X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0425052606003

Well Details

Well ID: 0425052606003
Loading map...
Location: 00/06-26-042-05W5/3
Location Alias: 00/06-26-42-05 W5M
Location Alias 2: 00/06-26-042-05 W5/03
Country: Canada
Province: Alberta
Township: 042
Meridian: 5
Range: 05
Section: 26
County/Municipality: Ponoka County
Well Name: BEC PEMBINA 6-26-42-5
Operator Name: Bonavista Energy Corporation
License Number: 0046736
License Date: 1973-07-30
License Status: Abandoned
Spud Date: 1973-10-27
Final Drill Date: 1973-11-24
Well Total Depth: 2255.50 m
Surface Hole Latitude: 52.643867
Surface Hole Longitude: -114.618395

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-07-30 Obtained License
1973-11-23 Drill Stem Test Performed
1973-11-24 Finished Drilling
1973-11-25 Drill Stem Test Performed
1973-11-26 Drill Stem Test Performed
1973-11-27 Production Casing Operation Performed
1973-12-11 Perforation Treatment Performed - Jet Perforation
1973-12-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-12-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-12-17 Perforation Treatment Performed - Jet Perforation
1973-12-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1973-12-20 Perforation Treatment Performed - Jet Perforation
1973-12-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-12-22 Perforation Treatment Performed - Jet Perforation
1973-12-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-12-29 Perforation Treatment Performed - Fractured
1974-09-09 Perforation Treatment Performed - Cement Squeeze
1974-09-11 Perforation Treatment Performed - Jet Perforation
1974-09-12 Perforation Treatment Performed - Acid Wash - No Pressure
1974-09-12 Perforation Treatment Performed - Fractured
1997-02-16 Perforation Treatment Performed - Cement Squeeze
1997-02-16 Plug Back Performed
1997-02-19 Well Log Performed
1997-02-21 Perforation Treatment Performed - Jet Perforation
1997-02-21 Well Log Performed
1997-02-22 Perforation Treatment Performed - Fractured
1998-12-04 Perforation Treatment Performed - Jet Perforation
1998-12-04 Well Log Performed
1998-12-04 Well Mode changed to Drilled and Cased
1998-12-06 Perforation Treatment Performed - Fractured
1998-12-11 Well Log Performed
2009-10-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-10-23 Plug Back Performed
2009-10-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-10-24 Perforation Treatment Performed - Jet Perforation
2009-10-24 Plug Back Performed
2009-10-24 Well Log Performed
2009-10-24 Well Mode changed to Abandoned Zone
2009-10-25 Perforation Treatment Performed - Remedial Casing
2009-10-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-10-28 Perforation Treatment Performed - Jet Perforation
2009-10-28 Well Log Performed
2009-10-29 Perforation Treatment Performed - Remedial Casing
2009-11-02 Well Abandoned
2009-11-02 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1973-12-11 Perforation 2215.90 2220.20 3
1973-12-22 Perforation 1316.10 1318.00 7
1973-12-22 Perforation 1319.50 1320.70 7
1973-12-27 Acid Treatment 1309.40 1320.70 0
1973-12-29 Fracture 1309.40 1320.70 0
1974-09-09 Cement Squeeze 1309.40 1320.70 0
1974-09-11 Perforation 1319.50 1321.00 7
1974-09-12 Acid Wash 1319.50 1321.00 0
1974-09-12 Fracture 1319.50 1321.00 0
1997-02-16 Cement Squeeze 1319.50 1346.90 0
1997-02-21 Perforation 2158.00 2160.00 13
1973-12-12 Acid Treatment 2215.90 2220.20 0
1997-02-22 Fracture 2158.00 2160.00 0
1998-12-04 Perforation 1887.60 1895.90 14
1998-12-06 Fracture 1887.60 1895.90 0
2009-10-23 Packing Device Capped w/Cement 2143.00 2151.00 0
2009-10-24 Packing Device Capped w/Cement 1817.00 1825.00 0
2009-10-24 Perforation 1083.00 1084.00 20
2009-10-25 Remedial Casing Cementing 1083.00 1084.00 0
2009-10-28 Perforation 420.00 421.00 20
2009-10-28 Perforation 513.00 514.00 20
2009-10-28 Packing Device Capped w/Cement 552.00 560.00 0
1973-12-16 Acid Treatment 2215.90 2220.20 0
2009-10-28 Perforation 562.00 563.00 20
2009-10-28 Packing Device Capped w/Cement 502.00 510.00 0
2009-10-29 Remedial Casing Cementing 420.00 421.00 0
1973-12-17 Perforation 2223.80 2229.30 7
1973-12-20 Packing Device Capped w/Cement 2211.30 2211.30 0
1973-12-20 Perforation 1339.90 1342.60 3
1973-12-20 Perforation 1343.90 1346.90 3
1973-12-21 Acid Treatment 1339.90 1346.90 0
1973-12-22 Perforation 1309.40 1313.70 7

For data sources see[4]



References