X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0435092304020

Well Details

Well ID: 0435092304020
Loading map...
Location: 02/04-23-043-09W5/0
Location Alias: 02/04-23-43-09 W5M
Location Alias 2: 02/04-23-043-09 W5/00
Country: Canada
Province: Alberta
Township: 043
Meridian: 5
Range: 09
Section: 23
County/Municipality: Clearwater County
Well Name: WESTBRICK 102 HZ WILLGR 4-23-43-9
Operator Name: Westbrick Energy Ltd.
License Number: 0469336
License Date: 2014-08-25
License Status: Amended
Spud Date: 2015-02-28
Final Drill Date: 2015-11-02
Well Total Depth: 3892.20 m
Surface Hole Latitude: 52.728363
Surface Hole Longitude: -115.202017

For data sources see[1][2]

Well History

Date Event
2014-08-25 Obtained License
2015-02-28 Well Mode changed to Preset
2015-03-03 Surface Casing Operation Performed
2015-10-25 Intermediate Casing Operation Performed
2015-10-26 Direction Drilling Operation Performed - Deviate
2015-10-29 Direction Drilling Operation Performed - Horizontal
2015-11-02 Finished Drilling
2015-11-02 Well Log Performed
2015-11-02 Well Mode changed to Drilled and Cased
2015-11-03 Production Casing Operation Performed
2015-11-04 Rig Released
2015-11-07 Well Log Performed
2015-11-16 Perforation Treatment Performed - Multi-Stage Fracture
2015-11-17 Perforation Treatment Performed - Multi-Stage Fracture
2016-08-03 Well Began Production
2016-08-03 Well Fluid changed to Gas
2016-08-03 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-10-21 Trinidad Drilling Ltd. 1 4028 Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-10-26 2076.20 Deviate (5 - 79 degrees)
2015-10-29 2652.90 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-11-16 Multi-Stage Fracture 3720.10 3720.20 0
2015-11-16 Multi-Stage Fracture 3218.60 3218.70 0
2015-11-16 Multi-Stage Fracture 3166.90 3167.00 0
2015-11-16 Multi-Stage Fracture 3103.40 3103.50 0
2015-11-16 Multi-Stage Fracture 3049.00 3049.10 0
2015-11-16 Multi-Stage Fracture 2997.50 2997.60 0
2015-11-16 Multi-Stage Fracture 2944.90 2945.00 0
2015-11-16 Multi-Stage Fracture 2892.70 2892.80 0
2015-11-17 Multi-Stage Fracture 2828.70 2828.80 0
2015-11-17 Multi-Stage Fracture 2776.00 2776.10 0
2015-11-17 Multi-Stage Fracture 2725.50 2725.60 0
2015-11-16 Multi-Stage Fracture 3663.70 3663.80 0
2015-11-17 Multi-Stage Fracture 2663.50 2663.60 0
2015-11-17 Multi-Stage Fracture 2611.90 2612.00 0
2015-11-16 Multi-Stage Fracture 3610.60 3610.70 0
2015-11-16 Multi-Stage Fracture 3545.60 3545.70 0
2015-11-16 Multi-Stage Fracture 3493.30 3493.40 0
2015-11-16 Multi-Stage Fracture 3440.90 3441.00 0
2015-11-16 Multi-Stage Fracture 3388.50 3388.60 0
2015-11-16 Multi-Stage Fracture 3335.50 3335.60 0
2015-11-16 Multi-Stage Fracture 3270.40 3270.50 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-11-16 2015-11-17 2,427 4,754 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 84.6052 N/A
Sand 20/40 Trican silica crystalline 14808-60-7 100 5.7322 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 7.3114 N/A
SBExcel 20/40 Trican silica crystalline 14808-60-7 100 1.9526 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0105 N/A
dibromoacetonitrile 3252-43-5 100 0.0105 N/A
non-hazardous ingredients Not Available 100 0.0105 N/A
polyethylene glycol 25322-68-3 100 0.0105 N/A
sodium bromide 7647-15-6 100 0.0105 N/A
GBO-1 Trican Breaker sodium perborate tetrahydrate 10486-00-7 100 0.0168 N/A
CC-8 Trican Clay Control choline chloride 67-48-1 100 0.1582 N/A
non-hazardous ingredients Not Available 100 0.1582 N/A
GNE-2 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0429 N/A
propylene glycol 57-55-6 100 0.0429 N/A
FR-18 Trican Friction Reducer ammonium chloride 12125-02-9 100 0.0865 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0865 N/A
non-hazardous ingredients Not Available 100 0.0865 N/A
SI-14 Trican Scale Inhibitor methanol 67-56-1 100 0.0832 N/A
non-hazardous ingredients Not Available 100 0.0832 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-11-09 2015-11-12 Surface Water - Runoff 4768

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 2328 0.0 0.0 0.0
2017 8735 0.0 0.0 0.0
2018 8426 0.0 0.0 0.0
2019 8488 0.0 0.0 0.0
2020 2111 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-03-03 No Incident Encountered 0.00 0.00
2015-11-03 No Incident Encountered 0.00 0.00
2015-11-19 No Incident Encountered 0.00 0.00

For data sources see[10]

References