X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0434093111002

Well Details

Well ID: 0434093111002
Loading map...
Location: 00/11-31-043-09W4/2
Location Alias: 00/11-31-43-09 W4M
Location Alias 2: 00/11-31-043-09 W4/02
Country: Canada
Province: Alberta
Township: 043
Meridian: 4
Range: 09
Section: 31
County/Municipality: Flagstaff County
Well Name: RANGER ET AL KILLAM 11-31-43-9
Operator Name: Canadian Natural Resources Limited
License Number: 0062982
License Date: 1977-02-28
License Status: Issued
Spud Date: 1977-02-28
Final Drill Date: 1977-03-02
Well Total Depth: 797.40 m
Surface Hole Latitude: 52.751530
Surface Hole Longitude: -111.302439

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-02-28 Obtained License
1977-03-02 Drill Stem Test Performed
1977-03-02 Finished Drilling
1977-03-02 Well Mode changed to Drilled and Cased
1977-03-03 Drill Stem Test Performed
1977-03-04 Production Casing Operation Performed
1977-06-04 Perforation Treatment Performed - Jet Perforation
1986-01-06 Perforation Treatment Performed - Jet Perforation
1986-01-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1986-01-07 Plug Back Performed
1986-01-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1986-01-08 Perforation Treatment Performed - Jet Perforation
1986-01-08 Plug Back Performed
1986-01-09 Perforation Treatment Performed - Jet Perforation
1986-01-10 Well Began Production
1986-01-10 Well Fluid changed to Gas
1986-01-10 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-06-04 Perforation 698.00 699.80 13
1986-01-06 Perforation 776.00 777.20 13
1986-01-07 Packing Device Capped w/Cement 766.00 774.00 0
1986-01-08 Perforation 727.80 729.70 13
1986-01-08 Packing Device Capped w/Cement 717.00 725.00 0
1986-01-08 Packing Device Capped w/Cement 688.00 696.00 0
1986-01-09 Perforation 657.40 658.30 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 3757 0.0 0.0 0.0
1987 5149 0.0 0.0 0.0
1988 8142 0.0 0.0 0.0
1989 5332 0.0 0.0 0.0
1990 4040 0.0 0.0 0.0
1991 4704 0.0 0.0 0.0
1992 4837 0.0 0.0 0.0
1993 6535 0.0 0.0 0.0
1994 7478 0.0 0.0 0.0
1995 8461 0.0 0.0 0.0
1996 8364 0.0 0.0 0.0
1997 8640 0.0 0.0 0.0
1998 8383 0.0 0.0 0.0
1999 8632 0.0 0.0 0.0
2000 8341 0.0 0.0 0.0
2001 8366 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 8759 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8758 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8748 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8688 0.0 0.0 0.0
2016 8672 0.0 0.0 0.0
2017 8534 0.0 0.0 0.0
2018 7656 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References