X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0434282207003

Well Details

Well ID: 0434282207003
Loading map...
Location: 00/07-22-043-28W4/3
Location Alias: 00/07-22-43-28 W4M
Location Alias 2: 00/07-22-043-28 W4/03
Country: Canada
Province: Alberta
Township: 043
Meridian: 4
Range: 28
Section: 22
County/Municipality: Ponoka County
Well Name: NAL FBANK 7-22-43-28
Operator Name: NAL Resources Limited
License Number: 0057304
License Date: 1976-02-27
License Status: Issued
Spud Date: 1976-03-13
Final Drill Date: 1976-03-21
Well Total Depth: 1728.20 m
Surface Hole Latitude: 52.717096
Surface Hole Longitude: -113.976912

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-02-27 Obtained License
1976-03-21 Finished Drilling
1976-03-21 Well Mode changed to Drilled and Cased
1976-03-22 Drill Stem Test Performed
1976-03-24 Production Casing Operation Performed
1976-06-11 Perforation Treatment Performed - Fractured
1976-06-11 Perforation Treatment Performed - Jet Perforation
1996-06-05 Well Log Performed
1996-06-12 Perforation Treatment Performed - Jet Perforation
1996-06-12 Perforation Treatment Performed - Remedial Casing
1996-06-12 Well Log Performed
1996-06-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-06-21 Plug Back Performed
1996-06-22 Perforation Treatment Performed - Jet Perforation
2003-01-23 Well Log Performed
2003-01-26 Perforation Treatment Performed - Jet Perforation
2003-01-28 Perforation Treatment Performed - Fractured
2003-02-01 Perforation Treatment Performed - Fractured
2005-08-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-08-28 Plug Back Performed
2005-08-29 Perforation Treatment Performed - Jet Perforation
2005-08-29 Well Log Performed
2005-08-30 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-06-11 Perforation 1709.30 1709.90 7
2003-02-01 Fracture 1688.50 1691.60 0
2005-08-28 Packing Device Capped w/Cement 1670.70 1679.20 0
2005-08-29 Perforation 1580.00 1584.00 17
2005-08-30 Fracture 1580.00 1584.00 0
1976-06-11 Perforation 1713.00 1716.00 7
1976-06-11 Fracture 1709.30 1716.00 0
1996-06-12 Perforation 713.70 714.00 79
1996-06-12 Remedial Casing Cementing 713.70 714.00 0
1996-06-21 Packing Device Capped w/Cement 1700.00 1708.00 0
1996-06-22 Perforation 1689.80 1691.60 13
2003-01-26 Perforation 1688.50 1691.50 17
2003-01-28 Fracture 1688.50 1691.60 0

For data sources see[4]



References