If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0444221509000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.794166,"lon":-113.103013,"icon":""}]} |
Location: 00/09-15-044-22W4/0 | |
Location Alias: 00/09-15-44-22 W4M | |
Location Alias 2: 00/09-15-044-22 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 044 | |
Meridian: 4 | |
Range: 22 | |
Section: 15 | |
County/Municipality: County of Wetaskiwin No. 10 | |
Well Name: SCURRY MALMO NO. 5 | |
Operator Name: Devon Canada Corporation | |
License Number: 0004472 | |
License Date: 1952-04-04 | |
License Status: RecCertified | |
Spud Date: 1952-04-23 | |
Final Drill Date: 1952-05-28 | |
Well Total Depth: 1677.90 m | |
Surface Hole Latitude: 52.794166 | |
Surface Hole Longitude: -113.103013 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1952-04-04 | Obtained License |
1952-05-04 | Drill Stem Test Performed |
1952-05-10 | Drill Stem Test Performed |
1952-05-19 | Drill Stem Test Performed |
1952-05-20 | Drill Stem Test Performed |
1952-05-23 | Drill Stem Test Performed |
1952-05-28 | Finished Drilling |
1952-05-28 | Production Casing Operation Performed |
1952-05-28 | Well Mode changed to Drilled and Cased |
1952-06-02 | Perforation Treatment Performed - Bullet Perforation |
1952-06-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1952-06-15 | Perforation Treatment Performed - Acid Wash - No Pressure |
1952-06-25 | Perforation Treatment Performed - Acid Wash - No Pressure |
1952-09-19 | Well Began Production |
1952-09-19 | Well Fluid changed to Crude Oil |
1952-09-19 | Well Mode changed to Pumping |
1954-02-17 | Perforation Treatment Performed - Bullet Perforation |
1965-03-05 | Perforation Treatment Performed - Cement Squeeze |
1965-03-18 | Perforation Treatment Performed - Bullet Perforation |
1965-03-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1965-03-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1989-01-31 | Well Fluid changed to Crude Oil |
1989-01-31 | Well Mode changed to Suspended |
1993-07-16 | Well Log Performed |
1993-07-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1993-07-17 | Plug Back Performed |
1993-07-17 | Well Abandoned |
1993-07-17 | Well Fluid changed to Crude Oil |
1993-07-17 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1952-06-02 | Bullet Perforation | 1555.10 | 1556.90 | 13 |
1965-03-19 | Acid Treatment | 1562.40 | 1563.90 | 0 |
1965-03-20 | Acid Treatment | 1562.40 | 1563.90 | 0 |
1993-07-17 | Packing Device Capped w/Cement | 1539.00 | 1547.00 | 0 |
1952-06-02 | Bullet Perforation | 1557.20 | 1560.90 | 13 |
1952-06-05 | Acid Treatment | 1555.10 | 1560.90 | 0 |
1952-06-15 | Acid Wash | 1555.10 | 1560.90 | 0 |
1952-06-25 | Acid Wash | 1555.10 | 1560.90 | 0 |
1954-02-17 | Bullet Perforation | 1552.00 | 1553.90 | 7 |
1954-02-17 | Bullet Perforation | 1562.40 | 1562.70 | 0 |
1965-03-05 | Cement Squeeze | 1552.00 | 1562.70 | 0 |
1965-03-18 | Bullet Perforation | 1562.40 | 1563.90 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 0 | 0.0 | 0.0 | 0.0 |
1968 | 1464 | 0.0 | 0.0 | 0.0 |
1969 | 8759 | 0.0 | 0.0 | 0.0 |
1970 | 8495 | 0.0 | 0.0 | 0.0 |
1971 | 8623 | 0.0 | 0.0 | 0.0 |
1972 | 8746 | 0.0 | 0.0 | 0.0 |
1973 | 8674 | 0.0 | 0.0 | 0.0 |
1974 | 8759 | 0.0 | 0.0 | 0.0 |
1975 | 8759 | 0.0 | 0.0 | 0.0 |
1976 | 8783 | 0.0 | 0.0 | 0.0 |
1977 | 8754 | 0.0 | 0.0 | 0.0 |
1978 | 8708 | 0.0 | 0.0 | 0.0 |
1979 | 8681 | 0.0 | 0.0 | 0.0 |
1980 | 8725 | 0.0 | 0.0 | 0.0 |
1981 | 8462 | 0.0 | 0.0 | 0.0 |
1982 | 8531 | 0.0 | 0.0 | 0.0 |
1983 | 8694 | 0.0 | 0.0 | 0.0 |
1984 | 8166 | 0.0 | 0.0 | 0.0 |
1985 | 8636 | 0.0 | 0.0 | 0.0 |
1986 | 8558 | 0.0 | 0.0 | 0.0 |
1987 | 8507 | 0.0 | 0.0 | 0.0 |
1988 | 8541 | 0.0 | 0.0 | 0.0 |
1989 | 288 | 0.0 | 0.0 | 0.0 |
For data sources see[5]