
2016-08-02 | Well Fluid changed to Gas |
2016-08-02 | Well Mode changed to Flowing |
2017-06-06 | Well Fluid changed to Gas |
2017-06-06 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2016-04-10 | Savanna Drilling Corp. | 631 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2016-04-12 | 908.60 | Deviate (5 - 79 degrees) |
2016-04-16 | 2301.70 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2016-04-21 | Open Hole/Barefoot Completion | 3370.00 | 3374.00 | 0 |
2016-07-23 | Multi-Stage Fracture | 2524.70 | 2524.80 | 0 |
2016-07-23 | Multi-Stage Fracture | 2442.20 | 2442.30 | 0 |
2016-07-23 | Multi-Stage Fracture | 3346.30 | 3346.40 | 0 |
2016-07-23 | Multi-Stage Fracture | 3274.00 | 3274.10 | 0 |
2016-07-23 | Multi-Stage Fracture | 3164.80 | 3164.90 | 0 |
2016-07-23 | Multi-Stage Fracture | 3055.60 | 3055.70 | 0 |
2016-07-23 | Multi-Stage Fracture | 2946.20 | 2946.30 | 0 |
2016-07-23 | Multi-Stage Fracture | 2837.10 | 2837.20 | 0 |
2016-07-23 | Multi-Stage Fracture | 2741.30 | 2741.40 | 0 |
2016-07-23 | Multi-Stage Fracture | 2632.30 | 2632.40 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2016-07-23 | 2016-07-23 | 2,086 | 635 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Nitrogen | Not Available | 100 | 0.4427 | N/A | |||
Water | Not Available | 100 | 54.6216 | N/A | ||||
20/40 Domestic Sand | Step Energy Services | Crystalline Silica | 14808-60-7 | 100 | 44.1252 | N/A | ||
Econocide B1008 (Biocide) | Step Energy Services | Bactericide/Biocide | 2-bromo-2-nitro.3-diol | 52-51-7 | 100 | 0.0068 | N/A | |
Methyl Alcohol | 67-56-1 | 100 | 0.0068 | N/A | ||||
Non-Hazardous Ingredients | Not Available | 100 | 0.0068 | N/A | ||||
SVB-1 (Viscoelastic Breaker) | Step Energy Services | Breaker | Proprietary | Not Available | 100 | 0.0553 | N/A | |
SBL-2 (Buffer) | Step Energy Services | Buffer | Acetic Acid | 64-19-7 | 100 | 0.115 | N/A | |
Non-Hazardous Ingredients | Not Available | 100 | 0.115 | N/A | ||||
SSI-1 (Scale Inhibitor) | Step Energy Services | Scale Inhibitor | Methyl Alcohol | 67-56-1 | 100 | 0.0117 | N/A | |
Non-Hazardous Ingredients | Not Available | 100 | 0.0117 | N/A | ||||
SVS-1 (Viscoelastic Surfactant) | Step Energy Services | Surfactant | Proprietary | Not Available | 100 | 1.0826 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2016-07-22 | 2016-07-23 | Surface Water - Runoff | 600 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2016 | 3690 | 0.0 | 0.0 | 0.0 |
2017 | 8556 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8471 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2016-04-19 | No Incident Encountered | 0.00 | 0.00 |
2016-08-02 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]