X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0434103106002

Well Details

Well ID: 0434103106002
Loading map...
Location: 00/06-31-043-10W4/2
Location Alias: 00/06-31-43-10 W4M
Location Alias 2: 00/06-31-043-10 W4/02
Country: Canada
Province: Alberta
Township: 043
Meridian: 4
Range: 10
Section: 31
County/Municipality: Flagstaff County
Well Name: 400259 ET AL KILLAM 6-31-43-10
Operator Name: Killiam Resources Ltd.
License Number: 0059020
License Date: 1976-07-06
License Status: RecCertified
Spud Date: 1976-07-23
Final Drill Date: 1976-07-25
Well Total Depth: 828.10 m
Surface Hole Latitude: 52.745700
Surface Hole Longitude: -111.446529

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-07-06 Obtained License
1976-07-25 Finished Drilling
1976-07-25 Well Mode changed to Drilled and Cased
1976-07-26 Production Casing Operation Performed
1976-08-14 Perforation Treatment Performed - Jet Perforation
1976-08-21 Perforation Treatment Performed - Jet Perforation
1977-11-15 Well Began Production
1977-11-15 Well Fluid changed to Gas
1977-11-15 Well Mode changed to Flowing
1988-01-31 Well Fluid changed to Gas
1988-01-31 Well Mode changed to Suspended
1989-11-08 Well Fluid changed to Gas
1989-11-08 Well Mode changed to Flowing
1992-07-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-07-07 Plug Back Performed
1992-07-07 Well Fluid changed to Gas
1992-07-07 Well Log Performed
1992-07-07 Well Mode changed to Abandoned
1992-07-13 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-08-14 Perforation 786.10 787.30 13
1976-08-21 Perforation 654.10 655.30 7
1976-08-21 Perforation 658.70 661.10 7
1976-08-21 Perforation 664.50 665.10 7
1992-07-07 Packing Device Capped w/Cement 766.30 774.30 0
1992-07-07 Packing Device Capped w/Cement 637.00 645.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 556 0.0 0.0 0.0
1978 5458 0.0 0.0 0.0
1979 2723 0.0 0.0 0.0
1980 4824 0.0 0.0 0.0
1981 7113 0.0 0.0 0.0
1982 8283 0.0 0.0 0.0
1983 5676 0.0 0.0 0.0
1984 4752 0.0 0.0 0.0
1985 6345 0.0 0.0 0.0
1986 2128 0.0 0.0 0.0
1989 1170 0.0 0.0 0.0
1990 8199 0.0 0.0 0.0
1991 4764 0.0 0.0 0.0
1992 4005 0.0 0.0 0.0

For data sources see[5]

References