If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0444220901000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.773739,"lon":-113.129635,"icon":""}]} |
Location: 00/01-09-044-22W4/0 | |
Location Alias: 00/01-09-44-22 W4M | |
Location Alias 2: 00/01-09-044-22 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 044 | |
Meridian: 4 | |
Range: 22 | |
Section: 09 | |
County/Municipality: County of Wetaskiwin No. 10 | |
Well Name: EMBER MALMO 1-9-44-22 | |
Operator Name: Ember Resources Inc. | |
License Number: 0201531 | |
License Date: 1997-05-21 | |
License Status: Suspension | |
Spud Date: 1997-06-15 | |
Final Drill Date: 1997-06-16 | |
Well Total Depth: 525.00 m | |
Surface Hole Latitude: 52.773739 | |
Surface Hole Longitude: -113.129635 |
Date | Event |
---|---|
1997-05-21 | Obtained License |
1997-06-16 | Finished Drilling |
1997-06-16 | Production Casing Operation Performed |
1997-06-16 | Rig Released |
1997-06-16 | Well Mode changed to Drilled and Cased |
1997-07-04 | Well Log Performed |
1997-07-05 | Perforation Treatment Performed - Jet Perforation |
1997-07-08 | Well Log Performed |
1997-07-09 | Perforation Treatment Performed - Fractured |
1997-09-25 | Perforation Treatment Performed - Jet Perforation |
1997-09-25 | Well Log Performed |
1997-10-03 | Perforation Treatment Performed - Fractured |
2004-02-21 | Well Log Performed |
2004-02-26 | Perforation Treatment Performed - Jet Perforation |
2004-02-26 | Well Log Performed |
2004-06-02 | Perforation Treatment Performed - Jet Perforation |
2004-06-04 | Perforation Treatment Performed - Jet Perforation |
2005-01-19 | Well Began Production |
2005-01-19 | Well Fluid changed to Gas |
2005-01-19 | Well Mode changed to Flowing |
2005-12-02 | Well Log Performed |
2009-03-04 | Perforation Treatment Performed - Jet Perforation |
2009-03-04 | Well Log Performed |
2009-03-10 | Perforation Treatment Performed - Fractured |
2009-03-16 | Well Fluid changed to Coalbed Methane-Coals and Other |
2009-03-16 | Well Mode changed to Flowing |
2017-03-14 | Well Fluid changed to Coalbed Methane-Coals and Other |
2017-03-14 | Well Mode changed to Flowing |
2019-01-01 | Well Fluid changed to Coalbed Methane-Coals and Other |
2019-01-01 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1997-07-05 | Perforation | 397.00 | 401.00 | 13 |
2004-02-26 | Perforation | 284.00 | 287.00 | 17 |
2004-02-26 | Perforation | 269.00 | 275.00 | 17 |
2004-02-26 | Perforation | 249.00 | 252.00 | 17 |
2004-02-26 | Perforation | 240.00 | 243.00 | 17 |
2004-02-26 | Perforation | 229.00 | 231.00 | 17 |
2004-02-26 | Perforation | 198.00 | 204.00 | 17 |
2004-02-26 | Perforation | 181.00 | 183.00 | 17 |
2004-06-02 | Perforation | 388.00 | 389.00 | 13 |
2004-06-04 | Perforation | 397.00 | 401.00 | 13 |
2004-06-04 | Perforation | 403.00 | 404.50 | 13 |
1997-07-05 | Perforation | 403.00 | 404.50 | 13 |
2009-03-04 | Perforation | 337.00 | 338.00 | 13 |
2009-03-04 | Perforation | 333.50 | 334.50 | 13 |
2009-03-04 | Perforation | 316.50 | 318.00 | 13 |
2009-03-04 | Perforation | 306.30 | 306.80 | 13 |
2009-03-04 | Perforation | 290.00 | 291.00 | 13 |
2009-03-04 | Perforation | 280.00 | 282.00 | 13 |
2009-03-04 | Perforation | 267.50 | 268.50 | 13 |
2009-03-04 | Perforation | 264.50 | 265.50 | 13 |
2009-03-04 | Perforation | 246.00 | 248.00 | 13 |
2009-03-04 | Perforation | 237.00 | 238.00 | 13 |
1997-07-09 | Fracture | 397.00 | 404.50 | 0 |
2009-03-04 | Perforation | 233.00 | 235.00 | 13 |
2009-03-04 | Perforation | 227.00 | 229.00 | 13 |
2009-03-04 | Perforation | 213.50 | 214.50 | 13 |
2009-03-10 | Fracture | 337.00 | 338.00 | 0 |
2009-03-10 | Fracture | 333.50 | 334.50 | 0 |
2009-03-10 | Fracture | 316.50 | 318.00 | 0 |
2009-03-10 | Fracture | 306.30 | 306.80 | 0 |
2009-03-10 | Fracture | 290.00 | 291.00 | 0 |
2009-03-10 | Fracture | 280.00 | 282.00 | 0 |
2009-03-10 | Fracture | 267.50 | 268.50 | 0 |
1997-09-25 | Perforation | 388.00 | 389.00 | 13 |
2009-03-10 | Fracture | 264.50 | 265.50 | 0 |
2009-03-10 | Fracture | 246.00 | 248.00 | 0 |
2009-03-10 | Fracture | 237.00 | 238.00 | 0 |
2009-03-10 | Fracture | 233.00 | 235.00 | 0 |
2009-03-10 | Fracture | 227.00 | 229.00 | 0 |
2009-03-10 | Fracture | 213.50 | 214.50 | 0 |
1997-10-03 | Fracture | 388.00 | 389.00 | 0 |
2004-02-26 | Perforation | 339.00 | 342.00 | 17 |
2004-02-26 | Perforation | 325.00 | 327.00 | 17 |
2004-02-26 | Perforation | 310.00 | 314.00 | 17 |
2004-02-26 | Perforation | 294.00 | 297.00 | 17 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 3704 | 0.0 | 0.0 | 0.0 |
2006 | 8732 | 0.0 | 0.0 | 0.0 |
2007 | 8710 | 0.0 | 0.0 | 0.0 |
2008 | 8736 | 0.0 | 0.0 | 0.0 |
2009 | 8142 | 0.0 | 0.0 | 0.0 |
2010 | 5807 | 0.0 | 0.0 | 0.0 |
2011 | 8725 | 0.0 | 0.0 | 0.0 |
2012 | 7976 | 0.0 | 0.0 | 0.0 |
2013 | 6872 | 0.0 | 0.0 | 0.0 |
2014 | 6731 | 0.0 | 0.0 | 0.0 |
2015 | 5241 | 0.0 | 0.0 | 0.0 |
2016 | 2016 | 0.0 | 0.0 | 0.0 |
2018 | 90 | 0.0 | 0.0 | 0.0 |
For data sources see[5]