X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0434231215000

Well Details

Well ID: 0434231215000
Loading map...
Location: 00/15-12-043-23W4/0
Location Alias: 00/15-12-43-23 W4M
Location Alias 2: 00/15-12-043-23 W4/00
Country: Canada
Province: Alberta
Township: 043
Meridian: 4
Range: 23
Section: 12
County/Municipality: Ponoka County
Well Name: EMBER MALMO 15-12-43-23
Operator Name: Ember Resources Inc.
License Number: 0336892
License Date: 2005-08-23
License Status: Issued
Spud Date: 2006-01-06
Final Drill Date: 2006-01-07
Well Total Depth: 414.00 m
Surface Hole Latitude: 52.694590
Surface Hole Longitude: -113.208109

For data sources see[1][2]

Well History

Date Event
2005-08-23 Obtained License
2006-01-07 Finished Drilling
2006-01-07 Production Casing Operation Performed
2006-01-07 Rig Released
2006-01-07 Surface Casing Operation Performed
2006-01-07 Well Mode changed to Drilled and Cased
2006-01-29 Well Log Performed
2006-02-11 Perforation Treatment Performed - Jet Perforation
2006-02-11 Well Log Performed
2006-02-24 Perforation Treatment Performed - Fractured
2006-04-21 Well Began Production
2006-04-21 Well Fluid changed to Gas
2006-04-21 Well Mode changed to Flowing
2007-03-01 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-02-11 Perforation 388.00 390.00 13
2006-02-11 Perforation 280.50 281.50 13
2006-02-11 Perforation 278.00 279.00 13
2006-02-11 Perforation 267.50 268.50 13
2006-02-11 Perforation 262.00 264.50 13
2006-02-11 Perforation 255.50 257.50 13
2006-02-11 Perforation 250.00 251.00 13
2006-02-11 Perforation 243.00 244.00 13
2006-02-11 Perforation 237.00 238.00 13
2006-02-24 Fracture 388.00 390.00 0
2006-02-24 Fracture 349.00 352.00 0
2006-02-11 Perforation 349.00 352.00 13
2006-02-24 Fracture 344.50 345.50 0
2006-02-24 Fracture 340.00 341.00 0
2006-02-24 Fracture 334.40 335.50 0
2006-02-24 Fracture 324.00 325.50 0
2006-02-24 Fracture 313.00 314.00 0
2006-02-24 Fracture 303.00 305.00 0
2006-02-24 Fracture 296.00 299.00 0
2006-02-24 Fracture 280.50 281.50 0
2006-02-24 Fracture 278.00 279.00 0
2006-02-24 Fracture 267.50 268.50 0
2006-02-11 Perforation 344.50 345.50 13
2006-02-24 Fracture 262.00 264.50 0
2006-02-24 Fracture 255.50 257.50 0
2006-02-24 Fracture 250.00 251.00 0
2006-02-24 Fracture 243.00 244.00 0
2006-02-24 Fracture 237.00 238.00 0
2006-02-11 Perforation 340.00 341.00 13
2006-02-11 Perforation 334.40 335.50 13
2006-02-11 Perforation 324.00 325.50 13
2006-02-11 Perforation 313.00 314.00 13
2006-02-11 Perforation 303.00 305.00 13
2006-02-11 Perforation 296.00 299.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 5923 0.0 0.0 0.0
2007 8101 0.0 0.0 0.0
2008 8605 0.0 0.0 0.0
2009 8599 0.0 0.0 0.0
2010 8700 0.0 0.0 0.0
2011 8757 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8039 0.0 0.0 0.0
2017 7545 0.0 0.0 0.0
2018 7944 0.0 0.0 0.0
2019 7821 0.0 0.0 0.0
2020 1954 0.0 0.0 0.0

For data sources see[5]

References