If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0444113510002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.838908,"lon":-111.486782,"icon":""}]} |
Location: 00/10-35-044-11W4/2 | |
Location Alias: 00/10-35-44-11 W4M | |
Location Alias 2: 00/10-35-044-11 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 044 | |
Meridian: 4 | |
Range: 11 | |
Section: 35 | |
County/Municipality: Flagstaff County | |
Well Name: PINE CLIFF KILLAM 10-35-44-11 | |
Operator Name: Pine Cliff Energy Ltd. | |
License Number: 0059641 | |
License Date: 1976-08-09 | |
License Status: Abandoned | |
Spud Date: 1976-08-06 | |
Final Drill Date: 1976-08-09 | |
Well Total Depth: 819.90 m | |
Surface Hole Latitude: 52.838908 | |
Surface Hole Longitude: -111.486782 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1976-08-08 | Drill Stem Test Performed |
1976-08-09 | Finished Drilling |
1976-08-09 | Obtained License |
1976-08-09 | Well Mode changed to Drilled and Cased |
1976-08-10 | Drill Stem Test Performed |
1976-08-11 | Production Casing Operation Performed |
1977-09-21 | Perforation Treatment Performed - Jet Perforation |
1989-11-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1989-11-30 | Perforation Treatment Performed - Jet Perforation |
1989-11-30 | Plug Back Performed |
1989-11-30 | Well Log Performed |
1990-01-01 | Well Began Production |
1990-01-01 | Well Fluid changed to Gas |
1990-01-01 | Well Mode changed to Flowing |
1995-05-01 | Well Fluid changed to Gas |
1995-05-01 | Well Mode changed to Suspended |
1995-12-01 | Well Fluid changed to Gas |
1995-12-01 | Well Mode changed to Flowing |
1998-06-01 | Well Fluid changed to Gas |
1998-06-01 | Well Mode changed to Suspended |
2003-07-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2003-07-02 | Plug Back Performed |
2003-07-02 | Well Fluid changed to Gas |
2003-07-02 | Well Mode changed to Abandoned Zone |
2003-07-10 | Well Abandoned |
2003-07-10 | Well Fluid changed to Gas |
2003-07-10 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1977-09-21 | Perforation | 769.60 | 771.10 | 0 |
1989-11-30 | Packing Device Capped w/Cement | 756.00 | 764.00 | 0 |
1989-11-30 | Perforation | 638.60 | 640.70 | 13 |
2003-07-02 | Packing Device Capped w/Cement | 625.00 | 633.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1989 | 716 | 0.0 | 0.0 | 0.0 |
1990 | 6648 | 0.0 | 0.0 | 0.0 |
1991 | 6876 | 0.0 | 0.0 | 0.0 |
1992 | 7494 | 0.0 | 0.0 | 0.0 |
1993 | 7390 | 0.0 | 0.0 | 0.0 |
1994 | 2950 | 0.0 | 0.0 | 0.0 |
1995 | 459 | 0.0 | 0.0 | 0.0 |
1996 | 1056 | 0.0 | 0.0 | 0.0 |
For data sources see[5]