X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0435053603020

Well Details

Well ID: 0435053603020
Loading map...
Location: 02/03-36-043-05W5/0
Location Alias: 02/03-36-43-05 W5M
Location Alias 2: 02/03-36-043-05 W5/00
Country: Canada
Province: Alberta
Township: 043
Meridian: 5
Range: 05
Section: 36
County/Municipality: Clearwater County
Well Name: TAC 102 HZ PEMBINA 3-36-43-5
Operator Name: Tamarack Acquisition Corp.
License Number: 0479419
License Date: 2016-05-10
License Status: Issued
Spud Date: 2016-05-10
Final Drill Date: 2016-05-20
Well Total Depth: 5402.00 m
Surface Hole Latitude: 52.775006
Surface Hole Longitude: -114.612356

For data sources see[1][2]

Well History

Date Event
2016-05-10 Obtained License
2016-05-11 Surface Casing Operation Performed
2016-05-12 Direction Drilling Operation Performed - Deviate
2016-05-14 Direction Drilling Operation Performed - Horizontal
2016-05-20 Finished Drilling
2016-05-20 Well Log Performed
2016-05-20 Well Mode changed to Drilled and Cased
2016-05-22 Production Casing Operation Performed
2016-05-22 Rig Released
2016-05-29 Perforation Treatment Performed - Multi-Stage Fracture
2016-05-30 Perforation Treatment Performed - Multi-Stage Fracture
2016-05-31 Perforation Treatment Performed - Multi-Stage Fracture
2016-06-01 Perforation Treatment Performed - Multi-Stage Fracture
2016-06-03 Perforation Treatment Performed - Multi-Stage Fracture
2016-06-04 Perforation Treatment Performed - Multi-Stage Fracture
2016-06-05 Perforation Treatment Performed - Multi-Stage Fracture
2016-06-06 Perforation Treatment Performed - Multi-Stage Fracture
2016-06-07 Perforation Treatment Performed - Multi-Stage Fracture
2016-06-09 Well Began Production
2016-06-09 Well Fluid changed to Crude Oil
2016-06-09 Well Mode changed to Flowing
2016-06-19 Well Fluid changed to Crude Oil
2016-06-19 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-05-10 Excalibur Drilling Ltd. 6 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-05-12 690.20 Deviate (5 - 79 degrees)
2016-05-14 2169.90 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-05-29 Multi-Stage Fracture 5339.50 5340.80 0
2016-06-03 Multi-Stage Fracture 4845.70 4846.50 0
2016-06-03 Multi-Stage Fracture 4789.60 4790.40 0
2016-06-03 Multi-Stage Fracture 4734.30 4735.10 0
2016-06-04 Multi-Stage Fracture 4680.40 4681.20 0
2016-06-04 Multi-Stage Fracture 4624.30 4625.10 0
2016-06-04 Multi-Stage Fracture 4568.10 4569.00 0
2016-06-04 Multi-Stage Fracture 4512.00 4512.80 0
2016-06-04 Multi-Stage Fracture 4469.70 4470.50 0
2016-06-04 Multi-Stage Fracture 4413.60 4414.40 0
2016-06-04 Multi-Stage Fracture 4357.60 4358.40 0
2016-05-30 Multi-Stage Fracture 5323.00 5323.80 0
2016-06-04 Multi-Stage Fracture 4301.30 4302.10 0
2016-06-04 Multi-Stage Fracture 4245.20 4246.10 0
2016-06-05 Multi-Stage Fracture 4189.20 4190.00 0
2016-06-05 Multi-Stage Fracture 4146.90 4147.70 0
2016-06-05 Multi-Stage Fracture 4090.90 4091.70 0
2016-06-05 Multi-Stage Fracture 4034.80 4035.60 0
2016-06-05 Multi-Stage Fracture 3978.70 3979.50 0
2016-06-05 Multi-Stage Fracture 3922.60 3923.40 0
2016-06-05 Multi-Stage Fracture 3866.50 3867.30 0
2016-06-05 Multi-Stage Fracture 3810.40 3811.20 0
2016-05-31 Multi-Stage Fracture 5224.50 5225.30 0
2016-06-05 Multi-Stage Fracture 3754.30 3755.10 0
