X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0444221412003

Well Details

Well ID: 0444221412003
Loading map...
Location: 00/12-14-044-22W4/3
Location Alias: 00/12-14-44-22 W4M
Location Alias 2: 00/12-14-044-22 W4/03
Country: Canada
Province: Alberta
Township: 044
Meridian: 4
Range: 22
Section: 14
County/Municipality: County of Wetaskiwin No. 10
Well Name: CNRL ET AL MALMO 12-14-44-22
Operator Name: Canadian Natural Resources Limited
License Number: 0004931
License Date: 1952-07-03
License Status: RecCertified
Spud Date: 1952-07-10
Final Drill Date: 1952-08-03
Well Total Depth: 1618.50 m
Surface Hole Latitude: 52.794024
Surface Hole Longitude: -113.096136

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-07-03 Obtained License
1952-08-01 Liner Casing Operation Performed
1952-08-03 Drill Stem Test Performed
1952-08-03 Finished Drilling
1952-08-03 Well Mode changed to Drilled and Cased
1952-08-08 Perforation Treatment Performed - Bullet Perforation
1952-08-09 Perforation Treatment Performed - Bullet Perforation
1953-09-05 Perforation Treatment Performed - Cement Squeeze
1953-09-06 Perforation Treatment Performed - Jet Perforation
1953-09-09 Perforation Treatment Performed - Cement Squeeze
1953-09-12 Perforation Treatment Performed - Jet Perforation
1953-09-19 Perforation Treatment Performed - Cement Squeeze
1953-10-13 Well Began Production
1953-10-13 Well Fluid changed to Crude Oil
1953-10-13 Well Mode changed to Flowing
1966-01-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1966-01-29 Well Fluid changed to Crude Oil
1966-01-29 Well Mode changed to Flowing
1973-12-31 Well Fluid changed to Crude Oil
1973-12-31 Well Mode changed to Suspended
1989-11-29 Well Log Performed
1989-12-01 Well Log Performed
1989-12-02 Well Log Performed
1990-05-16 Perforation Treatment Performed - Cement Squeeze
1990-05-16 Well Fluid changed to Crude Oil
1990-05-16 Well Mode changed to Abandoned Zone
1990-05-23 Perforation Treatment Performed - Jet Perforation
1990-05-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-05-25 Well Log Performed
1990-05-26 Perforation Treatment Performed - Jet Perforation
1990-05-26 Well Log Performed
1992-03-03 Well Log Performed
1992-03-04 Perforation Treatment Performed - Jet Perforation
1998-04-20 Perforation Treatment Performed - Jet Perforation
1998-04-20 Well Log Performed
2003-07-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-07-10 Plug Back Performed
2003-07-10 Well Log Performed
2003-07-11 Perforation Treatment Performed - Jet Perforation
2005-08-13 Well Log Performed
2005-08-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-08-14 Plug Back Performed
2005-08-15 Perforation Treatment Performed - Cement Plug
2005-08-15 Perforation Treatment Performed - Jet Perforation
2005-08-15 Perforation Treatment Performed - Remedial Casing
2005-09-02 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-08-08 Bullet Perforation 1555.70 1557.20 13
1990-05-23 Perforation 1608.40 1610.90 13
1990-05-25 Packing Device Capped w/Cement 1598.00 1609.00 0
1990-05-26 Perforation 1596.50 1597.80 13
1992-03-04 Perforation 1593.50 1594.70 13
1998-04-20 Perforation 1589.50 1591.50 18
2003-07-10 Packing Device Capped w/Cement 1567.00 1575.00 0
2003-07-10 Packing Device Capped w/Cement 1544.00 1552.00 0
2003-07-11 Perforation 1429.50 1431.50 20
2003-07-11 Perforation 1434.00 1435.60 20
2005-08-14 Packing Device Capped w/Cement 1417.00 1425.00 0
1952-08-09 Bullet Perforation 1608.40 1610.90 13
2005-08-15 Perforation 355.00 356.00 20
2005-08-15 Remedial Casing Cementing 355.00 356.00 0
2005-08-15 Cement Plug 276.00 359.00 0
1953-09-05 Cement Squeeze 1555.70 1557.20 0
1953-09-06 Perforation 1439.00 1439.90 13
1953-09-09 Cement Squeeze 1439.00 1439.90 0
1953-09-12 Perforation 1439.90 1440.50 13
1953-09-19 Cement Squeeze 1555.70 1557.20 0
1966-01-29 Packing Device Capped w/Cement 1566.70 1566.70 0
1990-05-16 Cement Squeeze 1439.90 1440.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 65 0.0 0.0 0.0
1968 265 0.0 0.0 0.0
1969 210 0.0 0.0 0.0
1970 201 0.0 0.0 0.0
1971 211 0.0 0.0 0.0
1972 296 0.0 0.0 0.0
1973 870 0.0 0.0 0.0

For data sources see[5]

References