X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0445050212030

Well Details

Well ID: 0445050212030
Loading map...
Location: 03/12-02-044-05W5/0
Location Alias: 03/12-02-44-05 W5M
Location Alias 2: 03/12-02-044-05 W5/00
Country: Canada
Province: Alberta
Township: 044
Meridian: 5
Range: 05
Section: 02
County/Municipality: Clearwater County
Well Name: TAC HZ 103 PEMBINA 12-2-44-5
Operator Name: Tamarack Acquisition Corp.
License Number: 0475733
License Date: 2015-06-09
License Status: Amended
Spud Date: 2015-06-27
Final Drill Date: 2015-07-05
Well Total Depth: 4042.00 m
Surface Hole Latitude: 52.787672
Surface Hole Longitude: -114.628040

For data sources see[1][2]

Well History

Date Event
2015-06-09 Obtained License
2015-06-28 Surface Casing Operation Performed
2015-06-29 Direction Drilling Operation Performed - Deviate
2015-06-30 Direction Drilling Operation Performed - Horizontal
2015-07-05 Finished Drilling
2015-07-05 Well Log Performed
2015-07-05 Well Mode changed to Drilled and Cased
2015-07-06 Production Casing Operation Performed
2015-07-07 Rig Released
2015-08-01 Perforation Treatment Performed - Multi-Stage Fracture
2015-08-02 Perforation Treatment Performed - Multi-Stage Fracture
2015-08-04 Well Began Production
2015-08-04 Well Fluid changed to Crude Oil
2015-08-04 Well Mode changed to Flowing
2015-09-03 Well Fluid changed to Crude Oil
2015-09-03 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2015-06-29 1354.80 Deviate (5 - 79 degrees)
2015-06-30 1790.74 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-08-01 Multi-Stage Fracture 4024.60 4024.70 0
2015-08-01 Multi-Stage Fracture 3425.70 3425.80 0
2015-08-01 Multi-Stage Fracture 3351.80 3351.90 0
2015-08-01 Multi-Stage Fracture 3291.60 3291.70 0
2015-08-01 Multi-Stage Fracture 3217.80 3217.90 0
2015-08-01 Multi-Stage Fracture 3143.80 3143.90 0
2015-08-01 Multi-Stage Fracture 3083.70 3083.80 0
2015-08-01 Multi-Stage Fracture 3009.70 3009.80 0
2015-08-01 Multi-Stage Fracture 2949.60 2949.70 0
2015-08-01 Multi-Stage Fracture 2875.60 2875.70 0
2015-08-02 Multi-Stage Fracture 2801.70 2801.80 0
2015-08-01 Multi-Stage Fracture 3975.70 3975.80 0
2015-08-02 Multi-Stage Fracture 2741.50 2741.60 0
2015-08-02 Multi-Stage Fracture 2667.60 2667.70 0
2015-08-02 Multi-Stage Fracture 2607.40 2607.50 0
2015-08-02 Multi-Stage Fracture 2533.50 2533.60 0
2015-08-02 Multi-Stage Fracture 2459.50 2459.60 0
2015-08-02 Multi-Stage Fracture 2399.40 2399.50 0
2015-08-02 Multi-Stage Fracture 2325.40 2325.50 0
2015-08-02 Multi-Stage Fracture 2265.30 2265.40 0
2015-08-02 Multi-Stage Fracture 2191.30 2191.40 0
2015-08-02 Multi-Stage Fracture 2131.20 2131.30 0
2015-08-01 Multi-Stage Fracture 3901.90 3902.00 0
2015-08-02 Multi-Stage Fracture 2057.40 2057.50 0
2015-08-02 Multi-Stage Fracture 1983.60 1983.70 0
2015-08-02 Multi-Stage Fracture 1909.60 1909.70 0
2015-08-01 Multi-Stage Fracture 3841.70 3841.80 0
2015-08-01 Multi-Stage Fracture 3767.70 3767.80 0
2015-08-01 Multi-Stage Fracture 3693.80 3693.90 0
2015-08-01 Multi-Stage Fracture 3633.60 3633.70 0
2015-08-01 Multi-Stage Fracture 3559.70 3559.80 0
2015-08-01 Multi-Stage Fracture 3499.70 3499.80 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-08-01 2015-08-02 1,662 4,730 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 83.4977 N/A
20/40 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 14.4274 N/A
DWP-962 Calfrac Bactericide/Biocide Phosphonium. tetrakis(hydroxymethyl)-. sulfate (2:1) (THPS) 55566-30-8 100 0.0118 N/A
Water 7732-18-5 100 0.0125 N/A
DWP-913 Calfrac Clay Control Non-Hazardous Ingredients Trade Secret 100 0.0768 N/A
DWP-949 Calfrac Demulsifier Ethoxylated alcohols 8300 100 0.0881 N/A
Ethoxylated phenolic resin 8300 100 0.0905 N/A
Isobutyl ketone 8300 100 0.0881 N/A
Non-Hazardous Ingredients Trade Secret 100 0.1138 N/A
Organic acid salts 1 8300 100 0.0881 N/A
Organic acid salts 2 8300 100 0.0895 N/A
Organic acid salts 3 8300 100 0.0905 N/A
Nitrogen Calfrac Energizing Fluid Nitrogen 7727-37-9 100 4.9791 N/A
DWP-621 Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.0914 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-08-02 2015-08-03 Surface Water - Runoff 430
2015-08-08 2015-08-18 Groundwater - Non-saline less than or equal to 150m deep 1942
2015-07-10 2015-07-18 Groundwater - Non-saline less than or equal to 150m deep 2066
2015-07-31 2015-07-31 Surface Water - Lake 561

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 2853 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8623 0.0 0.0 0.0
2018 8751 0.0 0.0 0.0
2019 8399 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-07-07 No Incident Encountered 0.00 0.00
2015-09-03 No Incident Encountered 0.00 0.00

For data sources see[9]

References