X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0444220503002

Well Details

Well ID: 0444220503002
Loading map...
Location: 00/03-05-044-22W4/2
Location Alias: 00/03-05-44-22 W4M
Location Alias 2: 00/03-05-044-22 W4/02
Country: Canada
Province: Alberta
Township: 044
Meridian: 4
Range: 22
Section: 05
County/Municipality: County of Wetaskiwin No. 10
Well Name: EMBER ET AL MALMO 3-5-44-22
Operator Name: Ember Resources Inc.
License Number: 0338149
License Date: 2005-09-14
License Status: Issued
Spud Date: 2005-10-30
Final Drill Date: 2005-11-01
Well Total Depth: 527.00 m
Surface Hole Latitude: 52.759630
Surface Hole Longitude: -113.165162

For data sources see[1][2]

Well History

Date Event
2005-09-14 Obtained License
2005-10-31 Surface Casing Operation Performed
2005-11-01 Finished Drilling
2005-11-01 Production Casing Operation Performed
2005-11-01 Rig Released
2005-11-01 Well Mode changed to Drilled and Cased
2005-11-03 Well Log Performed
2005-11-08 Perforation Treatment Performed - Jet Perforation
2005-11-08 Well Log Performed
2005-11-10 Perforation Treatment Performed - Jet Perforation
2005-11-10 Well Log Performed
2005-11-13 Perforation Treatment Performed - Fractured
2006-06-02 Well Began Production
2006-06-02 Well Fluid changed to Coalbed Methane-Coals Only
2006-06-02 Well Mode changed to Flowing
2008-02-01 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-11-08 Perforation 494.50 497.00 14
2005-11-08 Perforation 368.00 369.00 14
2005-11-08 Perforation 359.00 362.80 14
2005-11-10 Perforation 326.50 329.20 7
2005-11-10 Perforation 321.10 321.90 7
2005-11-10 Perforation 315.90 316.70 7
2005-11-10 Perforation 307.10 308.00 7
2005-11-10 Perforation 296.00 296.90 7
2005-11-10 Perforation 281.80 284.40 7
2005-11-10 Perforation 272.50 275.50 7
2005-11-10 Perforation 269.50 270.10 7
2005-11-08 Perforation 476.00 478.00 14
2005-11-10 Perforation 258.30 259.00 7
2005-11-10 Perforation 255.00 256.70 7
2005-11-10 Perforation 245.30 247.70 7
2005-11-10 Perforation 242.70 243.40 7
2005-11-10 Perforation 240.20 241.60 7
2005-11-10 Perforation 235.30 236.00 7
2005-11-10 Perforation 230.00 230.50 7
2005-11-10 Perforation 222.00 225.20 7
2005-11-10 Perforation 218.00 218.60 7
2005-11-13 Fracture 218.00 329.20 0
2005-11-08 Perforation 424.00 425.00 14
2005-11-08 Perforation 408.00 411.20 14
2005-11-08 Perforation 406.00 407.00 14
2005-11-08 Perforation 392.70 396.00 14
2005-11-08 Perforation 389.50 391.80 14
2005-11-08 Perforation 384.00 384.70 14
2005-11-08 Perforation 371.00 375.00 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 4799 0.0 0.0 0.0
2007 8315 0.0 0.0 0.0
2008 385 0.0 0.0 0.0

For data sources see[5]

References