X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0435011803002

Well Details

Well ID: 0435011803002
Loading map...
Location: 00/03-18-043-01W5/2
Location Alias: 00/03-18-43-01 W5M
Location Alias 2: 00/03-18-043-01 W5/02
Country: Canada
Province: Alberta
Township: 043
Meridian: 5
Range: 01
Section: 18
County/Municipality: Ponoka County
Well Name: CANETIC RES HOMRIM 3-18-43-1
Operator Name: NAL Resources Limited
License Number: 0014199
License Date: 1957-10-30
License Status: Suspension
Spud Date: 1957-11-02
Final Drill Date: 1957-12-14
Well Total Depth: 2427.70 m
Surface Hole Latitude: 52.701517
Surface Hole Longitude: -114.136166

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1957-10-30 Obtained License
1957-12-10 Liner Casing Operation Performed
1957-12-14 Drill Stem Test Performed
1957-12-14 Finished Drilling
1957-12-14 Perforation Treatment Performed - Open-Hole Completion
1959-04-01 Perforation Treatment Performed - Jet Perforation
1962-10-01 Perforation Treatment Performed - Cement Squeeze
1962-10-03 Perforation Treatment Performed - Jet Perforation
1965-02-26 Perforation Treatment Performed - Condensate Squeeze
1965-09-03 Perforation Treatment Performed - Jet Perforation
1966-12-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-08-01 Perforation Treatment Performed - Cement Squeeze
1967-08-02 Perforation Treatment Performed - Cement Squeeze
1967-08-10 Perforation Treatment Performed - Jet Perforation
1967-08-11 Perforation Treatment Performed - Acid Wash - No Pressure
1968-01-28 Perforation Treatment Performed - Cement Squeeze
1968-01-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-01-31 Perforation Treatment Performed - Jet Perforation
1969-12-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1986-03-06 Well Log Performed
1989-08-04 Well Log Performed
1989-11-15 Well Log Performed
1989-12-05 Well Log Performed
1990-03-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-03-29 Perforation Treatment Performed - Jet Perforation
1990-04-04 Perforation Treatment Performed - Jet Perforation
1990-04-11 Perforation Treatment Performed - Jet Perforation
1990-04-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-05-01 Perforation Treatment Performed - Cement Squeeze
1990-05-04 Perforation Treatment Performed - Jet Perforation
1990-05-04 Well Log Performed
1990-05-06 Well Log Performed
1990-05-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-05-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-05-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-05-17 Plug Back Performed
1994-05-17 Well Log Performed
1994-05-19 Well Log Performed
1994-05-20 Perforation Treatment Performed - Jet Perforation
1994-05-20 Well Mode changed to Drilled and Cased
1999-06-03 Well Began Production
1999-06-03 Well Fluid changed to Gas
1999-06-03 Well Mode changed to Flowing
2002-03-11 Well Log Performed
2002-03-13 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-03-13 Perforation Treatment Performed - Jet Perforation
2007-12-14 Well Fluid changed to Gas
2007-12-14 Well Mode changed to Suspended
2008-10-24 Well Fluid changed to Gas
2008-10-24 Well Mode changed to Flowing
2010-01-01 Well Fluid changed to Gas
2010-01-01 Well Mode changed to Pumping
2014-02-01 Well Fluid changed to Gas
2014-02-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1957-12-14 Open Hole/Barefoot Completion 2409.10 2411.30 0
1967-08-10 Perforation 2404.00 2405.20 13
1967-08-11 Acid Wash 2404.00 2405.20 0
1968-01-28 Cement Squeeze 2404.00 2405.20 0
1968-01-31 Perforation 2400.30 2401.50 13
1968-01-31 Acid Treatment 2400.30 2401.50 0
1969-12-16 Packing Device Capped w/Cement 2398.50 2398.80 0
1990-03-29 Perforation 2367.20 2368.50 13
1990-03-29 Perforation 2370.00 2371.50 13
1990-03-29 Perforation 2374.50 2376.50 13
1990-03-29 Acid Treatment 2367.20 2371.50 0
1959-04-01 Perforation 2409.40 2411.00 13
1990-04-04 Perforation 2333.50 2335.00 13
1990-04-04 Perforation 2337.00 2338.00 13
1990-04-04 Perforation 2339.00 2340.00 13
1990-04-11 Perforation 2324.50 2327.00 13
1990-04-13 Acid Treatment 2324.50 2327.00 0
1990-05-01 Cement Squeeze 2324.50 2327.00 0
1990-05-04 Perforation 2324.50 2325.20 13
1990-05-07 Acid Treatment 2324.50 2325.20 0
1990-05-09 Acid Treatment 2324.50 2325.20 0
1994-05-17 Packing Device Capped w/Cement 2307.00 2315.00 0
1962-10-01 Cement Squeeze 2409.40 2411.00 0
1994-05-20 Perforation 1804.50 1806.50 13
2002-03-13 Acid Treatment 1804.50 1806.50 0
2002-03-13 Perforation 1822.50 1827.00 17
2002-03-13 Perforation 1831.00 1840.00 17
1962-10-03 Perforation 2409.40 2410.40 0
1965-02-26 Condensate Squeeze 2409.40 2410.40 0
1965-09-03 Perforation 2407.90 2409.40 7
1966-12-17 Acid Treatment 2407.90 2410.40 0
1967-08-01 Cement Squeeze 2407.90 2410.40 0
1967-08-02 Cement Squeeze 2407.90 2410.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 4647 0.0 0.0 0.0
2000 5122 0.0 0.0 0.0
2001 127 0.0 0.0 0.0
2002 3085 0.0 0.0 0.0
2004 2893 0.0 0.0 0.0
2005 1990 0.0 0.0 0.0
2006 3938 0.0 0.0 0.0
2008 1603 0.0 0.0 0.0
2009 768 0.0 0.0 0.0
2010 7991 0.0 0.0 0.0
2011 8471 0.0 0.0 0.0
2012 4583 0.0 0.0 0.0
2013 744 0.0 0.0 0.0

For data sources see[5]

References