If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0435011803002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.701517,"lon":-114.136166,"icon":""}]} |
Location: 00/03-18-043-01W5/2 | |
Location Alias: 00/03-18-43-01 W5M | |
Location Alias 2: 00/03-18-043-01 W5/02 | |
Country: Canada | |
Province: Alberta | |
Township: 043 | |
Meridian: 5 | |
Range: 01 | |
Section: 18 | |
County/Municipality: Ponoka County | |
Well Name: CANETIC RES HOMRIM 3-18-43-1 | |
Operator Name: NAL Resources Limited | |
License Number: 0014199 | |
License Date: 1957-10-30 | |
License Status: Suspension | |
Spud Date: 1957-11-02 | |
Final Drill Date: 1957-12-14 | |
Well Total Depth: 2427.70 m | |
Surface Hole Latitude: 52.701517 | |
Surface Hole Longitude: -114.136166 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1957-10-30 | Obtained License |
1957-12-10 | Liner Casing Operation Performed |
1957-12-14 | Drill Stem Test Performed |
1957-12-14 | Finished Drilling |
1957-12-14 | Perforation Treatment Performed - Open-Hole Completion |
1959-04-01 | Perforation Treatment Performed - Jet Perforation |
1962-10-01 | Perforation Treatment Performed - Cement Squeeze |
1962-10-03 | Perforation Treatment Performed - Jet Perforation |
1965-02-26 | Perforation Treatment Performed - Condensate Squeeze |
1965-09-03 | Perforation Treatment Performed - Jet Perforation |
1966-12-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1967-08-01 | Perforation Treatment Performed - Cement Squeeze |
1967-08-02 | Perforation Treatment Performed - Cement Squeeze |
1967-08-10 | Perforation Treatment Performed - Jet Perforation |
1967-08-11 | Perforation Treatment Performed - Acid Wash - No Pressure |
1968-01-28 | Perforation Treatment Performed - Cement Squeeze |
1968-01-31 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1968-01-31 | Perforation Treatment Performed - Jet Perforation |
1969-12-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1986-03-06 | Well Log Performed |
1989-08-04 | Well Log Performed |
1989-11-15 | Well Log Performed |
1989-12-05 | Well Log Performed |
1990-03-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-03-29 | Perforation Treatment Performed - Jet Perforation |
1990-04-04 | Perforation Treatment Performed - Jet Perforation |
1990-04-11 | Perforation Treatment Performed - Jet Perforation |
1990-04-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-05-01 | Perforation Treatment Performed - Cement Squeeze |
1990-05-04 | Perforation Treatment Performed - Jet Perforation |
1990-05-04 | Well Log Performed |
1990-05-06 | Well Log Performed |
1990-05-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-05-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1994-05-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1994-05-17 | Plug Back Performed |
1994-05-17 | Well Log Performed |
1994-05-19 | Well Log Performed |
1994-05-20 | Perforation Treatment Performed - Jet Perforation |
1994-05-20 | Well Mode changed to Drilled and Cased |
1999-06-03 | Well Began Production |
1999-06-03 | Well Fluid changed to Gas |
1999-06-03 | Well Mode changed to Flowing |
2002-03-11 | Well Log Performed |
2002-03-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2002-03-13 | Perforation Treatment Performed - Jet Perforation |
2007-12-14 | Well Fluid changed to Gas |
2007-12-14 | Well Mode changed to Suspended |
2008-10-24 | Well Fluid changed to Gas |
2008-10-24 | Well Mode changed to Flowing |
2010-01-01 | Well Fluid changed to Gas |
2010-01-01 | Well Mode changed to Pumping |
2014-02-01 | Well Fluid changed to Gas |
2014-02-01 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1957-12-14 | Open Hole/Barefoot Completion | 2409.10 | 2411.30 | 0 |
1967-08-10 | Perforation | 2404.00 | 2405.20 | 13 |
1967-08-11 | Acid Wash | 2404.00 | 2405.20 | 0 |
1968-01-28 | Cement Squeeze | 2404.00 | 2405.20 | 0 |
1968-01-31 | Perforation | 2400.30 | 2401.50 | 13 |
1968-01-31 | Acid Treatment | 2400.30 | 2401.50 | 0 |
1969-12-16 | Packing Device Capped w/Cement | 2398.50 | 2398.80 | 0 |
1990-03-29 | Perforation | 2367.20 | 2368.50 | 13 |
1990-03-29 | Perforation | 2370.00 | 2371.50 | 13 |
1990-03-29 | Perforation | 2374.50 | 2376.50 | 13 |
1990-03-29 | Acid Treatment | 2367.20 | 2371.50 | 0 |
1959-04-01 | Perforation | 2409.40 | 2411.00 | 13 |
1990-04-04 | Perforation | 2333.50 | 2335.00 | 13 |
1990-04-04 | Perforation | 2337.00 | 2338.00 | 13 |
1990-04-04 | Perforation | 2339.00 | 2340.00 | 13 |
1990-04-11 | Perforation | 2324.50 | 2327.00 | 13 |
1990-04-13 | Acid Treatment | 2324.50 | 2327.00 | 0 |
1990-05-01 | Cement Squeeze | 2324.50 | 2327.00 | 0 |
1990-05-04 | Perforation | 2324.50 | 2325.20 | 13 |
1990-05-07 | Acid Treatment | 2324.50 | 2325.20 | 0 |
1990-05-09 | Acid Treatment | 2324.50 | 2325.20 | 0 |
1994-05-17 | Packing Device Capped w/Cement | 2307.00 | 2315.00 | 0 |
1962-10-01 | Cement Squeeze | 2409.40 | 2411.00 | 0 |
1994-05-20 | Perforation | 1804.50 | 1806.50 | 13 |
2002-03-13 | Acid Treatment | 1804.50 | 1806.50 | 0 |
2002-03-13 | Perforation | 1822.50 | 1827.00 | 17 |
2002-03-13 | Perforation | 1831.00 | 1840.00 | 17 |
1962-10-03 | Perforation | 2409.40 | 2410.40 | 0 |
1965-02-26 | Condensate Squeeze | 2409.40 | 2410.40 | 0 |
1965-09-03 | Perforation | 2407.90 | 2409.40 | 7 |
1966-12-17 | Acid Treatment | 2407.90 | 2410.40 | 0 |
1967-08-01 | Cement Squeeze | 2407.90 | 2410.40 | 0 |
1967-08-02 | Cement Squeeze | 2407.90 | 2410.40 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1999 | 4647 | 0.0 | 0.0 | 0.0 |
2000 | 5122 | 0.0 | 0.0 | 0.0 |
2001 | 127 | 0.0 | 0.0 | 0.0 |
2002 | 3085 | 0.0 | 0.0 | 0.0 |
2004 | 2893 | 0.0 | 0.0 | 0.0 |
2005 | 1990 | 0.0 | 0.0 | 0.0 |
2006 | 3938 | 0.0 | 0.0 | 0.0 |
2008 | 1603 | 0.0 | 0.0 | 0.0 |
2009 | 768 | 0.0 | 0.0 | 0.0 |
2010 | 7991 | 0.0 | 0.0 | 0.0 |
2011 | 8471 | 0.0 | 0.0 | 0.0 |
2012 | 4583 | 0.0 | 0.0 | 0.0 |
2013 | 744 | 0.0 | 0.0 | 0.0 |
For data sources see[5]