X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0435043104000

Well Details

Well ID: 0435043104000
Loading map...
Location: 00/04-31-043-04W5/0
Location Alias: 00/04-31-43-04 W5M
Location Alias 2: 00/04-31-043-04 W5/00
Country: Canada
Province: Alberta
Township: 043
Meridian: 5
Range: 04
Section: 31
County/Municipality: Clearwater County
Well Name: TAC 1-1 HZ PEMBINA 4-31-43-4
Operator Name: Tamarack Acquisition Corp.
License Number: 0487509
License Date: 2018-01-03
License Status: Issued
Spud Date: 2018-01-28
Final Drill Date: 2018-02-03
Well Total Depth: 3562.00 m
Surface Hole Latitude: 52.759585
Surface Hole Longitude: -114.584677

For data sources see[1][2]

Well History

Date Event
2018-01-03 Obtained License
2018-01-29 Surface Casing Operation Performed
2018-01-31 Direction Drilling Operation Performed - Deviate
2018-02-01 Direction Drilling Operation Performed - Horizontal
2018-02-03 Finished Drilling
2018-02-03 Well Log Performed
2018-02-03 Well Mode changed to Drilled and Cased
2018-02-04 Production Casing Operation Performed
2018-02-05 Rig Released
2018-02-16 Perforation Treatment Performed - Multi-Stage Fracture
2018-02-17 Perforation Treatment Performed - Multi-Stage Fracture
2018-02-19 Well Began Production
2018-02-19 Well Fluid changed to Crude Oil
2018-02-19 Well Mode changed to Flowing
2018-03-25 Well Fluid changed to Crude Oil
2018-03-25 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-01-28 Excalibur Drilling Ltd. 2 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-01-31 1385.00 Deviate (5 - 79 degrees)
2018-02-01 1749.80 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-02-16 Multi-Stage Fracture 3519.30 3519.40 0
2018-02-16 Multi-Stage Fracture 3097.80 3097.90 0
2018-02-16 Multi-Stage Fracture 3023.60 3023.70 0
2018-02-16 Multi-Stage Fracture 2973.20 2973.30 0
2018-02-16 Multi-Stage Fracture 2922.10 2922.20 0
2018-02-17 Multi-Stage Fracture 2872.10 2872.20 0
2018-02-17 Multi-Stage Fracture 2821.40 2821.50 0
2018-02-17 Multi-Stage Fracture 2770.70 2770.80 0
2018-02-17 Multi-Stage Fracture 2719.70 2719.80 0
2018-02-17 Multi-Stage Fracture 2668.70 2668.80 0
2018-02-17 Multi-Stage Fracture 2617.80 2617.90 0
2018-02-16 Multi-Stage Fracture 3480.00 3480.10 0
2018-02-17 Multi-Stage Fracture 2567.00 2567.10 0
2018-02-17 Multi-Stage Fracture 2516.40 2516.50 0
2018-02-17 Multi-Stage Fracture 2465.90 2466.00 0
2018-02-17 Multi-Stage Fracture 2415.20 2415.30 0
2018-02-17 Multi-Stage Fracture 2364.50 2364.60 0
2018-02-17 Multi-Stage Fracture 2314.10 2314.20 0
2018-02-17 Multi-Stage Fracture 2261.40 2261.50 0
2018-02-17 Multi-Stage Fracture 2209.50 2209.60 0
2018-02-17 Multi-Stage Fracture 2170.10 2170.20 0
2018-02-16 Multi-Stage Fracture 3429.50 3429.60 0
2018-02-16 Multi-Stage Fracture 3390.40 3390.50 0
2018-02-16 Multi-Stage Fracture 3340.00 3340.10 0
2018-02-16 Multi-Stage Fracture 3300.80 3300.90 0
2018-02-16 Multi-Stage Fracture 3249.90 3250.00 0
2018-02-16 Multi-Stage Fracture 3199.30 3199.40 0
2018-02-16 Multi-Stage Fracture 3148.60 3148.70 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-02-16 2018-02-17 1,636 2,749 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 82.692 N/A
20/40 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 16.6813 N/A
30/50 Sand (Domestic) Calfrac Crystalline silica (Quartz) 14808-60-7 100 0.4276 N/A
SaniFrac 8844 Calfrac Bactericide/Biocide Acetamide. 2.2-dibromo-2-cyano 10222-01-2 100 0.0164 N/A
Acetonitrile. 2.2-dibromo 3252-43-5 100 0.0164 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0164 N/A
Polyethylene glycol 25322-68-3 100 0.0164 N/A
Sodium bromide 7647-15-6 100 0.0164 N/A
DWP-913 Calfrac Clay Control Non-Hazardous Ingredients Trade Secret 100 0.0716 N/A
DWP-959 Calfrac Demulsifier Methanol 67-56-1 100 0.0236 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0236 N/A
DynaRate 6104 Calfrac Friction Reducer Ammonium Chloride 12125-02-9 100 0.0872 N/A
Hydrotreated Kerosene 64742-47-8 100 0.0872 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0872 N/A
Oleamide Trade Secret 100 0.0872 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-03-01 2018-03-11 Surface Water - Lake 438
2018-03-01 2018-03-11 Surface Water - Runoff 2500

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 6557 0.0 0.0 0.0
2019 8643 0.0 0.0 0.0
2020 2179 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-02-05 No Incident Encountered 0.00 0.00
2018-02-17 No Incident Encountered 0.00 0.00

For data sources see[10]

References