If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0444010506000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.76013,"lon":-110.117583,"icon":""}]} |
Location: 00/06-05-044-01W4/0 | |
Location Alias: 00/06-05-44-01 W4M | |
Location Alias 2: 00/06-05-044-01 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 044 | |
Meridian: 4 | |
Range: 01 | |
Section: 05 | |
County/Municipality: Municipal District of Wainwright No. 61 | |
Well Name: TAC CHAUVIN 6-5-44-1 | |
Operator Name: Tamarack Acquisition Corp. | |
License Number: 0061934 | |
License Date: 1977-01-05 | |
License Status: Suspension | |
Spud Date: 1977-01-08 | |
Final Drill Date: 1977-01-12 | |
Well Total Depth: 776.90 m | |
Surface Hole Latitude: 52.760130 | |
Surface Hole Longitude: -110.117583 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1977-01-05 | Obtained License |
1977-01-12 | Finished Drilling |
1977-01-17 | Drill Stem Test Performed |
1977-01-18 | Drill Stem Test Performed |
1977-01-19 | Production Casing Operation Performed |
1977-02-02 | Perforation Treatment Performed - Jet Perforation |
1977-02-04 | Perforation Treatment Performed - Cement Squeeze |
1977-02-09 | Perforation Treatment Performed - Jet Perforation |
1977-02-10 | Perforation Treatment Performed - Cement Squeeze |
1977-02-17 | Perforation Treatment Performed - Cement Squeeze |
1977-02-19 | Perforation Treatment Performed - Jet Perforation |
1977-02-20 | Well Mode changed to Drilled and Cased |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1977-02-02 | Perforation | 487.70 | 489.20 | 13 |
1977-02-04 | Cement Squeeze | 487.70 | 489.20 | 0 |
1977-02-09 | Perforation | 455.70 | 457.20 | 13 |
1977-02-10 | Cement Squeeze | 455.70 | 457.20 | 0 |
1977-02-17 | Cement Squeeze | 455.70 | 457.20 | 0 |
1977-02-19 | Perforation | 524.30 | 525.50 | 3 |
1977-02-19 | Perforation | 521.80 | 523.00 | 3 |
1977-02-19 | Perforation | 516.90 | 517.90 | 3 |
1977-02-19 | Perforation | 518.80 | 519.40 | 3 |
For data sources see[4]