Well Details

Well ID: 0435011809000
Loading map...
Location: 00/09-18-043-01W5/0
Location Alias: 00/09-18-43-01 W5M
Location Alias 2: 00/09-18-043-01 W5/00
Country: Canada
Province: Alberta
Township: 043
Meridian: 5
Range: 01
Section: 18
County/Municipality: Ponoka County
Well Name: CVE PEMBINA 9-18-43-1
Operator Name: Cenovus Energy Inc.
License Number: 0019932
License Date: 1960-11-02
License Status: Issued
Spud Date: 1960-11-02
Final Drill Date: 1960-12-13
Well Total Depth: 2410.40 m
Surface Hole Latitude: 52.706343
Surface Hole Longitude: -114.127602

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-11-02 Obtained License
1960-12-04 Production Casing Operation Performed
1960-12-06 Lost Circulation Occurred
1960-12-12 Drill Stem Test Performed
1960-12-13 Drill Stem Test Performed
1960-12-13 Finished Drilling
1960-12-13 Perforation Treatment Performed - Open-Hole Completion
1960-12-13 Well Mode changed to Drilled and Cased
1960-12-14 Drill Stem Test Performed
1961-01-08 Well Began Production
1961-01-08 Well Fluid changed to Crude Oil
1961-01-08 Well Mode changed to Flowing
1962-08-09 Perforation Treatment Performed - Jet Perforation
1965-06-16 Perforation Treatment Performed - Cement Squeeze
1965-06-18 Perforation Treatment Performed - Abrasa-Jet Perforation
1965-06-18 Perforation Treatment Performed - Nitrogen Treatment
1965-09-03 Perforation Treatment Performed - Jet Perforation
1966-06-08 Well Fluid changed to Crude Oil
1966-06-08 Well Mode changed to Pumping
1967-10-03 Perforation Treatment Performed - Cement Squeeze
1967-10-06 Perforation Treatment Performed - Jet Perforation
1967-10-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-10-08 Well Fluid changed to Crude Oil
1967-10-08 Well Mode changed to Flowing
1968-03-28 Well Fluid changed to Crude Oil
1968-03-28 Well Mode changed to Pumping
1968-06-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1968-06-08 Perforation Treatment Performed - Jet Perforation
1968-09-18 Perforation Treatment Performed - Cement Squeeze
1968-09-20 Perforation Treatment Performed - Jet Perforation
1968-09-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-11-25 Well Fluid changed to Crude Oil
1970-11-25 Well Mode changed to Suspended
1973-05-30 Perforation Treatment Performed - Cement Plug
1973-05-30 Perforation Treatment Performed - Open-Hole Completion
1988-12-18 Well Log Performed
1989-06-09 Perforation Treatment Performed - Cement Plug
1989-06-11 Perforation Treatment Performed - Cement Plug
1989-06-21 Well Log Performed
1989-06-22 Perforation Treatment Performed - Open-Hole Completion
1989-06-26 Perforation Treatment Performed - Cement Squeeze
1989-07-03 Well Log Performed
1989-07-11 Perforation Treatment Performed - Jet Perforation
1989-07-11 Well Log Performed
1989-07-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-07-13 Well Fluid changed to Crude Oil
1989-07-13 Well Mode changed to Flowing
1989-08-09 Well Log Performed
1989-08-10 Well Fluid changed to Crude Oil
1989-08-10 Well Mode changed to Suspended
1989-11-20 Well Log Performed
1990-01-07 Well Log Performed
1990-01-08 Well Fluid changed to Crude Oil
1990-01-08 Well Mode changed to Flowing
1991-02-16 Well Log Performed
1991-12-08 Well Log Performed
1993-04-29 Well Fluid changed to Crude Oil
1993-04-29 Well Mode changed to Gas Lift
1999-04-27 Well Log Performed
2009-01-06 Well Fluid changed to Crude Oil
2009-01-06 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-12-13 Open Hole/Barefoot Completion 2296.70 2398.20 0
1968-06-05 Packing Device Capped w/Cement 2388.70 2388.70 0
1968-06-08 Perforation 2384.10 2385.10 7
1968-09-18 Cement Squeeze 2384.10 2385.10 0
1968-09-20 Perforation 2382.00 2383.50 7
1968-09-21 Acid Treatment 2382.00 2383.50 0
1973-05-30 Cement Plug 2370.70 2392.70 0
1973-05-30 Open Hole/Barefoot Completion 2296.70 2370.70 0
1989-06-09 Cement Plug 800.00 1156.00 0
1989-06-11 Cement Plug 720.00 1030.00 0
1989-06-22 Open Hole/Barefoot Completion 2296.70 2370.70 0
1962-08-09 Perforation 2395.70 2396.60 13
1989-06-26 Cement Squeeze 2296.70 2370.70 0
1989-07-11 Perforation 2297.60 2301.20 13
1989-07-13 Acid Treatment 2297.60 2301.20 0
1965-06-16 Cement Squeeze 2395.70 2396.60 0
1965-06-18 Hydra Jet Perforation 2393.30 2394.20 0
1965-06-18 Nitrogen Treatment 2393.30 2394.20 0
1965-09-03 Perforation 2392.10 2393.30 7
1967-10-03 Cement Squeeze 2392.10 2393.30 0
1967-10-06 Perforation 2387.50 2388.70 7
1967-10-07 Acid Treatment 2387.50 2388.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 3576 0.0 0.0 0.0
1969 8600 0.0 0.0 0.0
1970 6167 0.0 0.0 0.0
1989 481 0.0 0.0 0.0
1990 7344 0.0 0.0 0.0
1991 7024 0.0 0.0 0.0
1992 7773 0.0 0.0 0.0
1993 7405 0.0 0.0 0.0
1994 7893 0.0 0.0 0.0
1995 7804 0.0 0.0 0.0
1996 7107 0.0 0.0 0.0
1997 5525 0.0 0.0 0.0
1998 8241 0.0 0.0 0.0
1999 7681 0.0 0.0 0.0
2000 8361 0.0 0.0 0.0
2001 8534 0.0 0.0 0.0
2002 8503 0.0 0.0 0.0
2003 8139 0.0 0.0 0.0
2004 8685 0.0 0.0 0.0
2005 8557 0.0 0.0 0.0
2006 8592 0.0 0.0 0.0
2007 7610 0.0 0.0 0.0
2008 7951 0.0 0.0 0.0
2009 8084 0.0 0.0 0.0
2010 7824 0.0 0.0 0.0
2011 7312 0.0 0.0 0.0
2012 8191 0.0 0.0 0.0
2013 8388 0.0 0.0 0.0
2014 7793 0.0 0.0 0.0
2015 8349 0.0 0.0 0.0
2016 7475 0.0 0.0 0.0
2017 8446 0.0 0.0 0.0
2018 8735 0.0 0.0 0.0
2019 8226 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1960-12-06 Lost Circulation 2333.20 2333.20

For data sources see[6]