X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0435082202002

Well Details

Well ID: 0435082202002
Loading map...
Location: 00/02-22-043-08W5/2
Location Alias: 00/02-22-43-08 W5M
Location Alias 2: 00/02-22-043-08 W5/02
Country: Canada
Province: Alberta
Township: 043
Meridian: 5
Range: 08
Section: 22
County/Municipality: Clearwater County
Well Name: CYPRESS ET AL WILLGR 2-22-43-8
Operator Name: TAQA North Ltd.
License Number: 0082067
License Date: 1980-04-09
License Status: RecCertified
Spud Date: 1980-05-07
Final Drill Date: 1980-05-26
Well Total Depth: 1930.00 m
Surface Hole Latitude: 52.714335
Surface Hole Longitude: -115.076757

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-04-09 Obtained License
1980-05-18 Kick Occurred
1980-05-23 Kick Occurred
1980-05-24 Kick Occurred
1980-05-26 Finished Drilling
1980-05-26 Kick Occurred
1980-05-26 Well Log Performed
1980-05-26 Well Mode changed to Drilled and Cased
1980-05-29 Production Casing Operation Performed
1980-11-03 Perforation Treatment Performed - Jet Perforation
1980-11-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-11-07 Perforation Treatment Performed - Fractured
1981-01-26 Perforation Treatment Performed - Chemical Squeeze
1981-01-29 Perforation Treatment Performed - Jet Perforation
1981-01-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-12-17 Well Log Performed
1986-12-18 Well Log Performed
1986-12-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1986-12-19 Perforation Treatment Performed - Jet Perforation
1986-12-19 Plug Back Performed
1986-12-19 Well Log Performed
1987-01-11 Well Began Production
1987-01-11 Well Fluid changed to Crude Oil
1987-01-11 Well Mode changed to Pumping
1987-06-02 Perforation Treatment Performed - Fractured
1990-04-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-08-31 Well Fluid changed to Crude Oil
1994-08-31 Well Mode changed to Suspended
1999-10-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-10-12 Perforation Treatment Performed - Jet Perforation
1999-10-12 Perforation Treatment Performed - Remedial Casing
1999-10-12 Plug Back Performed
1999-10-12 Well Abandoned
1999-10-12 Well Fluid changed to Crude Oil
1999-10-12 Well Log Performed
1999-10-12 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-11-03 Perforation 1888.50 1891.00 14
1986-12-19 Perforation 1490.00 1500.00 10
1987-06-02 Fracture 1490.00 1500.00 0
1990-04-20 Acid Treatment 1490.00 1500.00 0
1999-10-12 Packing Device Capped w/Cement 1478.00 1487.00 0
1999-10-12 Perforation 469.00 470.00 14
1999-10-12 Remedial Casing Cementing 469.00 470.00 0
1980-11-06 Acid Treatment 1888.50 1891.00 0
1980-11-07 Fracture 1888.50 1891.00 0
1981-01-26 Chemical Squeeze 1888.50 1891.00 0
1981-01-29 Perforation 1885.50 1887.00 14
1981-01-29 Perforation 1887.50 1888.50 14
1981-01-29 Perforation 1888.50 1891.00 7
1981-01-31 Acid Treatment 1885.50 1891.00 0
1986-12-19 Packing Device Capped w/Cement 1509.00 1510.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1987 8022 0.0 0.0 0.0
1988 7322 0.0 0.0 0.0
1989 6073 0.0 0.0 0.0
1990 5880 0.0 0.0 0.0
1991 7811 0.0 0.0 0.0
1992 6780 0.0 0.0 0.0
1993 7837 0.0 0.0 0.0
1994 4128 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1980-05-18 Kick 1568.00 1568.00
1980-05-23 Kick 1884.00 1884.00
1980-05-24 Kick 1886.00 1886.00
1980-05-26 Kick 1904.00 1904.00

For data sources see[6]

References