X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0444130607002

Well Details

Well ID: 0444130607002
Loading map...
Location: 00/07-06-044-13W4/2
Location Alias: 00/07-06-44-13 W4M
Location Alias 2: 00/07-06-044-13 W4/02
Country: Canada
Province: Alberta
Township: 044
Meridian: 4
Range: 13
Section: 06
County/Municipality: Flagstaff County
Well Name: PINE CLIFF KILLAMN 7-6-44-13
Operator Name: Pine Cliff Energy Ltd.
License Number: 0073440
License Date: 1978-12-12
License Status: Abandoned
Spud Date: 1979-01-26
Final Drill Date: 1979-01-30
Well Total Depth: 965.00 m
Surface Hole Latitude: 52.760845
Surface Hole Longitude: -111.873981

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-12-12 Obtained License
1979-01-26 Lost Circulation Occurred
1979-01-29 Drill Stem Test Performed
1979-01-30 Finished Drilling
1979-01-30 Well Mode changed to Drilled and Cased
1979-01-31 Drill Stem Test Performed
1979-02-01 Production Casing Operation Performed
1979-05-15 Perforation Treatment Performed - Jet Perforation
1994-09-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-09-27 Perforation Treatment Performed - Jet Perforation
1994-09-27 Plug Back Performed
1994-09-28 Perforation Treatment Performed - Remedial Casing
1994-09-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-09-30 Perforation Treatment Performed - Jet Perforation
1995-07-08 Well Fluid changed to Gas
1995-07-08 Well Mode changed to Testing
1995-08-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-08-26 Plug Back Performed
1995-08-26 Well Fluid changed to Gas
1995-08-26 Well Mode changed to Abandoned Zone
1995-09-09 Well Abandoned
1995-09-09 Well Fluid changed to Gas
1995-09-09 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-05-15 Perforation 896.00 896.40 7
1994-09-27 Packing Device Capped w/Cement 875.00 883.00 0
1994-09-27 Perforation 305.00 305.50 13
1994-09-28 Remedial Casing Cementing 305.00 305.50 0
1994-09-30 Packing Device Capped w/Cement 296.00 300.00 0
1994-09-30 Perforation 268.00 269.00 13
1994-09-30 Perforation 279.50 280.50 13
1995-08-26 Packing Device Capped w/Cement 257.00 265.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 168 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1979-01-26 Lost Circulation 21.00 100.00

For data sources see[6]

References