If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0434231705000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.703308,"lon":-113.312451,"icon":""}]} |
Location: 00/05-17-043-23W4/0 | |
Location Alias: 00/05-17-43-23 W4M | |
Location Alias 2: 00/05-17-043-23 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 043 | |
Meridian: 4 | |
Range: 23 | |
Section: 17 | |
County/Municipality: Ponoka County | |
Well Name: EMBER WOODRIV 5-17-43-23 | |
Operator Name: Ember Resources Inc. | |
License Number: 0243393 | |
License Date: 2000-10-21 | |
License Status: Abandoned | |
Spud Date: 2000-10-27 | |
Final Drill Date: 2000-11-02 | |
Well Total Depth: 1498.00 m | |
Surface Hole Latitude: 52.703308 | |
Surface Hole Longitude: -113.312451 |
Date | Event |
---|---|
2000-10-21 | Obtained License |
2000-10-28 | Surface Casing Operation Performed |
2000-11-02 | Finished Drilling |
2000-11-02 | Well Log Performed |
2000-11-03 | Production Casing Operation Performed |
2000-11-03 | Rig Released |
2000-11-03 | Well Mode changed to Drilled and Cased |
2000-11-18 | Well Log Performed |
2000-11-22 | Perforation Treatment Performed - Jet Perforation |
2000-11-22 | Well Log Performed |
2000-11-28 | Perforation Treatment Performed - Jet Perforation |
2000-11-28 | Well Log Performed |
2000-12-04 | Well Began Production |
2000-12-04 | Well Fluid changed to Crude Oil |
2000-12-04 | Well Mode changed to Pumping |
2001-04-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2001-04-26 | Perforation Treatment Performed - Jet Perforation |
2001-04-26 | Plug Back Performed |
2001-04-26 | Well Fluid changed to Crude Oil |
2001-04-26 | Well Mode changed to Abandoned Zone |
2001-04-28 | Perforation Treatment Performed - Jet Perforation |
2001-04-28 | Well Log Performed |
2001-05-04 | Well Log Performed |
2011-12-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-12-06 | Plug Back Performed |
2011-12-06 | Well Log Performed |
2011-12-10 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2000-11-22 | Perforation | 1454.00 | 1457.00 | 17 |
2000-11-28 | Perforation | 1449.50 | 1450.50 | 17 |
2001-04-26 | Packing Device Capped w/Cement | 1436.00 | 1446.00 | 0 |
2001-04-26 | Perforation | 584.50 | 589.00 | 17 |
2001-04-26 | Perforation | 619.00 | 621.50 | 17 |
2001-04-28 | Perforation | 485.50 | 488.00 | 17 |
2001-04-28 | Perforation | 498.50 | 503.00 | 17 |
2001-04-28 | Perforation | 508.00 | 511.50 | 17 |
2011-12-06 | Packing Device Capped w/Cement | 472.00 | 480.30 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2000 | 206 | 0.0 | 0.0 | 0.0 |
2001 | 840 | 0.0 | 0.0 | 0.0 |
For data sources see[5]