If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0425050416000 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
Location: 00/16-04-042-05W5/0 | |
Location Alias: 00/16-04-42-05 W5M | |
Location Alias 2: 00/16-04-042-05 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 042 | |
Meridian: 5 | |
Range: 05 | |
Section: 04 | |
County/Municipality: Clearwater County | |
Well Name: BEC HZ WILLGR 16-4-42-5 | |
Operator Name: Bonavista Energy Corporation | |
License Number: 0433673 | |
License Date: 2011-05-19 | |
License Status: Issued | |
Spud Date: 2011-06-15 | |
Final Drill Date: 2011-07-02 | |
Well Total Depth: 3739.00 m | |
Surface Hole Latitude: 52.582858 | |
Surface Hole Longitude: -114.650537 |
Date | Event |
---|---|
2011-05-19 | Obtained License |
2011-06-16 | Surface Casing Operation Performed |
2011-06-25 | Direction Drilling Operation Performed - Horizontal |
2011-06-27 | Well Log Performed |
2011-06-28 | Intermediate Casing Operation Performed |
2011-07-02 | Finished Drilling |
2011-07-02 | Well Log Performed |
2011-07-02 | Well Mode changed to Drilled and Cased |
2011-07-03 | Liner Casing Operation Performed |
2011-07-03 | Perforation Treatment Performed - Open-Hole Completion |
2011-07-03 | Perforation Treatment Performed - Slotted Liner or Casing |
2011-07-04 | Rig Released |
2011-07-06 | Well Log Performed |
2011-07-14 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-09-19 | Well Began Production |
2011-09-19 | Well Fluid changed to Gas |
2011-09-19 | Well Mode changed to Flowing |
2013-01-01 | Well Fluid changed to Gas |
2013-01-01 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-06-25 | 1903.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-07-03 | Open Hole/Barefoot Completion | 2536.00 | 3739.00 | 0 |
2011-07-14 | Multi-Stage Fracture | 2881.00 | 3018.00 | 0 |
2011-07-14 | Multi-Stage Fracture | 2775.90 | 2881.00 | 0 |
2011-07-14 | Multi-Stage Fracture | 2650.30 | 2775.90 | 0 |
2011-07-14 | Multi-Stage Fracture | 2544.60 | 2650.30 | 0 |
2011-07-03 | Slotted Liner | 2536.00 | 3730.00 | 0 |
2011-07-14 | Multi-Stage Fracture | 3698.50 | 3739.00 | 0 |
2011-07-14 | Multi-Stage Fracture | 3588.90 | 3698.50 | 0 |
2011-07-14 | Multi-Stage Fracture | 3467.10 | 3588.90 | 0 |
2011-07-14 | Multi-Stage Fracture | 3362.60 | 3467.10 | 0 |
2011-07-14 | Multi-Stage Fracture | 3250.40 | 3362.60 | 0 |
2011-07-14 | Multi-Stage Fracture | 3126.40 | 3250.40 | 0 |
2011-07-14 | Multi-Stage Fracture | 3018.00 | 3126.40 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 2474 | 0.0 | 0.0 | 0.0 |
2012 | 7520 | 0.0 | 0.0 | 0.0 |
2013 | 4747 | 0.0 | 0.0 | 0.0 |
2014 | 6966 | 0.0 | 0.0 | 0.0 |
2015 | 8231 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8757 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8352 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]