If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0425130512000 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
Location: 00/12-05-042-13W5/0 | |
Location Alias: 00/12-05-42-13 W5M | |
Location Alias 2: 00/12-05-042-13 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 042 | |
Meridian: 5 | |
Range: 13 | |
Section: 05 | |
County/Municipality: Clearwater County | |
Well Name: TEXCAN HORBURG 12-5-42-13 | |
Operator Name: Imperial Oil Resources Limited | |
License Number: 0022588 | |
License Date: 1962-06-13 | |
License Status: RecCertified | |
Spud Date: 1962-08-17 | |
Final Drill Date: 1962-12-06 | |
Well Total Depth: 3962.40 m | |
Surface Hole Latitude: 52.590250 | |
Surface Hole Longitude: -115.845081 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1962-06-13 | Obtained License |
1962-10-19 | Drill Stem Test Performed |
1962-11-02 | Drill Stem Test Performed |
1962-11-15 | Drill Stem Test Performed |
1962-11-23 | Drill Stem Test Performed |
1962-12-06 | Finished Drilling |
1962-12-12 | Production Casing Operation Performed |
1962-12-15 | Perforation Treatment Performed - Bullet Perforation |
1962-12-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1962-12-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1962-12-17 | Perforation Treatment Performed - Jet Perforation |
1962-12-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1962-12-19 | Perforation Treatment Performed - Cement Squeeze |
1962-12-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1962-12-20 | Perforation Treatment Performed - Cement Squeeze |
1963-01-16 | Well Mode changed to Drilled and Cased |
1984-10-09 | Well Abandoned |
1984-10-09 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1962-12-15 | Bullet Perforation | 3646.90 | 3650.00 | 7 |
1962-12-15 | Bullet Perforation | 3755.10 | 3763.40 | 7 |
1962-12-16 | Acid Treatment | 3755.10 | 3763.40 | 0 |
1962-12-17 | Perforation | 3697.80 | 3700.30 | 7 |
1962-12-17 | Packing Device Capped w/Cement | 3733.80 | 3733.80 | 0 |
1962-12-18 | Acid Treatment | 3697.80 | 3700.30 | 0 |
1962-12-19 | Cement Squeeze | 3697.80 | 3700.30 | 0 |
1962-12-20 | Acid Treatment | 3646.90 | 3650.00 | 0 |
1962-12-20 | Cement Squeeze | 3646.90 | 3650.00 | 0 |
For data sources see[4]