If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0444222303002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.800877,"lon":-113.090069,"icon":""}]} |
Location: 00/03-23-044-22W4/2 | |
Location Alias: 00/03-23-44-22 W4M | |
Location Alias 2: 00/03-23-044-22 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 044 | |
Meridian: 4 | |
Range: 22 | |
Section: 23 | |
County/Municipality: County of Wetaskiwin No. 10 | |
Well Name: CNRL MALMO 3-23-44-22 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0005453 | |
License Date: 1952-10-08 | |
License Status: Abandoned | |
Spud Date: 1952-10-24 | |
Final Drill Date: 1952-11-28 | |
Well Total Depth: 1611.50 m | |
Surface Hole Latitude: 52.800877 | |
Surface Hole Longitude: -113.090069 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1952-10-08 | Obtained License |
1952-11-01 | Drill Stem Test Performed |
1952-11-17 | Drill Stem Test Performed |
1952-11-21 | Drill Stem Test Performed |
1952-11-22 | Drill Stem Test Performed |
1952-11-24 | Drill Stem Test Performed |
1952-11-28 | Drill Stem Test Performed |
1952-11-28 | Finished Drilling |
1952-11-28 | Well Mode changed to Drilled and Cased |
1952-11-29 | Production Casing Operation Performed |
1952-12-01 | Perforation Treatment Performed - Selective Bullet Perforations |
1952-12-14 | Drill Stem Test Performed |
1952-12-14 | Perforation Treatment Performed - Bullet Perforation |
1952-12-14 | Perforation Treatment Performed - Jet Perforation |
1952-12-14 | Perforation Treatment Performed - Open-Hole Completion |
1952-12-28 | Well Began Production |
1952-12-28 | Well Fluid changed to Crude Oil |
1952-12-28 | Well Mode changed to Flowing |
1957-08-30 | Well Fluid changed to Crude Oil |
1957-08-30 | Well Mode changed to Pumping |
1960-01-18 | Well Fluid changed to Crude Oil |
1960-01-18 | Well Mode changed to Suspended |
1963-10-06 | Perforation Treatment Performed - Cement Squeeze |
1963-10-07 | Perforation Treatment Performed - Cement Squeeze |
1963-10-07 | Perforation Treatment Performed - Jet Perforation |
1963-10-07 | Well Fluid changed to Crude Oil |
1963-10-07 | Well Mode changed to Abandoned Zone |
1964-01-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1989-10-06 | Well Log Performed |
1989-11-08 | Well Log Performed |
1989-11-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1989-11-09 | Plug Back Performed |
1989-11-10 | Perforation Treatment Performed - Jet Perforation |
1989-11-26 | Well Log Performed |
1989-11-27 | Perforation Treatment Performed - Jet Perforation |
1989-12-01 | Well Log Performed |
1990-05-07 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1990-09-25 | Well Log Performed |
1990-09-26 | Perforation Treatment Performed - Jet Perforation |
1993-10-20 | Well Log Performed |
1993-10-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1993-10-21 | Plug Back Performed |
1993-10-23 | Well Log Performed |
1993-10-25 | Well Log Performed |
1993-10-26 | Perforation Treatment Performed - Jet Perforation |
2006-06-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-06-02 | Perforation Treatment Performed - Cement Plug |
2006-06-02 | Plug Back Performed |
2006-06-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-06-03 | Perforation Treatment Performed - Jet Perforation |
2006-06-03 | Perforation Treatment Performed - Remedial Casing |
2006-06-19 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1952-12-01 | Selective Bullet Perforations | 1432.60 | 1434.70 | 0 |
1989-11-10 | Perforation | 1521.00 | 1525.00 | 13 |
1989-11-27 | Perforation | 1535.00 | 1537.00 | 13 |
1990-05-07 | Packing Device Capped w/Cement | 1530.00 | 1532.00 | 0 |
1990-09-26 | Perforation | 1514.50 | 1516.00 | 13 |
1990-09-26 | Perforation | 1517.50 | 1519.00 | 13 |
1993-10-21 | Packing Device Capped w/Cement | 1502.00 | 1510.00 | 0 |
1993-10-26 | Perforation | 1428.00 | 1430.00 | 13 |
2006-06-02 | Packing Device Capped w/Cement | 1412.00 | 1420.00 | 0 |
2006-06-02 | Cement Plug | 1150.60 | 1200.00 | 0 |
2006-06-03 | Perforation | 394.00 | 397.00 | 13 |
1952-12-14 | Open Hole/Barefoot Completion | 1607.80 | 1611.50 | 0 |
2006-06-03 | Remedial Casing Cementing | 394.00 | 397.00 | 0 |
2006-06-03 | Packing Device Capped w/Cement | 371.00 | 386.00 | 0 |
1952-12-14 | Perforation | 1432.60 | 1434.70 | 7 |
1952-12-14 | Bullet Perforation | 1432.60 | 1434.70 | 13 |
1963-10-06 | Cement Squeeze | 1607.80 | 1611.50 | 0 |
1963-10-07 | Cement Squeeze | 1432.60 | 1434.70 | 0 |
1963-10-07 | Perforation | 1601.70 | 1603.20 | 7 |
1964-01-25 | Acid Treatment | 1601.70 | 1603.20 | 0 |
1989-11-09 | Packing Device Capped w/Cement | 1579.00 | 1587.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]