X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0444221406000

Well Details

Well ID: 0444221406000
Loading map...
Location: 00/06-14-044-22W4/0
Location Alias: 00/06-14-44-22 W4M
Location Alias 2: 00/06-14-044-22 W4/00
Country: Canada
Province: Alberta
Township: 044
Meridian: 4
Range: 22
Section: 14
County/Municipality: County of Wetaskiwin No. 10
Well Name: CNRL ET AL MALMO 6-14N-44-22
Operator Name: Canadian Natural Resources Limited
License Number: 0005026
License Date: 1952-07-19
License Status: RecCertified
Spud Date: 1952-07-25
Final Drill Date: 1952-08-21
Well Total Depth: 1631.90 m
Surface Hole Latitude: 52.791278
Surface Hole Longitude: -113.091856

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-07-19 Obtained License
1952-08-11 Drill Stem Test Performed
1952-08-21 Drill Stem Test Performed
1952-08-21 Finished Drilling
1952-08-21 Well Mode changed to Drilled and Cased
1952-08-22 Drill Stem Test Performed
1952-08-23 Perforation Treatment Performed - Bullet Perforation
1952-08-23 Production Casing Operation Performed
1952-08-25 Drill Stem Test Performed
1952-08-26 Drill Stem Test Performed
1952-08-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1952-08-26 Perforation Treatment Performed - Bullet Perforation
1952-09-01 Well Began Production
1952-09-01 Well Fluid changed to Crude Oil
1952-09-01 Well Mode changed to Flowing
1955-10-07 Perforation Treatment Performed - Cement Squeeze
1955-10-09 Perforation Treatment Performed - Jet Perforation
1955-10-11 Perforation Treatment Performed - Acid Wash - No Pressure
1957-09-10 Perforation Treatment Performed - Cement Squeeze
1957-09-13 Perforation Treatment Performed - Jet Perforation
1957-09-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1957-09-16 Well Fluid changed to Crude Oil
1957-09-16 Well Mode changed to Pumping
1960-05-01 Perforation Treatment Performed - Cement Squeeze
1960-05-03 Perforation Treatment Performed - Jet Perforation
1960-05-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-03-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-03-10 Perforation Treatment Performed - Cement Squeeze
1961-03-18 Perforation Treatment Performed - Jet Perforation
1961-03-19 Perforation Treatment Performed - Acid Wash - No Pressure
1961-05-24 Perforation Treatment Performed - Cement Squeeze
1961-05-27 Perforation Treatment Performed - Jet Perforation
1961-05-28 Perforation Treatment Performed - Acid Wash - No Pressure
1961-06-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-06-09 Perforation Treatment Performed - Abrasa-Jet Perforation
1961-06-11 Perforation Treatment Performed - Acid Wash - No Pressure
1975-05-22 Well Fluid changed to Crude Oil
1975-05-22 Well Mode changed to Suspended
1988-01-19 Well Fluid changed to Crude Oil
1988-01-19 Well Mode changed to Pumping
1993-10-06 Well Fluid changed to Crude Oil
1993-10-06 Well Mode changed to Pumping
1993-10-08 Well Log Performed
1993-10-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-10-09 Plug Back Performed
1993-10-09 Well Fluid changed to Crude Oil
1993-10-09 Well Mode changed to Abandoned Zone
1993-10-14 Well Log Performed
1993-10-15 Perforation Treatment Performed - Jet Perforation
2005-07-27 Well Log Performed
2005-07-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-07-28 Plug Back Performed
2005-07-28 Well Log Performed
2005-07-29 Perforation Treatment Performed - Jet Perforation
2005-07-29 Well Log Performed
2005-08-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-08-02 Perforation Treatment Performed - Jet Perforation
2005-08-02 Perforation Treatment Performed - Remedial Casing
2005-08-02 Well Log Performed
2005-08-03 Perforation Treatment Performed - Remedial Casing
2005-08-09 Perforation Treatment Performed - Jet Perforation
2005-08-09 Well Log Performed
2005-08-10 Perforation Treatment Performed - Cement Plug
2005-08-10 Perforation Treatment Performed - Remedial Casing
2005-08-11 Perforation Treatment Performed - Jet Perforation
2005-08-11 Well Log Performed
2005-08-12 Perforation Treatment Performed - Remedial Casing
2005-08-22 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-08-23 Bullet Perforation 1562.40 1564.80 13
1960-05-01 Cement Squeeze 1551.40 1553.00 0
1960-05-03 Perforation 1546.30 1548.40 7
1960-05-05 Acid Treatment 1546.30 1548.40 0
1961-03-10 Acid Treatment 1546.30 1548.40 0
1961-03-10 Cement Squeeze 1546.30 1548.40 0
1961-03-18 Perforation 1556.60 1558.10 13
1961-03-19 Acid Wash 1556.60 1558.10 0
1961-05-24 Cement Squeeze 1556.60 1558.10 0
1961-05-27 Perforation 1551.40 1553.00 13
1961-05-28 Acid Wash 1551.40 1553.00 0
1952-08-26 Bullet Perforation 1556.00 1558.40 13
1961-06-06 Acid Treatment 1551.40 1553.00 0
1961-06-09 Hydra Jet Perforation 1546.90 1547.20 0
1961-06-11 Acid Wash 1546.90 1547.20 0
1993-10-09 Packing Device Capped w/Cement 1532.00 1540.00 0
1993-10-15 Perforation 1434.70 1435.90 13
2005-07-28 Packing Device Capped w/Cement 1422.00 1430.00 0
2005-07-29 Perforation 1390.00 1391.00 14
2005-08-02 Remedial Casing Cementing 1390.00 1391.00 0
2005-08-02 Packing Device Capped w/Cement 1379.00 1387.00 0
2005-08-02 Perforation 1280.50 1281.50 14
1952-08-26 Acid Treatment 1556.00 1564.80 0
2005-08-03 Remedial Casing Cementing 1280.50 1281.50 0
2005-08-09 Perforation 1167.00 1168.00 20
2005-08-10 Remedial Casing Cementing 1167.00 1168.00 0
2005-08-10 Cement Plug 1075.40 1168.00 0
2005-08-11 Perforation 167.00 168.00 20
2005-08-12 Remedial Casing Cementing 167.00 168.00 0
1955-10-07 Cement Squeeze 1556.00 1564.80 0
1955-10-09 Perforation 1551.40 1554.50 13
1955-10-11 Acid Wash 1551.40 1554.50 0
1957-09-10 Cement Squeeze 1551.40 1554.50 0
1957-09-13 Perforation 1551.40 1553.00 0
1957-09-15 Acid Treatment 1551.40 1553.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 60 0.0 0.0 0.0
1968 663 0.0 0.0 0.0
1969 649 0.0 0.0 0.0
1970 1270 0.0 0.0 0.0
1971 480 0.0 0.0 0.0
1972 1346 0.0 0.0 0.0
1973 2159 0.0 0.0 0.0
1974 408 0.0 0.0 0.0
1988 1462 0.0 0.0 0.0

For data sources see[5]

References