X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0435011913000

Well Details

Well ID: 0435011913000
Loading map...
Location: 00/13-19-043-01W5/0
Location Alias: 00/13-19-43-01 W5M
Location Alias 2: 00/13-19-043-01 W5/00
Country: Canada
Province: Alberta
Township: 043
Meridian: 5
Range: 01
Section: 19
County/Municipality: Ponoka County
Well Name: CVE PEMBINA 13-19-43-1
Operator Name: Cenovus Energy Inc.
License Number: 0133986
License Date: 1988-05-20
License Status: Issued
Spud Date: 1988-05-26
Final Drill Date: 1988-06-08
Well Total Depth: 1855.00 m
Surface Hole Latitude: 52.722890
Surface Hole Longitude: -114.141190

For data sources see[1][2]

Well History

Date Event
1988-05-20 Obtained License
1988-05-28 Direction Drilling Operation Performed - Deviate
1988-05-28 Surface Casing Operation Performed
1988-06-08 Finished Drilling
1988-06-08 Well Log Performed
1988-06-09 Well Log Performed
1988-06-11 Production Casing Operation Performed
1988-06-11 Rig Released
1988-10-15 Well Log Performed
1988-10-17 Well Log Performed
1988-10-18 Perforation Treatment Performed - Jet Perforation
1988-10-18 Well Log Performed
1988-10-19 Perforation Treatment Performed - Jet Perforation
1988-10-19 Well Log Performed
1988-10-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-10-21 Well Log Performed
1988-10-22 Perforation Treatment Performed - Jet Perforation
1988-10-23 Perforation Treatment Performed - Fractured
1988-10-23 Well Mode changed to Drilled and Cased
1988-10-29 Well Log Performed
1989-06-09 Well Log Performed
1994-05-26 Well Began Production
1994-05-26 Well Fluid changed to Gas
1994-05-26 Well Mode changed to Flowing
2007-05-01 Well Fluid changed to Gas
2007-05-01 Well Mode changed to Pumping
2007-07-12 Perforation Treatment Performed - Jet Perforation
2007-07-12 Well Log Performed
2007-07-13 Perforation Treatment Performed - Fractured

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1988-05-28 323.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-10-18 Perforation 1803.50 1807.00 13
1988-10-19 Perforation 1803.50 1807.00 13
1988-10-20 Packing Device Capped w/Cement 1790.00 1800.00 0
1988-10-22 Perforation 1770.00 1776.00 13
1988-10-22 Perforation 1778.00 1782.00 13
1988-10-23 Fracture 1770.00 1782.00 0
2007-07-12 Perforation 1803.50 1807.00 17
2007-07-13 Fracture 1803.50 1807.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 3997 0.0 0.0 0.0
1995 3262 0.0 0.0 0.0
1996 5350 0.0 0.0 0.0
1997 4340 0.0 0.0 0.0
1998 6896 0.0 0.0 0.0
1999 6008 0.0 0.0 0.0
2000 7101 0.0 0.0 0.0
2001 8011 0.0 0.0 0.0
2002 8557 0.0 0.0 0.0
2003 8327 0.0 0.0 0.0
2004 8711 0.0 0.0 0.0
2005 7626 0.0 0.0 0.0
2006 5184 0.0 0.0 0.0
2007 7247 0.0 0.0 0.0
2008 8735 0.0 0.0 0.0
2009 8711 0.0 0.0 0.0
2010 8735 0.0 0.0 0.0
2011 4334 0.0 0.0 0.0
2012 7745 0.0 0.0 0.0
2013 7907 0.0 0.0 0.0
2014 7615 0.0 0.0 0.0
2015 7519 0.0 0.0 0.0
2016 8509 0.0 0.0 0.0
2017 8157 0.0 0.0 0.0
2018 8661 0.0 0.0 0.0
2019 6379 0.0 0.0 0.0
2020 1904 0.0 0.0 0.0

For data sources see[6]

References