If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0444220608000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.760554,"lon":-113.17433,"icon":""}]} |
Location: 00/08-06-044-22W4/0 | |
Location Alias: 00/08-06-44-22 W4M | |
Location Alias 2: 00/08-06-044-22 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 044 | |
Meridian: 4 | |
Range: 22 | |
Section: 06 | |
County/Municipality: County of Wetaskiwin No. 10 | |
Well Name: CNRL MALMO 8-6-44-22 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0172406 | |
License Date: 1994-11-14 | |
License Status: RecCertified | |
Spud Date: 1994-11-21 | |
Final Drill Date: 1994-11-28 | |
Well Total Depth: 1660.00 m | |
Surface Hole Latitude: 52.760554 | |
Surface Hole Longitude: -113.174330 |
Date | Event |
---|---|
1994-11-14 | Obtained License |
1994-11-22 | Surface Casing Operation Performed |
1994-11-28 | Finished Drilling |
1994-11-28 | Well Mode changed to Drilled and Cased |
1994-11-29 | Well Log Performed |
1994-11-30 | Production Casing Operation Performed |
1994-11-30 | Rig Released |
1994-12-14 | Perforation Treatment Performed - Jet Perforation |
1996-02-23 | Well Began Production |
1996-02-23 | Well Fluid changed to Crude Oil |
1996-02-23 | Well Mode changed to Flowing |
1996-05-02 | Well Log Performed |
1996-05-03 | Perforation Treatment Performed - Cement Squeeze |
1996-05-04 | Perforation Treatment Performed - Jet Perforation |
1996-05-23 | Well Fluid changed to Gas |
1996-05-23 | Well Mode changed to Flowing |
1997-04-01 | Well Fluid changed to Crude Oil |
1997-04-01 | Well Mode changed to Flowing |
1997-12-19 | Well Fluid changed to Crude Oil |
1997-12-19 | Well Mode changed to Pumping |
2000-09-08 | Perforation Treatment Performed - Cement Squeeze |
2000-09-10 | Perforation Treatment Performed - Jet Perforation |
2000-09-10 | Well Log Performed |
2003-11-30 | Well Fluid changed to Crude Oil |
2003-11-30 | Well Mode changed to Suspended |
2007-01-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2007-01-04 | Perforation Treatment Performed - Jet Perforation |
2007-01-04 | Plug Back Performed |
2007-01-04 | Well Fluid changed to Crude Oil |
2007-01-04 | Well Mode changed to Abandoned Zone |
2007-01-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2007-01-05 | Perforation Treatment Performed - Remedial Casing |
2007-01-16 | Well Abandoned |
2007-01-16 | Well Fluid changed to Crude Oil |
2007-01-16 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1994-12-14 | Perforation | 1622.00 | 1623.00 | 13 |
1996-05-03 | Cement Squeeze | 1622.00 | 1623.00 | 0 |
1996-05-04 | Perforation | 1620.30 | 1620.80 | 13 |
2000-09-08 | Cement Squeeze | 1620.30 | 1620.80 | 0 |
2000-09-10 | Perforation | 1618.80 | 1619.30 | 20 |
2007-01-04 | Packing Device Capped w/Cement | 1602.00 | 1610.00 | 0 |
2007-01-04 | Perforation | 375.00 | 376.00 | 13 |
2007-01-05 | Remedial Casing Cementing | 375.00 | 376.00 | 0 |
2007-01-05 | Packing Device Capped w/Cement | 352.80 | 370.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1996 | 4052 | 0.0 | 0.0 | 0.0 |
1997 | 7515 | 0.0 | 0.0 | 0.0 |
1998 | 3042 | 0.0 | 0.0 | 0.0 |
1999 | 3840 | 0.0 | 0.0 | 0.0 |
2000 | 4040 | 0.0 | 0.0 | 0.0 |
2001 | 7677 | 0.0 | 0.0 | 0.0 |
2002 | 48 | 0.0 | 0.0 | 0.0 |
For data sources see[5]