If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0435041713030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.697472,"lon":-114.554809,"icon":""}]} |
Location: 03/13-17-043-04W5/0 | |
Location Alias: 03/13-17-43-04 W5M | |
Location Alias 2: 03/13-17-043-04 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 043 | |
Meridian: 5 | |
Range: 04 | |
Section: 17 | |
County/Municipality: Ponoka County | |
Well Name: TQN HZ PEMBINA 13-17-43-4 | |
Operator Name: TAQA North Ltd. | |
License Number: 0490298 | |
License Date: 2018-08-03 | |
License Status: Issued | |
Spud Date: 2018-09-08 | |
Final Drill Date: 2018-09-13 | |
Well Total Depth: 2835.00 m | |
Surface Hole Latitude: 52.697472 | |
Surface Hole Longitude: -114.554809 |
Date | Event |
---|---|
2018-08-03 | Obtained License |
2018-09-08 | Surface Casing Operation Performed |
2018-09-10 | Direction Drilling Operation Performed - Deviate |
2018-09-10 | Well Log Performed |
2018-09-11 | Direction Drilling Operation Performed - Horizontal |
2018-09-13 | Finished Drilling |
2018-09-13 | Perforation Treatment Performed - Open-Hole Completion |
2018-09-13 | Rig Released |
2018-09-13 | Well Log Performed |
2018-09-13 | Well Mode changed to Drilled and Cased |
2018-09-14 | Production Casing Operation Performed |
2018-09-14 | Well Log Performed |
2018-10-10 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-10-11 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-11-22 | Well Began Production |
2018-11-22 | Well Fluid changed to Crude Oil |
2018-11-22 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2018-09-08 | Nabors Drilling Limited | 11 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2018-09-10 | 612.90 | Deviate (5 - 79 degrees) |
2018-09-11 | 1409.90 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2018-09-13 | Open Hole/Barefoot Completion | 2826.00 | 2835.00 | 0 |
2018-10-11 | Multi-Stage Fracture | 2275.60 | 2277.50 | 0 |
2018-10-11 | Multi-Stage Fracture | 2201.70 | 2203.60 | 0 |
2018-10-11 | Multi-Stage Fracture | 2141.70 | 2143.60 | 0 |
2018-10-11 | Multi-Stage Fracture | 2081.70 | 2083.60 | 0 |
2018-10-11 | Multi-Stage Fracture | 2021.70 | 2023.60 | 0 |
2018-10-11 | Multi-Stage Fracture | 1947.90 | 1949.80 | 0 |
2018-10-11 | Multi-Stage Fracture | 1887.90 | 1889.80 | 0 |
2018-10-11 | Multi-Stage Fracture | 1827.90 | 1829.80 | 0 |
2018-10-11 | Multi-Stage Fracture | 1767.90 | 1769.80 | 0 |
2018-10-11 | Multi-Stage Fracture | 1694.10 | 1696.10 | 0 |
2018-10-10 | Multi-Stage Fracture | 2782.60 | 2783.40 | 0 |
2018-10-11 | Multi-Stage Fracture | 1634.10 | 1636.00 | 0 |
2018-10-11 | Multi-Stage Fracture | 1574.10 | 1576.00 | 0 |
2018-10-11 | Multi-Stage Fracture | 1514.10 | 1516.00 | 0 |
2018-10-11 | Multi-Stage Fracture | 1454.00 | 1455.90 | 0 |
2018-10-11 | Multi-Stage Fracture | 2709.40 | 2711.30 | 0 |
2018-10-11 | Multi-Stage Fracture | 2649.30 | 2651.20 | 0 |
2018-10-11 | Multi-Stage Fracture | 2589.40 | 2591.30 | 0 |
2018-10-11 | Multi-Stage Fracture | 2529.40 | 2531.30 | 0 |
2018-10-11 | Multi-Stage Fracture | 2455.60 | 2457.50 | 0 |
2018-10-11 | Multi-Stage Fracture | 2395.60 | 2397.50 | 0 |
2018-10-11 | Multi-Stage Fracture | 2335.60 | 2337.50 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-10-10 | 2018-10-11 | 1,277 | 1,914 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | water | 7732-18-5 | 100 | 76.5368 | N/A | |||
Frac Sand - Regular | Iron Horse Energy Services | Crystalline Silica | 14808-60-7 | 100 | 22.2498 | N/A | ||
HCL 15% | Fusion Technologies Inc. | Acid | Hydrogen Chloride | 7647-01-0 | 100 | 0.475 | N/A | |
water | Not Available | 100 | 0.475 | N/A | ||||
Tolcide PS75LT | Fusion Technologies Inc. | Bactericide/Biocide | Tetrakis(Hydroxymethyl) Phosphonium Sulfate | 55566-30-8 | 100 | 0.0478 | N/A | |
water | 7732-18-5 | 100 | 0.0478 | N/A | ||||
IH-BEZ-6D | Fusion Technologies Inc. | Breaker | Ethylene glycol | 107-21-1 | 100 | 0.0561 | N/A | |
IH-CS-4 | Fusion Technologies Inc. | Clay Control | Non-Whimis Regulated | Not Available | 100 | 0.1526 | N/A | |
IH-CBX-5 | Fusion Technologies Inc. | Crosslinker | Boric Acid | 10043-35-3 | 100 | 0.1274 | N/A | |
Ethylene glycol | 107-21-1 | 100 | 0.1274 | N/A | ||||
Potassium Carbonate | 584-08-7 | 100 | 0.1274 | N/A | ||||
Potassium Hydroxide | 1310-58-3 | 100 | 0.1274 | N/A | ||||
IH-GA-1 | Fusion Technologies Inc. | Gelling Agent | Low toxicity mineral oil | 8042-47-5 | 100 | 0.2768 | N/A | |
IH-NE-7 | Fusion Technologies Inc. | Surfactant | Methanol | 67-56-1 | 100 | 0.1206 | N/A | |
Trimethylopropane ethoxylated | 52624-57-4 | 100 | 0.1206 | N/A | ||||
water | 7732-18-5 | 100 | 0.1206 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2018-10-05 | 2018-10-07 | Surface Water - Runoff | 1913 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2018 | 502 | 0.0 | 0.0 | 0.0 |
2019 | 8408 | 0.0 | 0.0 | 0.0 |
2020 | 2171 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-09-11 | No Incident Encountered | 0.00 | 0.00 |
2018-10-15 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]