If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0425102102000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.627411,"lon":-115.369645,"icon":""}]} |
Location: 00/02-21-042-10W5/0 | |
Location Alias: 00/02-21-42-10 W5M | |
Location Alias 2: 00/02-21-042-10 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 042 | |
Meridian: 5 | |
Range: 10 | |
Section: 21 | |
County/Municipality: Sunchild Cree 202 | |
Well Name: TQN FERRIER 2-21-42-10 | |
Operator Name: TAQA North Ltd. | |
License Number: 0219447 | |
License Date: 1998-12-07 | |
License Status: Amended | |
Spud Date: 1999-01-18 | |
Final Drill Date: 1999-02-25 | |
Well Total Depth: 3125.00 m | |
Surface Hole Latitude: 52.627411 | |
Surface Hole Longitude: -115.369645 |
Date | Event |
---|---|
1998-12-07 | Obtained License |
1999-01-18 | Well Log Performed |
1999-01-22 | Surface Casing Operation Performed |
1999-01-30 | Direction Drilling Operation Performed - Deviate |
1999-02-25 | Finished Drilling |
1999-02-25 | Well Log Performed |
1999-03-01 | Well Log Performed |
1999-03-24 | Production Casing Operation Performed |
1999-03-25 | Rig Released |
1999-03-25 | Well Mode changed to Drilled and Cased |
1999-03-28 | Well Log Performed |
1999-03-31 | Perforation Treatment Performed - Jet Perforation |
1999-04-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-04-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-04-03 | Perforation Treatment Performed - Jet Perforation |
1999-04-03 | Well Log Performed |
1999-04-03 | Well Mode changed to Drilled and Cased |
1999-07-02 | Well Began Production |
1999-07-02 | Well Fluid changed to Gas |
1999-07-02 | Well Mode changed to Flowing |
1999-10-25 | Perforation Treatment Performed - Fractured |
1999-11-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-11-01 | Perforation Treatment Performed - Jet Perforation |
1999-11-01 | Plug Back Performed |
1999-11-01 | Well Fluid changed to Gas |
1999-11-01 | Well Log Performed |
1999-11-01 | Well Mode changed to Abandoned Zone |
1999-11-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1999-11-03 | Perforation Treatment Performed - Fractured |
1999-11-03 | Plug Back Performed |
1999-11-08 | Well Log Performed |
1999-11-09 | Well Log Performed |
1999-11-10 | Perforation Treatment Performed - Jet Perforation |
1999-11-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-11-11 | Perforation Treatment Performed - Fractured |
2001-06-21 | Perforation Treatment Performed - Cement Squeeze |
2001-06-21 | Plug Back Performed |
2001-06-23 | Perforation Treatment Performed - Jet Perforation |
2001-06-26 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1999-01-30 | 1914.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1999-03-31 | Perforation | 2943.00 | 2947.00 | 20 |
1999-11-03 | Fracture | 2844.00 | 2846.50 | 0 |
1999-11-03 | Fracture | 2837.50 | 2840.50 | 0 |
1999-11-03 | Packing Device Capped w/Cement | 2817.00 | 2825.00 | 0 |
1999-11-10 | Perforation | 2604.50 | 2606.00 | 20 |
1999-11-11 | Acid Treatment | 2604.50 | 2606.00 | 0 |
1999-11-11 | Fracture | 2604.50 | 2606.00 | 0 |
2001-06-21 | Cement Squeeze | 2604.50 | 2606.00 | 0 |
2001-06-23 | Perforation | 2837.50 | 2846.50 | 17 |
2001-06-26 | Fracture | 2837.50 | 2846.50 | 0 |
1999-04-01 | Acid Treatment | 2943.00 | 2947.00 | 0 |
1999-04-03 | Perforation | 2949.00 | 2951.50 | 20 |
1999-04-03 | Acid Treatment | 2949.00 | 2951.50 | 0 |
1999-10-25 | Fracture | 2949.00 | 2951.50 | 0 |
1999-10-25 | Fracture | 2943.00 | 2947.00 | 0 |
1999-11-01 | Packing Device Capped w/Cement | 2915.00 | 2923.00 | 0 |
1999-11-01 | Perforation | 2844.00 | 2846.50 | 17 |
1999-11-01 | Perforation | 2837.50 | 2840.50 | 17 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1999 | 594 | 0.0 | 0.0 | 0.0 |
For data sources see[6]