X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0434161115A02

Well Details

Well ID: 0434161115A02
Loading map...
Location: A0/15-11-043-16W4/2
Location Alias: A0/15-11-43-16 W4M
Location Alias 2: A0/15-11-043-16 W4/02
Country: Canada
Province: Alberta
Township: 043
Meridian: 4
Range: 16
Section: 11
County/Municipality: Flagstaff County
Well Name: CLEO ENERGY FORESTB 15-11-43-16
Operator Name: Cleo Energy Corp.
License Number: 0141471
License Date: 1989-10-24
License Status: Abandoned
Spud Date: 1989-11-04
Final Drill Date: 1989-11-08
Well Total Depth: 1129.00 m
Surface Hole Latitude: 52.692344
Surface Hole Longitude: -112.213306

For data sources see[1][2]

Well History

Date Event
1989-10-24 Obtained License
1989-11-05 Surface Casing Operation Performed
1989-11-06 Direction Drilling Operation Performed - Deviate
1989-11-08 Finished Drilling
1989-11-08 Well Mode changed to Drilled and Cased
1989-11-09 Well Log Performed
1989-11-10 Production Casing Operation Performed
1989-11-10 Rig Released
1989-11-10 Well Log Performed
1989-11-16 Perforation Treatment Performed - Jet Perforation
1994-09-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-09-22 Perforation Treatment Performed - Jet Perforation
1994-09-22 Plug Back Performed
1995-01-27 Well Began Production
1995-01-27 Well Fluid changed to Gas
1995-01-27 Well Mode changed to Flowing
1995-12-22 Well Fluid changed to Gas
1995-12-22 Well Mode changed to Flowing
1996-09-30 Well Fluid changed to Gas
1996-09-30 Well Mode changed to Suspended
1998-01-28 Well Fluid changed to Gas
1998-01-28 Well Mode changed to Flowing
1998-08-01 Well Fluid changed to Gas
1998-08-01 Well Mode changed to Suspended
1998-09-01 Well Fluid changed to Gas
1998-09-01 Well Mode changed to Flowing
1998-11-01 Well Fluid changed to Gas
1998-11-01 Well Mode changed to Suspended
2001-02-12 Well Fluid changed to Gas
2001-02-12 Well Mode changed to Flowing
2009-06-24 Well Fluid changed to Gas
2009-06-24 Well Mode changed to Suspended
2011-08-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-08-04 Plug Back Performed
2011-08-04 Well Fluid changed to Gas
2011-08-04 Well Mode changed to Abandoned Zone
2011-08-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-08-05 Plug Back Performed
2011-08-27 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1989-11-06 457.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-11-16 Perforation 1061.00 1062.50 13
1994-09-22 Packing Device Capped w/Cement 1052.00 1060.00 0
1994-09-22 Perforation 1044.50 1046.00 13
1994-09-22 Perforation 929.00 930.50 13
2011-08-04 Packing Device Capped w/Cement 1033.00 1041.00 0
2011-08-05 Packing Device Capped w/Cement 917.00 925.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 6068 0.0 0.0 0.0
1998 843 0.0 0.0 0.0
2001 1011 0.0 0.0 0.0

For data sources see[6]

References