X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0435090611002

Well Details

Well ID: 0435090611002
Loading map...
Location: 00/11-06-043-09W5/2
Location Alias: 00/11-06-43-09 W5M
Location Alias 2: 00/11-06-043-09 W5/02
Country: Canada
Province: Alberta
Township: 043
Meridian: 5
Range: 09
Section: 06
County/Municipality: Sunchild Cree 202
Well Name: TQN FERRIER 11-6-43-9
Operator Name: TAQA North Ltd.
License Number: 0071297
License Date: 1978-08-11
License Status: Issued
Spud Date: 1978-09-04
Final Drill Date: 1978-10-14
Well Total Depth: 2845.00 m
Surface Hole Latitude: 52.678796
Surface Hole Longitude: -115.299672

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-08-11 Obtained License
1978-10-14 Finished Drilling
1978-10-15 Well Log Performed
1978-10-17 Drill Stem Test Performed
1978-10-19 Drill Stem Test Performed
1978-10-23 Production Casing Operation Performed
1979-01-17 Perforation Treatment Performed - Jet Perforation
1979-01-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-01-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-01-21 Perforation Treatment Performed - Jet Perforation
1979-01-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-02-01 Perforation Treatment Performed - Fractured
1979-06-29 Perforation Treatment Performed - Jet Perforation
1979-07-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-07-05 Perforation Treatment Performed - Fractured
1979-07-08 Well Mode changed to Drilled and Cased

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-01-17 Perforation 2750.50 2751.70 7
1979-07-05 Fracture 2649.00 2654.00 0
1979-01-17 Perforation 2752.30 2753.70 7
1979-01-18 Acid Treatment 2750.50 2753.70 0
1979-01-21 Packing Device Capped w/Cement 2729.00 2737.00 0
1979-01-21 Perforation 2690.00 2693.00 7
1979-01-26 Acid Treatment 2690.00 2693.00 0
1979-02-01 Fracture 2690.00 2693.00 0
1979-06-29 Perforation 2649.00 2654.00 7
1979-07-04 Acid Treatment 2649.00 2654.00 0

For data sources see[4]



References