X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0425052807000

Well Details

Well ID: 0425052807000
Loading map...
Location: 00/07-28-042-05W5/0
Location Alias: 00/07-28-42-05 W5M
Location Alias 2: 00/07-28-042-05 W5/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 5
Range: 05
Section: 28
County/Municipality: Ponoka County
Well Name: BEC HZ PEMBINA 7-28-42-5
Operator Name: Bonavista Energy Corporation
License Number: 0494261
License Date: 2019-04-18
License Status: Amended
Spud Date: 2019-05-15
Final Drill Date: 2019-05-27
Well Total Depth: 6223.00 m
Surface Hole Latitude: 52.645611
Surface Hole Longitude: -114.595173

For data sources see[1][2]


Directional Drilling

Start Date Depth (m) Reason
2019-05-17 1770.70 Deviate (5 - 79 degrees)
2019-05-19 2328.50 Horizontal

For data sources see[3]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-05-30 Open Hole/Barefoot Completion 6196.50 6223.00 0
2019-06-11 Multi-Stage Fracture 5198.90 5199.00 0
2019-06-11 Multi-Stage Fracture 5082.00 5082.10 0
2019-06-11 Multi-Stage Fracture 4954.40 4954.50 0
2019-06-11 Multi-Stage Fracture 4836.00 4836.10 0
2019-06-11 Multi-Stage Fracture 4706.40 4706.50 0
2019-06-11 Multi-Stage Fracture 4589.10 4589.20 0
2019-06-11 Multi-Stage Fracture 4473.50 4473.60 0
2019-06-11 Multi-Stage Fracture 4341.90 4342.00 0
2019-06-11 Multi-Stage Fracture 4222.50 4222.60 0
2019-06-11 Multi-Stage Fracture 4105.70 4105.80 0
2019-06-10 Multi-Stage Fracture 6160.70 6160.80 0
2019-06-11 Multi-Stage Fracture 3986.00 3986.10 0
2019-06-11 Multi-Stage Fracture 3867.80 3867.90 0
2019-06-11 Multi-Stage Fracture 3740.50 3740.60 0
2019-06-11 Multi-Stage Fracture 3622.30 3622.40 0
2019-06-11 Multi-Stage Fracture 3501.00 3501.10 0
2019-06-11 Multi-Stage Fracture 3381.50 3381.60 0
2019-06-11 Multi-Stage Fracture 3257.50 3257.60 0
2019-06-11 Multi-Stage Fracture 3139.00 3139.10 0
2019-06-11 Multi-Stage Fracture 3008.70 3008.80 0
2019-06-12 Multi-Stage Fracture 2887.60 2887.70 0
2019-06-10 Multi-Stage Fracture 6045.80 6045.90 0
2019-06-12 Multi-Stage Fracture 2775.00 2775.10 0
2019-06-12 Multi-Stage Fracture 2644.80 2644.90 0
2019-06-12 Multi-Stage Fracture 2525.40 2525.50 0
2019-06-12 Multi-Stage Fracture 2405.40 2405.50 0
2019-06-10 Multi-Stage Fracture 5926.20 5926.30 0
2019-06-10 Multi-Stage Fracture 5797.40 5797.50 0
2019-06-10 Multi-Stage Fracture 5678.40 5678.50 0
2019-06-10 Multi-Stage Fracture 5561.80 5561.90 0
2019-06-11 Multi-Stage Fracture 5433.80 5433.90 0
2019-06-11 Multi-Stage Fracture 5316.70 5316.80 0

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-06-10 2019-06-12 2,155 6,104 N/A
2 2019-06-10 2019-06-10 2,155 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 hydrochloric acid 7647-01-0 100 2.3104 N/A
water Not Available 100 44.5469 N/A
Sand - Tier 2 (30/50) Trican silica crystalline 14808-60-7 100 16.4297 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0122 N/A
dibromoacetonitrile 3252-43-5 100 0.0122 N/A
non-hazardous ingredients Not Available 100 0.0122 N/A
polyethylene glycol 25322-68-3 100 0.0122 N/A
sodium bromide 7647-15-6 100 0.0122 N/A
CC-10 Trican Clay Control non-hazardous ingredients Not Available 100 0.0489 N/A
AI-11 Trican Corrosion Inhibitor non-hazardous ingredients Not Available 100 0.0086 N/A
potassium iodide 7681-11-0 100 0.0086 N/A
propargyl alcohol 107-19-7 100 0.0086 N/A
propargyl alcohol derivative 38172-91-7 100 0.0086 N/A
DF-2W Trican Defoamer non-hazardous ingredients Not Available 100 0.0002 N/A
propylene glycol 57-55-6 100 0.0002 N/A
FR-24 Trican Friction Reducer distillates (petroleum). hydrotreated light naphthenic 64742-53-6 100 0.0531 N/A
non-hazardous ingredients Not Available 100 0.0531 N/A
IC-8 Trican Iron Control 2-mercaptoethanol 60-24-2 100 0.0072 N/A
cupric chloride 7447-39-4 100 0.0072 N/A
monoethanolamine 141-43-5 100 0.0072 N/A
SI-18 Trican Scale Inhibitor non-hazardous ingredients Not Available 100 0.0425 N/A
ASA-60W Trican Surfactant alkylbenzenesulfonic acid 68584-22-5 100 0.0292 N/A
dipropylene glycol 25265-71-8 100 0.0292 N/A
sodium hexyldiphenyl ether sulfonate 147732-60-3 100 0.0292 N/A
S-28 Trican Surfactant methanol 67-56-1 100 0.0424 N/A
non-hazardous ingredients Not Available 100 0.0424 N/A
solvent naphtha (petroleum). heavy aromatic 64742-94-5 100 0.0424 N/A
S-4W Trican Surfactant diethanolamine 111-42-2 100 0.021 N/A
fatty acid alkanolamide 68603-42-9 100 0.021 N/A
fatty acids. coco. compds. with diethanolamine 61790-63-4 100 0.021 N/A
methanol 67-56-1 100 0.021 N/A
phosphoric acid. mixed decyl and
octyl esters. compds. with diethanolamine
68425-57-0 100 0.021 N/A
2 N2 7727-37-9 100 3.4949 N/A

For data sources see[5]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-06-10 2019-06-12 Surface Water - Runoff 4500
2019-06-10 2019-06-12 Surface Water - Runoff 2400

For data sources see[6]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 4445 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-05-27 No Incident Encountered 0.00 0.00
2019-06-29 No Incident Encountered 0.00 0.00

For data sources see[8]

References