X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0425072508002

Well Details

Well ID: 0425072508002
Loading map...
Location: 00/08-25-042-07W5/2
Location Alias: 00/08-25-42-07 W5M
Location Alias 2: 00/08-25-042-07 W5/02
Country: Canada
Province: Alberta
Township: 042
Meridian: 5
Range: 07
Section: 25
County/Municipality: Clearwater County
Well Name: ITERATION WILLGR 8-25-42-7
Operator Name: Gain Energy Ltd.
License Number: 0027686
License Date: 1965-02-04
License Status: Issued
Spud Date: 1965-03-15
Final Drill Date: 1965-03-30
Well Total Depth: 2002.20 m
Surface Hole Latitude: 52.645073
Surface Hole Longitude: -114.868235

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-02-04 Obtained License
1965-03-30 Finished Drilling
1965-03-30 Well Mode changed to Drilled and Cased
1965-04-01 Production Casing Operation Performed
1965-04-02 Perforation Treatment Performed - Jet Perforation
1965-05-04 Perforation Treatment Performed - Fractured
1977-10-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-10-04 Perforation Treatment Performed - Chemical Squeeze
1980-12-03 Perforation Treatment Performed - Jet Perforation
1980-12-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-01-27 Perforation Treatment Performed - Acid Wash - No Pressure
2003-03-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-03-27 Perforation Treatment Performed - Jet Perforation
2003-03-29 Perforation Treatment Performed - Fractured
2004-03-12 Well Began Production
2004-03-12 Well Fluid changed to Gas
2004-03-12 Well Mode changed to Flowing
2013-12-09 Well Fluid changed to Gas
2013-12-09 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-04-02 Perforation 1982.10 1982.70 7
1988-01-27 Acid Wash 1981.80 1985.40 0
2003-03-25 Packing Device Capped w/Cement 1963.00 1971.00 0
2003-03-27 Perforation 1545.00 1548.00 17
2003-03-29 Fracture 1545.00 1548.00 0
1965-04-02 Perforation 1983.30 1983.60 10
1965-05-04 Fracture 1982.10 1983.60 0
1977-10-03 Acid Treatment 1982.10 1983.60 0
1979-10-04 Chemical Squeeze 1982.10 1983.60 0
1980-12-03 Perforation 1981.80 1982.70 6
1980-12-03 Perforation 1983.00 1984.20 6
1980-12-03 Perforation 1984.90 1985.40 6
1980-12-06 Acid Treatment 1981.80 1985.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 5443 0.0 0.0 0.0
2005 8531 0.0 0.0 0.0
2006 6108 0.0 0.0 0.0
2007 8535 0.0 0.0 0.0
2008 7924 0.0 0.0 0.0
2009 8722 0.0 0.0 0.0
2010 8727 0.0 0.0 0.0
2011 6178 0.0 0.0 0.0
2012 3854 0.0 0.0 0.0
2013 8427 0.0 0.0 0.0
2014 8481 0.0 0.0 0.0
2015 8304 0.0 0.0 0.0
2016 8494 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8713 0.0 0.0 0.0
2019 3048 0.0 0.0 0.0

For data sources see[5]

References