2016-06-05 Multi-Stage Fracture 3698.20 3699.00 0
2016-06-05 Multi-Stage Fracture 3642.20 3643.00 0
2016-06-05 Multi-Stage Fracture 3586.00 3586.80 0
2016-06-05 Multi-Stage Fracture 3543.70 3544.50 0
2016-06-06 Multi-Stage Fracture 3487.70 3488.50 0
2016-06-06 Multi-Stage Fracture 3431.60 3432.40 0
2016-06-06 Multi-Stage Fracture 3375.50 3376.30 0
2016-06-06 Multi-Stage Fracture 3321.50 3322.30 0
2016-06-06 Multi-Stage Fracture 3265.40 3266.20 0
2016-05-31 Multi-Stage Fracture 5168.40 5169.20 0
2016-06-06 Multi-Stage Fracture 3209.30 3210.10 0
2016-06-06 Multi-Stage Fracture 3154.10 3154.90 0
2016-06-06 Multi-Stage Fracture 3098.20 3099.00 0
2016-06-06 Multi-Stage Fracture 3042.10 3042.90 0
2016-06-06 Multi-Stage Fracture 2999.80 3000.60 0
2016-06-07 Multi-Stage Fracture 2943.70 2944.50 0
2016-06-07 Multi-Stage Fracture 2887.60 2888.40 0
2016-06-07 Multi-Stage Fracture 2831.40 2832.30 0
2016-06-07 Multi-Stage Fracture 2775.40 2776.20 0
2016-06-07 Multi-Stage Fracture 2719.30 2720.10 0
2016-05-31 Multi-Stage Fracture 5112.60 5113.40 0
2016-06-07 Multi-Stage Fracture 2663.20 2664.00 0
2016-06-07 Multi-Stage Fracture 2607.10 2607.90 0
2016-06-07 Multi-Stage Fracture 2551.00 2551.80 0
2016-06-07 Multi-Stage Fracture 2494.90 2495.70 0
2016-06-07 Multi-Stage Fracture 2438.80 2439.60 0
2016-06-07 Multi-Stage Fracture 2382.60 2383.50 0
2016-06-07 Multi-Stage Fracture 2326.20 2327.10 0
2016-06-01 Multi-Stage Fracture 5070.20 5071.00 0
2016-06-01 Multi-Stage Fracture 5014.10 5014.90 0
2016-06-01 Multi-Stage Fracture 4958.00 4958.80 0
2016-06-03 Multi-Stage Fracture 4901.90 4902.70 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-05-29 2016-06-07 1,658 6,500 N/A
2 2016-06-01 2016-06-07 1,658 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Nitrogen Not Available 100 7.4113 N/A
Water Not Available 100 84.1187 N/A
20/40 Domestic Sand Step Energy Services Crystalline Silica 14808-60-7 100 14.987 N/A
30/50 Domestic Sand Step Energy Services Crystalline Silica 14808-60-7 100 0.3876 N/A
SCS-1 Step Energy Services Clay Control Choline chloride 67-48-1 100 0.094 N/A
Non-Hazardous Ingredients Not Available 100 0.094 N/A
SNE-3 Step Energy Services Demulsifier Isopropyl Alcohol 67-63-0 100 0.1847 N/A
Methyl Alcohol 67-56-1 100 0.1847 N/A
Non-Hazardous Ingredients Not Available 100 0.1847 N/A
Oxydi-2.1-ethyldiyl)bis(cocoalkyl)dimethyl
ammonium dichloride
68607-28-3 100 0.1847 N/A
SFR-106 Step Energy Services Friction Reducer Ethoxylated Alcohol 78330-21-9 100 0.0742 N/A
Non-Hazardous Ingredients Not Available 100 0.0742 N/A
Petroleum distillates. hydrotreated light 64742-47-8 100 0.0742 N/A
SSI-1 Step Energy Services Scale Inhibitor Methyl Alcohol 67-56-1 100 0.0254 N/A
Non-Hazardous Ingredients Not Available 100 0.0254 N/A
2 SML-7 Step Energy Services Friction Reducer Non-Hazardous Ingredients Not Available 100 0.1743 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2016-05-27 2016-06-08 Surface Water - River 5760
2016-05-27 2016-06-08 Surface Water - River 742

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 4841 0.0 0.0 0.0
2017 8605 0.0 0.0 0.0
2018 8492 0.0 0.0 0.0
2019 8546 0.0 0.0 0.0
2020 2123 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-05-22 No Incident Encountered 0.00 0.00
2016-06-20 No Incident Encountered 0.00 0.00

For data sources see[10]

References