X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0445041714000

Well Details

Well ID: 0445041714000
Loading map...
Location: 00/14-17-044-04W5/0
Location Alias: 00/14-17-44-04 W5M
Location Alias 2: 00/14-17-044-04 W5/00
Country: Canada
Province: Alberta
Township: 044
Meridian: 5
Range: 04
Section: 17
County/Municipality: Ponoka County
Well Name: CLEARVIEW PEMBINA 14-17-44-4
Operator Name: Clearview Resources Ltd.
License Number: 0140521
License Date: 1989-07-28
License Status: Suspension
Spud Date: 1989-07-30
Final Drill Date: 1989-08-10
Well Total Depth: 2157.00 m
Surface Hole Latitude: 52.799559
Surface Hole Longitude: -114.546338

For data sources see[1][2]

Well History

Date Event
1989-07-28 Obtained License
1989-07-30 Surface Casing Operation Performed
1989-08-07 Drill Stem Test Performed
1989-08-10 Finished Drilling
1989-08-10 Well Log Performed
1989-08-10 Well Mode changed to Drilled and Cased
1989-08-12 Drill Stem Test Performed
1989-08-13 Production Casing Operation Performed
1989-08-13 Rig Released
1989-08-23 Well Log Performed
1989-08-24 Perforation Treatment Performed - Jet Perforation
1989-08-27 Perforation Treatment Performed - Fractured
1989-09-07 Well Began Production
1989-09-07 Well Fluid changed to Crude Oil
1989-09-07 Well Mode changed to Flowing
1989-12-17 Well Fluid changed to Crude Oil
1989-12-17 Well Mode changed to Pumping
1997-05-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-05-27 Plug Back Performed
1997-05-27 Well Fluid changed to Crude Oil
1997-05-27 Well Mode changed to Abandoned Zone
1997-05-28 Perforation Treatment Performed - Fractured
1997-05-28 Perforation Treatment Performed - Jet Perforation
1997-05-28 Well Log Performed
2003-08-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-08-28 Plug Back Performed
2003-08-29 Well Log Performed
2003-08-30 Perforation Treatment Performed - Jet Perforation
2003-09-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-09-04 Plug Back Performed
2006-02-04 Perforation Treatment Performed - Jet Perforation
2006-02-09 Well Log Performed
2006-02-10 Perforation Treatment Performed - Cement Squeeze
2006-02-10 Plug Back Performed
2006-02-24 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-08-24 Perforation 1898.80 1903.00 13
2006-02-10 Cement Squeeze 1245.00 1250.00 0
2006-02-24 Perforation 1619.00 1622.50 17
1989-08-27 Fracture 1898.80 1903.00 0
1997-05-27 Packing Device Capped w/Cement 1885.00 1893.00 0
1997-05-28 Perforation 1619.00 1622.50 17
1997-05-28 Fracture 1619.00 1622.50 0
2003-08-28 Packing Device Capped w/Cement 1607.00 1615.00 0
2003-08-30 Perforation 1245.00 1250.00 7
2003-09-04 Packing Device Capped w/Cement 1227.00 1235.00 0
2006-02-04 Perforation 1245.00 1250.00 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 974 0.0 0.0 0.0
1990 2333 0.0 0.0 0.0
1991 4610 0.0 0.0 0.0
1992 6748 0.0 0.0 0.0
1993 6229 0.0 0.0 0.0
1994 7355 0.0 0.0 0.0
1995 6564 0.0 0.0 0.0
1996 2233 0.0 0.0 0.0

For data sources see[5]

References