X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0435010711000

Well Details

Well ID: 0435010711000
Loading map...
Location: 00/11-07-043-01W5/0
Location Alias: 00/11-07-43-01 W5M
Location Alias 2: 00/11-07-043-01 W5/00
Country: Canada
Province: Alberta
Township: 043
Meridian: 5
Range: 01
Section: 07
County/Municipality: Ponoka County
Well Name: CVE HOMRIM 11-7-43-1
Operator Name: Cenovus Energy Inc.
License Number: 0013319
License Date: 1957-05-06
License Status: RecCertified
Spud Date: 1957-05-31
Final Drill Date: 1957-07-10
Well Total Depth: 2412.50 m
Surface Hole Latitude: 52.692414
Surface Hole Longitude: -114.137672

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1957-05-06 Obtained License
1957-07-10 Finished Drilling
1957-07-10 Well Mode changed to Drilled and Cased
1957-07-12 Production Casing Operation Performed
1957-07-13 Perforation Treatment Performed - Bullet Perforation
1957-07-18 Perforation Treatment Performed - Cement Squeeze
1957-07-20 Perforation Treatment Performed - Bullet Perforation
1957-07-22 Perforation Treatment Performed - Acid Wash - No Pressure
1957-07-24 Well Began Production
1957-07-24 Well Fluid changed to Crude Oil
1957-07-24 Well Mode changed to Flowing
1964-06-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1964-06-25 Perforation Treatment Performed - Jet Perforation
1965-12-06 Perforation Treatment Performed - Cement Squeeze
1965-12-10 Perforation Treatment Performed - Jet Perforation
1965-12-20 Perforation Treatment Performed - Jet Perforation
1968-05-30 Perforation Treatment Performed - Jet Perforation
1968-12-16 Perforation Treatment Performed - Cement Squeeze
1968-12-21 Perforation Treatment Performed - Jet Perforation
1968-12-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-05-24 Perforation Treatment Performed - Jet Perforation
1969-09-28 Perforation Treatment Performed - Cement Squeeze
1969-10-01 Perforation Treatment Performed - Jet Perforation
1969-10-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-11-22 Perforation Treatment Performed - Jet Perforation
1970-04-01 Well Fluid changed to Crude Oil
1970-04-01 Well Mode changed to Suspended
1970-06-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-09-22 Perforation Treatment Performed - Cement Plug
1979-09-22 Well Abandoned
1979-09-22 Well Fluid changed to Crude Oil
1979-09-22 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1957-07-13 Bullet Perforation 2395.40 2396.30 13
1965-12-20 Perforation 2385.70 2386.60 13
1968-05-30 Perforation 2385.10 2386.00 7
1968-12-16 Cement Squeeze 2382.60 2385.40 0
1968-12-21 Perforation 2380.50 2381.40 13
1968-12-23 Acid Treatment 2380.50 2381.40 0
1969-05-24 Perforation 2379.90 2380.50 13
1969-09-28 Cement Squeeze 2379.90 2381.40 0
1969-10-01 Perforation 2378.40 2379.30 13
1969-10-02 Acid Treatment 2378.40 2379.30 0
1969-11-22 Perforation 2375.00 2375.30 3
1957-07-18 Cement Squeeze 2395.40 2396.30 0
1970-06-24 Packing Device Capped w/Cement 2364.30 2373.50 0
1979-09-22 Cement Plug 2364.30 2364.30 0
1957-07-20 Bullet Perforation 2393.30 2393.90 20
1957-07-22 Acid Wash 2393.30 2393.90 0
1964-06-25 Packing Device Capped w/Cement 2392.10 2392.10 0
1964-06-25 Perforation 2389.60 2390.50 20
1965-12-06 Cement Squeeze 2344.80 2390.50 0
1965-12-10 Perforation 2386.60 2387.50 13
1965-12-20 Perforation 2384.50 2385.40 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 5502 0.0 0.0 0.0
1969 3381 0.0 0.0 0.0

For data sources see[5]

References