X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0425103411003

Well Details

Well ID: 0425103411003
Loading map...
Location: 00/11-34-042-10W5/3
Location Alias: 00/11-34-42-10 W5M
Location Alias 2: 00/11-34-042-10 W5/03
Country: Canada
Province: Alberta
Township: 042
Meridian: 5
Range: 10
Section: 34
County/Municipality: Sunchild Cree 202
Well Name: TQN FERRIER 11-34-42-10
Operator Name: TAQA North Ltd.
License Number: 0282998
License Date: 2003-02-19
License Status: Suspension
Spud Date: 2003-02-24
Final Drill Date: 2003-03-19
Well Total Depth: 2966.00 m
Surface Hole Latitude: 52.661379
Surface Hole Longitude: -115.361448

For data sources see[1][2]

Well History

Date Event
2003-02-19 Obtained License
2003-02-25 Lost Circulation Occurred
2003-03-01 Surface Casing Operation Performed
2003-03-14 Well Log Performed
2003-03-15 Intermediate Casing Operation Performed
2003-03-19 Finished Drilling
2003-03-19 Well Log Performed
2003-03-19 Well Mode changed to Drilled and Cased
2003-03-20 Plug Back Performed
2003-03-20 Well Log Performed
2003-03-21 Rig Released
2003-03-28 Perforation Treatment Performed - Jet Perforation
2003-03-29 Perforation Treatment Performed - Jet Perforation
2003-04-02 Perforation Treatment Performed - Fractured
2004-01-30 Perforation Treatment Performed - Cement Squeeze
2004-01-30 Plug Back Performed
2004-02-04 Perforation Treatment Performed - Jet Perforation
2004-02-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-02-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-02-07 Plug Back Performed
2008-08-09 Perforation Treatment Performed - Jet Perforation
2008-08-09 Well Log Performed
2008-08-11 Perforation Treatment Performed - Fractured
2008-08-12 Well Fluid changed to Gas
2008-08-12 Well Mode changed to Testing
2008-08-19 Well Fluid changed to Gas
2008-08-19 Well Mode changed to Test Completed
2009-01-27 Well Began Production
2009-01-27 Well Fluid changed to Gas
2009-01-27 Well Mode changed to Flowing
2009-04-17 Well Fluid changed to Gas
2009-04-17 Well Mode changed to Pumping
2020-03-01 Well Fluid changed to Gas
2020-03-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-03-28 Perforation 2765.00 2768.00 20
2008-08-11 Fracture 2630.00 2634.00 0
2003-03-29 Perforation 2760.00 2764.00 20
2003-04-02 Fracture 2760.00 2768.00 0
2004-01-30 Cement Squeeze 2760.00 2768.00 0
2004-02-04 Perforation 2876.50 2879.00 20
2004-02-05 Acid Treatment 2876.50 2879.00 0
2004-02-07 Packing Device Capped w/Cement 2647.00 2655.00 0
2004-02-07 Packing Device Capped w/Cement 2862.00 2870.00 0
2008-08-09 Perforation 2630.00 2634.00 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 66 0.0 0.0 0.0
2009 7255 0.0 0.0 0.0
2010 8276 0.0 0.0 0.0
2011 7405 0.0 0.0 0.0
2012 6609 0.0 0.0 0.0
2013 5168 0.0 0.0 0.0
2014 1887 0.0 0.0 0.0
2015 5430 0.0 0.0 0.0
2016 3809 0.0 0.0 0.0
2017 3076 0.0 0.0 0.0
2018 636 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2003-02-25 Lost Circulation 61.00 67.00

For data sources see[6]

References