X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0434231416000

Well Details

Well ID: 0434231416000
Loading map...
Location: 00/16-14-043-23W4/0
Location Alias: 00/16-14-43-23 W4M
Location Alias 2: 00/16-14-043-23 W4/00
Country: Canada
Province: Alberta
Township: 043
Meridian: 4
Range: 23
Section: 14
County/Municipality: Ponoka County
Well Name: EMBER MALMO 16-14-43-23
Operator Name: Ember Resources Inc.
License Number: 0394796
License Date: 2008-02-27
License Status: Issued
Spud Date: 2008-03-07
Final Drill Date: 2008-03-07
Well Total Depth: 475.00 m
Surface Hole Latitude: 52.710580
Surface Hole Longitude: -113.224272

For data sources see[1][2]

Well History

Date Event
2008-02-27 Obtained License
2008-03-07 Finished Drilling
2008-03-07 Production Casing Operation Performed
2008-03-07 Rig Released
2008-03-07 Surface Casing Operation Performed
2008-03-07 Well Mode changed to Drilled and Cased
2008-03-13 Well Log Performed
2008-04-15 Perforation Treatment Performed - Jet Perforation
2008-07-26 Perforation Treatment Performed - Fractured
2008-11-18 Well Began Production
2008-11-18 Well Fluid changed to Coalbed Methane-Coals Only
2008-11-18 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-04-15 Perforation 350.50 351.50 13
2008-04-15 Perforation 280.50 281.50 13
2008-04-15 Perforation 259.50 261.50 13
2008-04-15 Perforation 252.00 253.00 13
2008-04-15 Perforation 248.50 249.50 13
2008-04-15 Perforation 240.00 241.50 13
2008-07-26 Fracture 350.50 351.50 0
2008-07-26 Fracture 346.00 347.00 0
2008-07-26 Fracture 340.50 341.50 0
2008-07-26 Fracture 336.50 337.50 0
2008-07-26 Fracture 317.50 318.50 0
2008-04-15 Perforation 346.00 347.00 13
2008-07-26 Fracture 316.50 317.00 0
2008-07-26 Fracture 305.00 306.00 0
2008-07-26 Fracture 300.50 301.50 0
2008-07-26 Fracture 292.50 294.50 0
2008-07-26 Fracture 280.50 281.50 0
2008-07-26 Fracture 259.50 261.50 0
2008-07-26 Fracture 252.00 253.00 0
2008-07-26 Fracture 248.50 249.50 0
2008-07-26 Fracture 240.00 241.50 0
2008-04-15 Perforation 340.50 341.50 13
2008-04-15 Perforation 336.50 337.50 13
2008-04-15 Perforation 317.50 318.50 13
2008-04-15 Perforation 316.50 317.00 13
2008-04-15 Perforation 305.00 306.00 13
2008-04-15 Perforation 300.50 301.50 13
2008-04-15 Perforation 292.50 294.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 1464 0.0 0.0 0.0
2009 8476 0.0 0.0 0.0
2010 8353 0.0 0.0 0.0
2011 8540 0.0 0.0 0.0
2012 8210 0.0 0.0 0.0
2013 8745 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8754 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8739 0.0 0.0 0.0
2018 8519 0.0 0.0 0.0
2019 4343 0.0 0.0 0.0
2020 2175 0.0 0.0 0.0

For data sources see[5]

References