X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0444152715002

Well Details

Well ID: 0444152715002
Loading map...
Location: 00/15-27-044-15W4/2
Location Alias: 00/15-27-44-15 W4M
Location Alias 2: 00/15-27-044-15 W4/02
Country: Canada
Province: Alberta
Township: 044
Meridian: 4
Range: 15
Section: 27
County/Municipality: Flagstaff County
Well Name: SPL 16-28 HZ ANKER 16-28-44-15
Operator Name: Spur Petroleum Ltd.
License Number: 0453365
License Date: 2013-01-09
License Status: Amended
Spud Date: 2013-02-21
Final Drill Date: 2013-03-07
Well Total Depth: 2085.00 m
Surface Hole Latitude: 52.824916
Surface Hole Longitude: -112.110397

For data sources see[1][2]

Well History

Date Event
2013-01-09 Obtained License
2013-02-22 Surface Casing Operation Performed
2013-03-01 Direction Drilling Operation Performed - Deviate
2013-03-03 Direction Drilling Operation Performed - Horizontal
2013-03-04 Intermediate Casing Operation Performed
2013-03-07 Finished Drilling
2013-03-07 Perforation Treatment Performed - Open-Hole Completion
2013-03-07 Well Log Performed
2013-03-07 Well Mode changed to Drilled and Cased
2013-03-13 Rig Released
2013-03-17 Perforation Treatment Performed - Cement Squeeze
2013-03-17 Perforation Treatment Performed - Jet Perforation
2013-03-17 Plug Back Performed
2013-03-19 Perforation Treatment Performed - Cement Squeeze
2013-03-19 Perforation Treatment Performed - Jet Perforation
2013-03-19 Plug Back Performed
2013-04-01 Well Began Production
2013-04-01 Well Fluid changed to Crude Oil
2013-04-01 Well Mode changed to Pumping
2019-10-01 Well Fluid changed to Crude Oil
2019-10-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2013-03-01 590.20 Deviate (5 - 79 degrees)
2013-03-03 1020.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-03-07 Open Hole/Barefoot Completion 1078.00 2085.00 0
2013-03-17 Perforation 341.00 341.50 20
2013-03-17 Cement Squeeze 341.00 341.50 0
2013-03-19 Perforation 225.50 226.00 20
2013-03-19 Cement Squeeze 225.50 226.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 5810 0.0 0.0 0.0
2014 8309 0.0 0.0 0.0
2015 8426 0.0 0.0 0.0
2016 7937 0.0 0.0 0.0
2017 8060 0.0 0.0 0.0
2018 6528 0.0 0.0 0.0
2019 1802 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-03-24 No Incident Encountered 0.00 0.00

For data sources see[7]

References