X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0435100207002

Well Details

Well ID: 0435100207002
Loading map...
Location: 00/07-02-043-10W5/2
Location Alias: 00/07-02-43-10 W5M
Location Alias 2: 00/07-02-043-10 W5/02
Country: Canada
Province: Alberta
Township: 043
Meridian: 5
Range: 10
Section: 02
County/Municipality: Sunchild Cree 202
Well Name: TQN FERRIER 7-2-43-10
Operator Name: TAQA North Ltd.
License Number: 0199105
License Date: 1997-03-07
License Status: Abandoned
Spud Date: 1997-03-15
Final Drill Date: 1997-04-10
Well Total Depth: 2947.00 m
Surface Hole Latitude: 52.673189
Surface Hole Longitude: -115.339577

For data sources see[1][2]

Well History

Date Event
1997-03-07 Obtained License
1997-03-17 Surface Casing Operation Performed
1997-04-10 Finished Drilling
1997-04-10 Well Log Performed
1997-04-10 Well Mode changed to Drilled and Cased
1997-04-12 Production Casing Operation Performed
1997-04-12 Rig Released
1997-07-10 Well Log Performed
1997-07-14 Perforation Treatment Performed - Jet Perforation
1997-07-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-07-19 Perforation Treatment Performed - Jet Perforation
2001-01-31 Perforation Treatment Performed - Jet Perforation
2001-02-01 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-02-01 Well Log Performed
2001-03-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-03-29 Perforation Treatment Performed - Jet Perforation
2001-03-29 Plug Back Performed
2001-03-29 Well Log Performed
2001-03-29 Well Mode changed to Drilled and Cased
2001-03-30 Well Log Performed
2001-03-31 Perforation Treatment Performed - Fractured
2001-06-14 Well Began Production
2001-06-14 Well Fluid changed to Gas
2001-06-14 Well Mode changed to Flowing
2002-04-01 Well Fluid changed to Gas
2002-04-01 Well Mode changed to Pumping
2003-09-04 Well Fluid changed to Gas
2003-09-04 Well Mode changed to Suspended
2004-07-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-07-16 Perforation Treatment Performed - Jet Perforation
2004-07-16 Plug Back Performed
2004-07-16 Well Fluid changed to Gas
2004-07-16 Well Log Performed
2004-07-16 Well Mode changed to Abandoned Zone
2004-07-17 Perforation Treatment Performed - Fractured
2004-07-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-07-29 Perforation Treatment Performed - Jet Perforation
2004-07-29 Plug Back Performed
2004-07-29 Well Log Performed
2004-07-30 Perforation Treatment Performed - Cement Squeeze
2004-07-31 Well Log Performed
2007-02-01 Perforation Treatment Performed - Jet Perforation
2007-02-01 Well Log Performed
2007-02-02 Perforation Treatment Performed - Cement Squeeze
2007-02-03 Perforation Treatment Performed - Jet Perforation
2007-02-03 Well Log Performed
2007-02-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-02-05 Perforation Treatment Performed - Cement Squeeze
2007-02-05 Well Log Performed
2007-02-06 Well Log Performed
2007-02-08 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-07-14 Perforation 2880.00 2898.80 20
2004-07-16 Perforation 1550.00 1563.00 17
2004-07-17 Fracture 1555.00 1563.00 0
2004-07-29 Packing Device Capped w/Cement 1533.00 1541.00 0
2004-07-29 Perforation 1100.00 1100.50 13
2004-07-30 Cement Squeeze 1100.00 1100.50 0
2007-02-01 Perforation 1043.00 1044.00 20
2007-02-02 Cement Squeeze 1043.00 1044.00 0
2007-02-03 Perforation 598.00 599.00 20
2007-02-05 Packing Device Capped w/Cement 1032.00 1040.00 0
2007-02-05 Cement Squeeze 598.00 599.00 0
1997-07-17 Acid Treatment 2880.00 2898.80 0
2007-02-05 Packing Device Capped w/Cement 587.00 595.00 0
1997-07-19 Perforation 2898.80 2903.50 20
2001-01-31 Perforation 2901.00 2904.00 20
2001-02-01 Acid Treatment 2880.00 2904.00 0
2001-03-29 Packing Device Capped w/Cement 2858.00 2866.00 0
2001-03-29 Perforation 2748.00 2754.00 13
2001-03-31 Fracture 2748.00 2754.00 0
2004-07-16 Packing Device Capped w/Cement 2732.00 2740.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 2475 0.0 0.0 0.0
2002 2348 0.0 0.0 0.0

For data sources see[5]

References