X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0435091811000

Well Details

Well ID: 0435091811000
Loading map...
Location: 00/11-18-043-09W5/0
Location Alias: 00/11-18-43-09 W5M
Location Alias 2: 00/11-18-043-09 W5/00
Country: Canada
Province: Alberta
Township: 043
Meridian: 5
Range: 09
Section: 18
County/Municipality: Sunchild Cree 202
Well Name: DAS ET AL SUNCHILD 11-18-43-9
Operator Name: D. A. S. Resource Ventures Ltd.
License Number: 0069316
License Date: 1978-05-02
License Status: RecCertified
Spud Date: 1978-05-21
Final Drill Date: 1978-06-21
Well Total Depth: 2886.20 m
Surface Hole Latitude: 52.707897
Surface Hole Longitude: -115.299373

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-05-02 Obtained License
1978-06-21 Finished Drilling
1978-06-22 Drill Stem Test Performed
1978-06-23 Well Log Performed
1978-06-24 Drill Stem Test Performed
1978-06-27 Drill Stem Test Performed
1978-07-11 Production Casing Operation Performed
1978-07-26 Perforation Treatment Performed - Jet Perforation
1978-07-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-07-29 Perforation Treatment Performed - Jet Perforation
1978-07-30 Perforation Treatment Performed - Fractured
1978-07-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1978-07-31 Perforation Treatment Performed - Jet Perforation
1978-08-01 Perforation Treatment Performed - Fractured
1978-08-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1978-08-02 Perforation Treatment Performed - Jet Perforation
1978-08-05 Perforation Treatment Performed - Cement Squeeze
1978-08-08 Perforation Treatment Performed - Cement Squeeze
1978-08-10 Perforation Treatment Performed - Fractured
1978-08-10 Perforation Treatment Performed - Jet Perforation
1978-08-31 Well Mode changed to Drilled and Cased
1983-03-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1983-03-02 Well Abandoned
1983-03-02 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-07-26 Perforation 2860.90 2861.20 13
1978-07-31 Perforation 2795.00 2799.30 13
1978-08-01 Fracture 2795.00 2799.30 0
1978-08-02 Packing Device Capped w/Cement 2811.80 2816.40 0
1978-08-02 Packing Device Capped w/Cement 2784.30 2788.90 0
1978-08-02 Perforation 2110.70 2112.30 13
1978-08-05 Cement Squeeze 2110.70 2112.30 0
1978-08-08 Cement Squeeze 2110.70 2112.30 0
1978-08-10 Perforation 2110.70 2112.30 13
1978-08-10 Fracture 2110.70 2112.30 0
1983-03-02 Packing Device Capped w/Cement 2087.00 2095.00 0
1978-07-26 Perforation 2863.00 2863.30 13
1978-07-28 Acid Treatment 2860.90 2863.30 0
1978-07-29 Perforation 2819.70 2821.20 13
1978-07-29 Perforation 2822.10 2824.00 13
1978-07-29 Perforation 2824.60 2825.50 13
1978-07-29 Perforation 2826.10 2826.70 13
1978-07-30 Fracture 2819.70 2826.70 0
1978-07-31 Packing Device Capped w/Cement 2843.70 2843.70 0

For data sources see[4]



References