X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0434161109B00

Well Details

Well ID: 0434161109B00
Loading map...
Location: B0/09-11-043-16W4/0
Location Alias: B0/09-11-43-16 W4M
Location Alias 2: B0/09-11-043-16 W4/00
Country: Canada
Province: Alberta
Township: 043
Meridian: 4
Range: 16
Section: 11
County/Municipality: Flagstaff County
Well Name: CLEO ENERGY FORESTB 9-11-43-16
Operator Name: Cleo Energy Corp.
License Number: 0177772
License Date: 1995-05-09
License Status: Abandoned
Spud Date: 1995-06-14
Final Drill Date: 1995-06-17
Well Total Depth: 1104.00 m
Surface Hole Latitude: 52.690336
Surface Hole Longitude: -112.208519

For data sources see[1][2]

Well History

Date Event
1995-05-09 Obtained License
1995-06-15 Surface Casing Operation Performed
1995-06-17 Drill Stem Test Performed
1995-06-17 Finished Drilling
1995-06-17 Well Log Performed
1995-06-17 Well Mode changed to Drilled and Cased
1995-06-18 Production Casing Operation Performed
1995-06-18 Rig Released
1995-06-26 Perforation Treatment Performed - Jet Perforation
1995-06-28 Well Began Production
1995-06-28 Well Fluid changed to Crude Oil
1995-06-28 Well Mode changed to Pumping
1997-12-08 Well Fluid changed to Crude Oil
1997-12-08 Well Mode changed to Suspended
2008-10-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-10-26 Plug Back Performed
2008-10-26 Well Fluid changed to Crude Oil
2008-10-26 Well Log Performed
2008-10-26 Well Mode changed to Abandoned Zone
2008-10-27 Perforation Treatment Performed - Jet Perforation
2008-10-27 Well Log Performed
2008-11-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-11-01 Plug Back Performed
2011-12-09 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-06-26 Perforation 1040.50 1042.50 13
2008-10-26 Packing Device Capped w/Cement 1017.00 1027.00 0
2008-10-27 Perforation 916.00 917.00 17
2008-11-01 Packing Device Capped w/Cement 896.00 906.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 4445 0.0 0.0 0.0
1996 8335 0.0 0.0 0.0
1997 7164 0.0 0.0 0.0

For data sources see[5]

References