If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0434010713002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.689236,"lon":-110.147053,"icon":""}]} |
Location: 00/13-07-043-01W4/2 | |
Location Alias: 00/13-07-43-01 W4M | |
Location Alias 2: 00/13-07-043-01 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 043 | |
Meridian: 4 | |
Range: 01 | |
Section: 07 | |
County/Municipality: Chauvin | |
Well Name: TALISMAN HZ13C CHAUVS 13-7-43-1 | |
Operator Name: Repsol Oil & Gas Canada Inc. | |
License Number: 0205508 | |
License Date: 1997-08-28 | |
License Status: Amended | |
Spud Date: 1997-09-27 | |
Final Drill Date: 1997-10-08 | |
Well Total Depth: 1458.00 m | |
Surface Hole Latitude: 52.689236 | |
Surface Hole Longitude: -110.147053 |
Date | Event |
---|---|
1997-08-28 | Obtained License |
1997-09-28 | Surface Casing Operation Performed |
1997-09-30 | Direction Drilling Operation Performed - Horizontal |
1997-10-02 | Production Casing Operation Performed |
1997-10-07 | Direction Drilling Operation Performed - Horizontal |
1997-10-08 | Finished Drilling |
1997-10-08 | Perforation Treatment Performed - Open-Hole Completion |
1997-10-08 | Well Mode changed to Drilled and Cased |
1997-10-09 | Rig Released |
1997-10-10 | Well Began Production |
1997-10-10 | Well Fluid changed to Crude Oil |
1997-10-10 | Well Mode changed to Pumping |
1997-10-15 | Well Log Performed |
1997-11-03 | Perforation Treatment Performed - Cement Plug |
1997-11-03 | Plug Back Performed |
1997-11-03 | Well Fluid changed to Crude Oil |
1997-11-03 | Well Mode changed to Abandoned and Whipstocked |
1997-11-05 | Well Log Performed |
1997-12-01 | Well Log Performed |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1997-09-30 | 505.00 | Horizontal |
1997-10-07 | 1223.10 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1997-10-08 | Open Hole/Barefoot Completion | 769.50 | 1458.00 | 0 |
1997-11-03 | Cement Plug | 762.00 | 1458.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1997 | 24 | 0.0 | 0.0 | 0.0 |
For data sources see[6]