X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0444221105002

Well Details

Well ID: 0444221105002
Loading map...
Location: 00/05-11-044-22W4/2
Location Alias: 00/05-11-44-22 W4M
Location Alias 2: 00/05-11-044-22 W4/02
Country: Canada
Province: Alberta
Township: 044
Meridian: 4
Range: 22
Section: 11
County/Municipality: County of Wetaskiwin No. 10
Well Name: BEAVER LAKE MALMO 5-11L-44-22
Operator Name: Beaver Lake Resources Corporation
License Number: 0005293
License Date: 1952-09-12
License Status: Issued
Spud Date: 1952-10-03
Final Drill Date: 1952-11-05
Well Total Depth: 1607.80 m
Surface Hole Latitude: 52.776304
Surface Hole Longitude: -113.097281

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-09-12 Obtained License
1952-10-14 Drill Stem Test Performed
1952-10-22 Drill Stem Test Performed
1952-11-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1952-11-01 Perforation Treatment Performed - Jet Perforation
1952-11-05 Drill Stem Test Performed
1952-11-05 Finished Drilling
1952-11-05 Well Mode changed to Drilled and Cased
1952-11-06 Production Casing Operation Performed
1952-12-09 Well Began Production
1952-12-09 Well Fluid changed to Crude Oil
1952-12-09 Well Mode changed to Flowing
1953-04-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1953-11-22 Perforation Treatment Performed - Cement Squeeze
1953-12-11 Perforation Treatment Performed - Jet Perforation
1953-12-19 Perforation Treatment Performed - Jet Perforation
1953-12-20 Perforation Treatment Performed - Acid Wash - No Pressure
1954-05-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1954-06-22 Perforation Treatment Performed - Bullet Perforation
1954-06-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1954-12-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1954-12-18 Drill Stem Test Performed
1955-01-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-02-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-03-19 Perforation Treatment Performed - Cement Squeeze
1955-03-20 Well Fluid changed to Crude Oil
1955-03-20 Well Mode changed to Abandoned Zone
1955-06-01 Drill Stem Test Performed
1955-06-06 Drill Stem Test Performed
1955-06-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-06-07 Perforation Treatment Performed - Jet Perforation
1990-06-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-06-22 Perforation Treatment Performed - Jet Perforation
1990-06-22 Plug Back Performed
1990-06-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-07-27 Well Fluid changed to Crude Oil
1990-07-27 Well Mode changed to Pumping
1993-08-11 Perforation Treatment Performed - Jet Perforation
1996-07-05 Well Log Performed
1996-07-09 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-11-01 Perforation 1595.00 1600.20 13
1953-12-19 Perforation 1541.10 1544.10 13
1953-12-19 Perforation 1545.30 1547.20 13
1953-12-20 Acid Wash 1541.10 1547.20 0
1954-05-08 Acid Treatment 1539.20 1547.20 0
1954-06-22 Bullet Perforation 1534.70 1539.20 10
1954-06-25 Acid Treatment 1534.70 1547.20 0
1954-12-14 Acid Treatment 1534.70 1547.20 0
1955-01-31 Acid Treatment 1595.00 1600.20 0
1955-02-07 Acid Treatment 1534.70 1600.20 0
1955-03-19 Cement Squeeze 1534.70 1547.20 0
1952-11-01 Perforation 1539.20 1544.10 13
1955-06-07 Perforation 1595.00 1600.20 13
1955-06-07 Acid Treatment 1595.00 1600.20 0
1990-06-22 Packing Device Capped w/Cement 1582.00 1590.00 0
1990-06-22 Perforation 1534.20 1537.20 13
1990-06-23 Acid Treatment 1534.20 1537.20 0
1993-08-11 Perforation 1514.00 1520.00 13
1996-07-09 Acid Treatment 1514.00 1520.00 0
1952-11-01 Perforation 1545.30 1547.20 13
1952-11-01 Acid Treatment 1539.20 1600.20 0
1952-11-01 Perforation 1532.50 1536.80 13
1952-11-01 Acid Treatment 1532.50 1600.20 0
1953-04-20 Acid Treatment 1595.00 1600.20 0
1953-11-22 Cement Squeeze 1532.50 1547.20 0
1953-12-11 Perforation 1595.00 1600.20 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1990 3361 0.0 0.0 0.0
1991 4475 0.0 0.0 0.0
1993 2673 0.0 0.0 0.0
1994 7871 0.0 0.0 0.0
1995 8752 0.0 0.0 0.0
1996 8707 0.0 0.0 0.0
1997 7868 0.0 0.0 0.0
1998 8423 0.0 0.0 0.0
1999 8519 0.0 0.0 0.0
2000 8207 0.0 0.0 0.0
2001 7703 0.0 0.0 0.0
2002 7092 0.0 0.0 0.0
2003 8759 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8735 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8615 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8076 0.0 0.0 0.0
2013 8729 0.0 0.0 0.0
2014 8753 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 6599 0.0 0.0 0.0
2017 8159 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 7159 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References