X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0444223607005

Well Details

Well ID: 0444223607005
Loading map...
Location: 00/07-36-044-22W4/5
Location Alias: 00/07-36-44-22 W4M
Location Alias 2: 00/07-36-044-22 W4/05
Country: Canada
Province: Alberta
Township: 044
Meridian: 4
Range: 22
Section: 36
County/Municipality: County of Wetaskiwin No. 10
Well Name: DAVID NO. 7
Operator Name: Canadian Natural Resources Limited
License Number: 0004002
License Date: 1951-12-27
License Status: Abandoned
Spud Date: 1952-01-05
Final Drill Date: 1952-02-11
Well Total Depth: 1543.80 m
Surface Hole Latitude: 52.834784
Surface Hole Longitude: -113.061790

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-12-27 Obtained License
1952-01-15 Drill Stem Test Performed
1952-01-16 Drill Stem Test Performed
1952-01-26 Drill Stem Test Performed
1952-02-04 Drill Stem Test Performed
1952-02-11 Drill Stem Test Performed
1952-02-11 Finished Drilling
1952-02-11 Well Mode changed to Drilled and Cased
1952-02-13 Production Casing Operation Performed
1952-02-14 Perforation Treatment Performed - Bullet Perforation
1966-09-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-02-03 Perforation Treatment Performed - Cement Squeeze
1981-02-05 Perforation Treatment Performed - Jet Perforation
1985-09-10 Perforation Treatment Performed - Chemical Squeeze
1985-12-22 Perforation Treatment Performed - Cement Squeeze
1985-12-22 Plug Back Performed
1985-12-23 Perforation Treatment Performed - Jet Perforation
1996-02-20 Perforation Treatment Performed - Cement Squeeze
1996-02-20 Plug Back Performed
1996-02-23 Perforation Treatment Performed - Jet Perforation
1996-02-23 Well Log Performed
1996-02-26 Perforation Treatment Performed - Jet Perforation
1996-02-26 Well Log Performed
1999-04-18 Perforation Treatment Performed - Jet Perforation
1999-04-18 Well Log Performed
2002-05-25 Perforation Treatment Performed - Cement Plug
2002-05-25 Plug Back Performed
2002-05-26 Perforation Treatment Performed - Jet Perforation
2002-05-26 Well Log Performed
2002-05-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-05-27 Perforation Treatment Performed - Jet Perforation
2002-05-27 Plug Back Performed
2002-05-27 Well Log Performed
2002-05-27 Well Mode changed to Abandoned Zone
2002-05-28 Perforation Treatment Performed - Remedial Casing
2002-10-25 Well Abandoned
2002-10-25 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-02-14 Bullet Perforation 1432.30 1443.20 13
1996-02-26 Perforation 1369.20 1371.00 17
1999-04-18 Perforation 1364.00 1365.80 14
1999-04-18 Perforation 1367.30 1369.00 14
2002-05-25 Cement Plug 1150.00 1380.00 0
2002-05-26 Perforation 1107.00 1108.30 17
2002-05-27 Packing Device Capped w/Cement 1091.00 1099.00 0
2002-05-27 Perforation 267.00 268.00 17
2002-05-28 Remedial Casing Cementing 267.00 268.00 0
1966-09-09 Acid Treatment 1432.30 1438.40 0
1981-02-03 Cement Squeeze 1432.30 1443.20 0
1981-02-05 Perforation 1298.90 1302.50 13
1985-09-10 Chemical Squeeze 1298.90 1302.50 0
1985-12-22 Cement Squeeze 1298.90 1302.50 0
1985-12-23 Perforation 1290.50 1291.70 13
1996-02-20 Cement Squeeze 1290.50 1291.70 0
1996-02-23 Perforation 1367.30 1369.20 17

For data sources see[4]



References