X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0444222302020

Well Details

Well ID: 0444222302020
Loading map...
Location: 02/02-23-044-22W4/0
Location Alias: 02/02-23-44-22 W4M
Location Alias 2: 02/02-23-044-22 W4/00
Country: Canada
Province: Alberta
Township: 044
Meridian: 4
Range: 22
Section: 23
County/Municipality: County of Wetaskiwin No. 10
Well Name: CNRL MALMO 2-23-44-22
Operator Name: Canadian Natural Resources Limited
License Number: 0006242
License Date: 1953-03-26
License Status: Abandoned
Spud Date: 1953-03-28
Final Drill Date: 1953-04-22
Well Total Depth: 1560.90 m
Surface Hole Latitude: 52.800905
Surface Hole Longitude: -113.084438

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-03-26 Obtained License
1953-04-17 Drill Stem Test Performed
1953-04-19 Production Casing Operation Performed
1953-04-22 Finished Drilling
1953-04-22 Perforation Treatment Performed - Open-Hole Completion
1953-04-22 Well Mode changed to Drilled and Cased
1953-04-23 Drill Stem Test Performed
1953-04-26 Well Began Production
1953-04-26 Well Fluid changed to Crude Oil
1953-04-26 Well Mode changed to Pumping
1953-04-30 Perforation Treatment Performed - Bullet Perforation
1953-04-30 Perforation Treatment Performed - Cement Squeeze
1953-04-30 Perforation Treatment Performed - Jet Perforation
1954-03-05 Perforation Treatment Performed - Cement Squeeze
1954-03-06 Perforation Treatment Performed - Jet Perforation
1955-07-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-07-26 Perforation Treatment Performed - Cement Squeeze
1955-07-28 Perforation Treatment Performed - Bullet Perforation
1955-07-28 Perforation Treatment Performed - Jet Perforation
1955-08-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-08-06 Perforation Treatment Performed - Cement Squeeze
1955-08-08 Perforation Treatment Performed - Open-Hole Completion
1955-08-11 Perforation Treatment Performed - Cement Squeeze
1955-08-12 Perforation Treatment Performed - Bullet Perforation
1955-08-12 Perforation Treatment Performed - Jet Perforation
1958-08-06 Perforation Treatment Performed - Bullet Perforation
1989-09-10 Well Log Performed
1989-09-13 Well Log Performed
1989-09-14 Perforation Treatment Performed - Jet Perforation
1989-09-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-09-20 Perforation Treatment Performed - Jet Perforation
1989-09-20 Well Log Performed
1989-09-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-10-27 Perforation Treatment Performed - Jet Perforation
1989-10-27 Well Fluid changed to Crude Oil
1989-10-27 Well Mode changed to Pumping
1990-06-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-06-17 Plug Back Performed
1990-06-17 Well Abandoned
1990-06-17 Well Fluid changed to Crude Oil
1990-06-17 Well Log Performed
1990-06-17 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-04-22 Open Hole/Barefoot Completion 1554.50 1559.40 0
1955-07-28 Perforation 1545.00 1548.10 13
1955-07-28 Bullet Perforation 1545.00 1548.10 13
1955-08-06 Acid Treatment 1545.00 1548.10 0
1955-08-06 Cement Squeeze 1545.00 1548.10 0
1955-08-08 Open Hole/Barefoot Completion 1554.50 1560.90 0
1955-08-11 Cement Squeeze 1545.00 1560.90 0
1955-08-12 Perforation 1540.20 1543.20 0
1955-08-12 Bullet Perforation 1540.20 1543.20 13
1958-08-06 Bullet Perforation 1540.20 1543.20 13
1989-09-14 Perforation 1534.00 1535.20 13
1953-04-30 Cement Squeeze 1554.50 1559.40 0
1989-09-15 Acid Treatment 1534.00 1535.20 0
1989-09-20 Perforation 1509.00 1511.80 13
1989-09-21 Acid Treatment 1509.00 1511.80 0
1989-10-27 Perforation 1429.50 1431.00 13
1990-06-17 Packing Device Capped w/Cement 1407.00 1415.00 0
1953-04-30 Perforation 1549.90 1553.00 13
1953-04-30 Bullet Perforation 1549.90 1553.00 16
1954-03-05 Cement Squeeze 1549.90 1553.00 0
1954-03-06 Perforation 1545.00 1548.10 26
1955-07-26 Acid Treatment 1549.90 1553.00 0
1955-07-26 Acid Treatment 1554.50 1559.40 0
1955-07-26 Cement Squeeze 1545.00 1559.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 5454 0.0 0.0 0.0
1968 6903 0.0 0.0 0.0
1969 6457 0.0 0.0 0.0
1970 5219 0.0 0.0 0.0
1971 5456 0.0 0.0 0.0
1972 6032 0.0 0.0 0.0
1973 7700 0.0 0.0 0.0
1974 8691 0.0 0.0 0.0
1975 8341 0.0 0.0 0.0
1976 7761 0.0 0.0 0.0
1977 8496 0.0 0.0 0.0
1978 8312 0.0 0.0 0.0
1979 8353 0.0 0.0 0.0
1980 8703 0.0 0.0 0.0
1981 8050 0.0 0.0 0.0
1982 7948 0.0 0.0 0.0
1983 8408 0.0 0.0 0.0
1984 8709 0.0 0.0 0.0
1985 8456 0.0 0.0 0.0
1986 8040 0.0 0.0 0.0
1987 8325 0.0 0.0 0.0
1988 8351 0.0 0.0 0.0
1989 4457 0.0 0.0 0.0

For data sources see[5]

References