X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0445042704000

Well Details

Well ID: 0445042704000
Loading map...
Location: 00/04-27-044-04W5/0
Location Alias: 00/04-27-44-04 W5M
Location Alias 2: 00/04-27-044-04 W5/00
Country: Canada
Province: Alberta
Township: 044
Meridian: 5
Range: 04
Section: 27
County/Municipality: Ponoka County
Well Name: TAC PEMBINA 4-27-44-4
Operator Name: Tamarack Acquisition Corp.
License Number: 0097289
License Date: 1982-09-03
License Status: Suspension
Spud Date: 1982-09-20
Final Drill Date: 1982-09-30
Well Total Depth: 2068.00 m
Surface Hole Latitude: 52.817899
Surface Hole Longitude: -114.503789

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-09-03 Obtained License
1982-09-30 Finished Drilling
1982-10-01 Drill Stem Test Performed
1982-10-02 Drill Stem Test Performed
1982-10-03 Production Casing Operation Performed
1982-10-03 Well Mode changed to Drilled and Cased
1982-10-31 Perforation Treatment Performed - Jet Perforation
1982-11-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-11-04 Perforation Treatment Performed - Jet Perforation
1982-11-05 Perforation Treatment Performed - Jet Perforation
1982-11-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-11-10 Perforation Treatment Performed - Jet Perforation
1982-11-11 Perforation Treatment Performed - Fractured
2004-03-16 Perforation Treatment Performed - Jet Perforation
2004-03-16 Well Log Performed
2004-03-17 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-11-13 Perforation Treatment Performed - Cement Plug
2004-11-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-11-14 Plug Back Performed
2004-11-14 Well Mode changed to Abandoned Zone
2004-11-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-11-19 Plug Back Performed
2004-11-20 Perforation Treatment Performed - Jet Perforation
2004-11-21 Perforation Treatment Performed - Fractured
2004-11-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-11-27 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-10-31 Perforation 2050.00 2053.50 13
2004-11-13 Cement Plug 2010.00 2045.00 0
2004-11-14 Packing Device Capped w/Cement 1967.70 2010.00 0
2004-11-19 Packing Device Capped w/Cement 1811.80 1819.80 0
2004-11-20 Perforation 1174.00 1177.00 17
2004-11-21 Fracture 1174.00 1177.00 0
2004-11-27 Packing Device Capped w/Cement 1157.00 1165.00 0
1982-11-01 Acid Treatment 2050.00 2053.50 0
1982-11-04 Perforation 2021.00 2022.00 13
1982-11-05 Perforation 2020.50 2021.00 13
1982-11-09 Packing Device Capped w/Cement 2045.00 2045.00 0
1982-11-10 Perforation 1832.50 1837.50 13
1982-11-11 Fracture 1832.50 1837.50 0
2004-03-16 Perforation 2019.00 2021.00 20
2004-03-17 Acid Treatment 2019.00 2022.00 0

For data sources see[4]



References