If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0435010711000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.692414,"lon":-114.137672,"icon":""}]} |
Location: 00/11-07-043-01W5/0 | |
Location Alias: 00/11-07-43-01 W5M | |
Location Alias 2: 00/11-07-043-01 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 043 | |
Meridian: 5 | |
Range: 01 | |
Section: 07 | |
County/Municipality: Ponoka County | |
Well Name: CVE HOMRIM 11-7-43-1 | |
Operator Name: Cenovus Energy Inc. | |
License Number: 0013319 | |
License Date: 1957-05-06 | |
License Status: RecCertified | |
Spud Date: 1957-05-31 | |
Final Drill Date: 1957-07-10 | |
Well Total Depth: 2412.50 m | |
Surface Hole Latitude: 52.692414 | |
Surface Hole Longitude: -114.137672 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1957-05-06 | Obtained License |
1957-07-10 | Finished Drilling |
1957-07-10 | Well Mode changed to Drilled and Cased |
1957-07-12 | Production Casing Operation Performed |
1957-07-13 | Perforation Treatment Performed - Bullet Perforation |
1957-07-18 | Perforation Treatment Performed - Cement Squeeze |
1957-07-20 | Perforation Treatment Performed - Bullet Perforation |
1957-07-22 | Perforation Treatment Performed - Acid Wash - No Pressure |
1957-07-24 | Well Began Production |
1957-07-24 | Well Fluid changed to Crude Oil |
1957-07-24 | Well Mode changed to Flowing |
1964-06-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1964-06-25 | Perforation Treatment Performed - Jet Perforation |
1965-12-06 | Perforation Treatment Performed - Cement Squeeze |
1965-12-10 | Perforation Treatment Performed - Jet Perforation |
1965-12-20 | Perforation Treatment Performed - Jet Perforation |
1968-05-30 | Perforation Treatment Performed - Jet Perforation |
1968-12-16 | Perforation Treatment Performed - Cement Squeeze |
1968-12-21 | Perforation Treatment Performed - Jet Perforation |
1968-12-23 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1969-05-24 | Perforation Treatment Performed - Jet Perforation |
1969-09-28 | Perforation Treatment Performed - Cement Squeeze |
1969-10-01 | Perforation Treatment Performed - Jet Perforation |
1969-10-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1969-11-22 | Perforation Treatment Performed - Jet Perforation |
1970-04-01 | Well Fluid changed to Crude Oil |
1970-04-01 | Well Mode changed to Suspended |
1970-06-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1979-09-22 | Perforation Treatment Performed - Cement Plug |
1979-09-22 | Well Abandoned |
1979-09-22 | Well Fluid changed to Crude Oil |
1979-09-22 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1957-07-13 | Bullet Perforation | 2395.40 | 2396.30 | 13 |
1965-12-20 | Perforation | 2385.70 | 2386.60 | 13 |
1968-05-30 | Perforation | 2385.10 | 2386.00 | 7 |
1968-12-16 | Cement Squeeze | 2382.60 | 2385.40 | 0 |
1968-12-21 | Perforation | 2380.50 | 2381.40 | 13 |
1968-12-23 | Acid Treatment | 2380.50 | 2381.40 | 0 |
1969-05-24 | Perforation | 2379.90 | 2380.50 | 13 |
1969-09-28 | Cement Squeeze | 2379.90 | 2381.40 | 0 |
1969-10-01 | Perforation | 2378.40 | 2379.30 | 13 |
1969-10-02 | Acid Treatment | 2378.40 | 2379.30 | 0 |
1969-11-22 | Perforation | 2375.00 | 2375.30 | 3 |
1957-07-18 | Cement Squeeze | 2395.40 | 2396.30 | 0 |
1970-06-24 | Packing Device Capped w/Cement | 2364.30 | 2373.50 | 0 |
1979-09-22 | Cement Plug | 2364.30 | 2364.30 | 0 |
1957-07-20 | Bullet Perforation | 2393.30 | 2393.90 | 20 |
1957-07-22 | Acid Wash | 2393.30 | 2393.90 | 0 |
1964-06-25 | Packing Device Capped w/Cement | 2392.10 | 2392.10 | 0 |
1964-06-25 | Perforation | 2389.60 | 2390.50 | 20 |
1965-12-06 | Cement Squeeze | 2344.80 | 2390.50 | 0 |
1965-12-10 | Perforation | 2386.60 | 2387.50 | 13 |
1965-12-20 | Perforation | 2384.50 | 2385.40 | 7 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 0 | 0.0 | 0.0 | 0.0 |
1968 | 5502 | 0.0 | 0.0 | 0.0 |
1969 | 3381 | 0.0 | 0.0 | 0.0 |
For data sources see[5]